1 |
박기범, 이순탁, 2004, 가뭄기간의 저수지 운영 방안에 관한 연구, 한국환경과학회지, 13(12), 1041-1048
|
2 |
Hashimoto, T., J. R. Stedinger and D. P. Loucks, 1982, Reliability, Resiliency, and Vulnerability Criteria For Water Resources System Performance Evaluation, W.R.R., 18(1), 14-20
DOI
|
3 |
Sand, G. M., 1984, An analytical investigation of water supply reservoir in parallel, Ph. D. thesis, Cornell Univ., Ithaca, N. Y
|
4 |
Johnson, S. A. and K. Staschus, 1991, Heuristic Operating Policies for Reservoir System Simulation, W.R.R., 27(5), 673-685
DOI
|
5 |
수자원 관리종합 정보시스템, http://wamis.or.kr/
|
6 |
Revelle, C., 1999, Optimizing Reservoir Resources Including. A New Model for Reservoir Reliability., John Willy & Sons Inc., 22-44
|
7 |
Mingyen, Tu., 2002, Optimal of Reservoir Operation and Rule Curves by Mixed-Interger Programming., Ph. D. thesis California Univ. Los Angels, 2-25
|
8 |
Lund, J. R. and J. Guzman, 1999, Derived Operating Rules for Reservoirs in Series or in Parallel, Journal of Water Resources Planning and Management, 125(3), 143-153
DOI
ScienceOn
|
9 |
Stedinger, J. R., 1984, The performance of LDR models for preliminary design and reservoir operation, W.R.R., 20(2), 215-224
DOI
ScienceOn
|
10 |
건설교통부, 1998, 한국수자원공사 기존댐 용수공급능력평가 보고서(낙동강수계), 1998. 12
|
11 |
Edward, J. C., 1950, New York control curves, J. Am. Water Works Assoc, 42(9), 823-857
|