• Title/Summary/Keyword: cutting site

Search Result 177, Processing Time 0.021 seconds

A Study on the Applicable Methods of Investigation for Cutting Slope Design (깍기 비탈면 설계에서의 지질조사 기법의 적용성 분석)

  • Lee, Su-Gon;Choi, Kyeong-Chim;Kim, Jae-Heun
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.9 no.1
    • /
    • pp.100-111
    • /
    • 2006
  • This study was carried out to increase the efficiency of site investigation through the evaluation of the applicable methods of investigation for cutting slope design. In an effort to find out the applicability of the method employed during the slope investigation, some tests were carried out on 6 subjects i.e location of weak zones, characteristics of discontinuities, distribution of strata, in situ tests for geo-technical properties, laboratory test and estimation of weathering. The method was highly applicable and produced expected results during the test of weak zones, discontinuities and distribution of strata. In order to apply the method to in- situ test for geo-technical properties and laboratory test on soil and rock slope, a statistic analysis of the existing data were required in advance. However its design applicability on rock slope was good although actual cases of application were not many due to limitation of the cases for investigation. The method was frequently referenced but not actually applied for anti seismic design test and estimation of weathering.

A Case Study on the Vibration Propagation Characteristics by Underwater Rock Cutting Work (수중 쇄암작업에 따른 진동 전파 특성에 관한 시공 사례)

  • Lim, Dae-Kyu;Shin, Young-Cheol;Kim, Young-Min;Lee, Chung-Eon
    • Explosives and Blasting
    • /
    • v.33 no.2
    • /
    • pp.25-39
    • /
    • 2015
  • The common underwater rock removal methods involve underwater blasting and crane's chisel dropping impact method. From an environmental point of view, these methods cause ground vibrations and underwater noise. At the site for this study, a method of dropping heavyweight chisel is selected to remove the underwater bedrock near the ferry rack in the course of improving the cargo handling ability of the loading dock. A prediction formula for the vibration was obtained based on the measurement and evaluation of the vibrations caused by the chisel dropping impacts during the test droppings. The prediction formula was successfully applied to the main construction for securing the stability of the structure.

Optimization of Processing Conditions According to Run-out During End-mill Round Machining (엔드밀 원형 가공 시 런아웃에 따른 가공조건 최적화)

  • Lee, Ha-Neul;Choi, Hee-Kwan;Kim, Young-Shin;Jeon, Euy-Sik
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.20 no.1
    • /
    • pp.57-65
    • /
    • 2021
  • With the increased utilization of CAM programs, end-mill processing is most commonly used for machining and metal processing. In particular, hole or shaft machining has high assembly precision, which inevitably leads to high utilization of end mills. However, the analysis of quality characteristics according to the process conditions of end mills is not performed systematically at the site, causing poor quality and productivity. The most influential factor of quality is the runout of the end mill. In this paper, the number of turns of the end mill, number of tool blades, cutting direction, and artificial runout volume were determined to identify the correlation between the epicenter, cylindricality, and surface roughness. Two types of end mills, three levels of runout, three levels of rotational speed, and two cutting directions were considered and 36 rounds of hole processing were conducted. For the analysis of shape characteristics according to the set process variables, the experimental planning method was applied to the measured specimen and the processing characteristics were analyzed according to the runout of the end mill through correlation analysis.

Operating Process of Transverse Type Roadheader for Tunnel Excavation in Korea (횡방향 타입 로드헤더의 터널면 절삭공정 고찰)

  • Min-Gi Cho;Jung-Woo Cho;Mun-Gyu Kim;Jae-Hoon Jeong;Sung-Hyun Choi
    • Tunnel and Underground Space
    • /
    • v.33 no.1
    • /
    • pp.1-9
    • /
    • 2023
  • Roadheaders have been operated in the construction of Korean tunneling projects. The note introduces operation manual and management case of transverse type roadhead in a Korean tunneling site. The cutting and reaction forces of axial and transverse type cutting heads were qualitatively analyzed. The shaping surfaces of tunnel faces were visualized in both cases of fixed and auto-controlled telescopic cylinder conditions. Excavating with fixed cylinder, concave surfaces were shaped on tunnel face. The total processes of sumping and shearing were illustrated for excavating hard rock tunneling. The supplementary graphical explanations for total tunneling procedures in Korea were provided.

