Acknowledgement
본 연구는 2022년도 국토교통부(국토교통과학기술진흥원)의 '파일럿시험 및 현장데이터 기반 로드헤더 굴진율 수정 예측모델개발(22CTAP-C164191-02)' 사업을 통해 수행되었습니다.
References
- Chang, S.H., 2015, A Consideration for Mechanical Rock Excavation Focusing on TBM and Roadheader, Journal of the Koreacn Geotechnical Society, 52(5), 531-548. https://doi.org/10.12972/ksmer.2015.52.5.531
- Kim, Y.G., 2020, Roadheader Solution in Urban Tunnelling, Journal of the Koreacn Geotechnical Society, 36(2), 6-16.
- Kim, Y.G., Jeong, H.Y., Cho, J.W., Park, S.W., Lee, Y.J., Jang, J.S., and Choi. S.H., 2021, Roadheader Excavation Guide in Urban Tunnelling, Cir, Seoul, pp. 7-9.
- Middlebrook, T., 2017, The Confederation Line Ottawa LRT Project, ITA Tunnelling Awards 2017, AFTES Congress in Paris, November 13-16.
- Park, Y.T., Choi, S.W., Park, J.H., Lee, C.H., and Chang, S.H., 2013, Excavation Mechanism of Roadheader and Statistical Analysis of its Key Design Parameters Based on Database, Tunnel & Underground Space, 23(5), 428-441. https://doi.org/10.7474/TUS.2013.23.5.428
- Sandvik, 2016, Operator's Manual, en-US A.001.1 2016-09-21, with permission of Sandvik Suhjun.
- Tunneltalk, 2018, Precision roadheader and rockbolting on West Connex, VMT News Release, 20. Dec. 2018, www.tunneltalk.com.