Comparison of artificial intelligence models reconstructing missing wind signals in deep-cutting gorges

  • Zhen Wang;Jinsong Zhu;Ziyue Lu;Zhitian Zhang
    • Wind and Structures
    • /
    • v.38 no.1
    • /
    • pp.75-91
    • /
    • 2024
  • Reliable wind signal reconstruction can be beneficial to the operational safety of long-span bridges. Non-Gaussian characteristics of wind signals make the reconstruction process challenging. In this paper, non-Gaussian wind signals are converted into a combined prediction of two kinds of features, actual wind speeds and wind angles of attack. First, two decomposition techniques, empirical mode decomposition (EMD) and variational mode decomposition (VMD), are introduced to decompose wind signals into intrinsic mode functions (IMFs) to reduce the randomness of wind signals. Their principles and applicability are also discussed. Then, four artificial intelligence (AI) algorithms are utilized for wind signal reconstruction by combining the particle swarm optimization (PSO) algorithm with back propagation neural network (BPNN), support vector regression (SVR), long short-term memory (LSTM) and bidirectional long short-term memory (Bi-LSTM), respectively. Measured wind signals from a bridge site in a deep-cutting gorge are taken as experimental subjects. The results showed that the reconstruction error of high-frequency components of EMD is too large. On the contrary, VMD fully extracts the multiscale rules of the signal, reduces the component complexity. The combination of VMD-PSO-Bi-LSTM is demonstrated to be the most effective among all hybrid models.

Slope stability method establish and carry out in vertical slope for tunnel excavation (터널의 굴착을 위한 수직사면의 안정대책 방안 수립 및 시행)

  • Park, Chal-Sook;Kim, Jun-Yong;Kwan, Han;Kim, Min-Jo;Choi, Yu-Kyung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.992-1006
    • /
    • 2008
  • The tunnel type spillways is under construction to increasing water reservoir capacity in Dae-am dam. Cutting-slope adjacent to outlet of spillways had been originally designed to be 63 degrees and about 65m in height. Examination is carried out in preceding construction that it is caused to some problems possibility which of machine for slope cutting couldn't approach to the site, blasting for cutting slope might have negative influence on highway and roads nearby, and fine view along the Tae-hwa river would be eliminated. In order to establish stability of tunnel and more friendly natural environment that we are carry out detailed geological surface survey and analysis of slope stability. So, we are design and construct for tunnel excavation with possible method that it is keep up natural slope. The result of survey and analysis that natural slope was divided 3 zone(A, B, C zone). In A and B zone, in first removed floating rock, high tensile tension net is install that it prevent of release and falling of rock, in order to security during under working. In addition to, pre-stressed rock anchor is install purpose of security during tunnel excavation because of fault zone near vertical developed above excavation level. Zone C is relatively good condition of ground, design is only carry out random rock bolt. All zone are designed and constructed drainage hole for groundwater and surface water is easily drain. Desinged slpoe is harmony with near natural environment. Successfully, construction is completed.

  • PDF

Case Study on the Application of Chain Saw Machine for the Underground Marble Quarrying (갱내 대리석 채석을 위한 체인쏘머신 적용 사례연구)

  • Ju, Jaeyeol;Lee, Kwangpyo;Kim, Jaedong
    • Tunnel and Underground Space
    • /
    • v.23 no.3
    • /
    • pp.180-191
    • /
    • 2013
  • The purpose of this research was to find an optimal quarrying for marble by analyzing the applicability and the work efficiency of a chain saw machine newly introduced in the underground Baekwoon mine. From the test results of the physical properties of Baekwoon marble, which affects the efficiency of rock cutting, it was found to have similar physical characteristics as the ones which are now being produced in the other areas in Korea. And especially it shows isotropic property, which can be thought to be advantageous as a dimensional stone. To check the long-term quality of the marble as a stone material, several tests such as corrosion resistance test and abrasion test were carried out. It was found to be vulnerable to acid rain with decrease of weight and seismic wave velocity after applying artificial rain at pH 5.6 for 50 times. The percentage of wear from abrasion test was 22.67%. The working time and cutting speed of the chain saw machine were recorded and analyzed during the test-run at the quarry. The overall work cycle was assorted into 9 unit operations and the operating time per each unit was drawn. The operating times for the two cutting patterns, which could be possibly applicable to the work site, were compared. The results indicated that the pattern B, that the cutting sequence was set to minimize the movement of the machine, showed 6% less working hours than the pattern A, which first cuts the outer boundary. With cutting pattern analysis, the ore body in the Baekwoon mine was 3 dimensionally modeled and a quarrying plan considering the existing conditions of the marble was suggested.

Tree Diversity Changes over a Decade (2003-2013) in Four Inland Tropical Dry Evergreen Forest Sites on the Coromandel Coast of India

  • Pandian, Elumalai;Parthasarathy, Narayanaswamy
    • Journal of Forest and Environmental Science
    • /
    • v.32 no.2
    • /
    • pp.219-235
    • /
    • 2016
  • Forest tree diversity inventory and its periodical monitoring are important to understand changes in tree population structure and to provide information useful for biodiversity conservation and reserve management. In a long-term forest dynamics program in Indian tropical dry evergreen forest, this communication deals with tree diversity changes at decadal interval. The initial inventory of tree diversity was carried out in 2003, in four tropical dry evergreen forest sites - (much disturbed sites Shanmuganathapuram - SP and Araiyapatti - AP and moderately disturbed sites - Karisakkadu - KR and Maramadakki - MM) on the Coromandel Coast of peninsular India, by establishing four 1ha permanent plots, one in each site. In 2013, the four plots were re-inventoried for tree diversity (${\geq}10cm\;gbh$) changes which yielded 56 species from 46 genera and 26 families. The studied forest sites are threatened by disturbance due to multiple reasons; cutting of trees inside of the forest, grazing by goats, construction of temple approach road, and some aspects cultural attachment of local people like constructing new, additional strctures of temple by denuding a portion of forest etc.. Tree species richness over a decade increased by four species in site SP, two species in site AP, and one species in site KR, but decreased by one species in site MM. Tree density decreased drastically by 480 (28.92%) and 102 (12.63%) stems $ha^{-1}$ respectively in sites SP and AP, but moderately increased by 82 (12.09%) stems $ha^{-1}$ in site KR and 26 (3.46%) stems $ha^{-1}$ in site MM. Tree basal area declined in site KR from $21.6m^2$ to $20.26m^2ha^{-1}$ and in site SP from 21.1 to $20.38m^2ha^{-1}$, but increased from $19.1m^2$ to $19.43m^2$ and from 15.5 to $18.63m^2ha^{-1}$ in sites AP and MM respectively. Three tree species (Allophylus serratus, Maytenus emarginata and Ehretia pubescens) were lost out of the 57 species recorded in 2003, and two species (Jatropha gossypiifolia and Streblus asper) were new additions in ten years. The long-term forest monitoring data will be valuable to understand forest dynamics and for conservation and management of this and similar tropical forests.

Research on the on-site Seat Test Technology for the nuclear safety related valves (원전용 안전등급 밸브의 현장 폐쇄기밀시험 기술에 대한 연구)

  • Jung Hwan Seok;Kim Tae Sung
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.17 no.1
    • /
    • pp.8-17
    • /
    • 2021
  • The seat leakage test is required after the maintenance work on the valve seat. Either the test has been performed outside of the plant after cutting the valve from the pipe system or the simplified test has been performed so far. It was unable to perform the test at the plant site because it is hard to make a steady pressure on the valve inlet when it is installed in the pipe. This research aims to perform the leakage test in the nuclear power plant while it is installed in the pipe system. The mock-up test is performed by pressurizing the leak-off pipe on the valve body. The result is compared with traditional test result by pressurizing the valve inlet. Furthermore the chamber mock-up tests are performed under various conditions. The leak rate by the developed test using the leak-off pipe is found to be similar but greater than the leak rate by the existing test method. It implies that the test using the leak-off pipe is more conservative than the existing test. The methodology and the equipment which this paper suggests that on-site seat test is possible and the application of the technology could reduce the time and cost for the valve maintenance work significantly.

Form Integrated Wireless Sensor Network for Monitoring of Concrete Curing (콘크리트 양생 모니터링을 위한 거푸집 일체형 무선센서네트워크(WSN) 시스템)

  • Lee, Sung-Bok;Park, Won-Jun;Cho, Myoung-Won;Lee, Seung-Yeop;Lee, Han-Seung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.173-175
    • /
    • 2012
  • Temperature during concrete curing can be effectively used to predict the early age strength of concrete However, various current methods have limits to provide the temperature data in real time due to harsh working environment including frequent cutting of wires. This paper presents the results of our investigation of an all-in-one Wireless sensor network (WSN) for the management of the curing temperature of in-placed concrete at early curing stages. Also, the network device for transmission can be easily separated from the probe sensor part and reused consistently. The field experiment entailed measuring the curing temperature of concrete using the WSN. After fresh concrete was poured into the formworks, the signals were measured at a 150 m radius from the field office. The signal was acquired for 28 days without any dispersion or interruption at the construction site; therefore, this study confirms the applicability of the proposed system to a construction site.

  • PDF