• 제목/요약/키워드: crossing change

Search Result 151, Processing Time 0.023 seconds

A Size-Reduced CPW Balun with the Wilkinson Divider Structure Using a Crossing Structure (신호-접지 교차구조를 이용한 소형화된 CPW 월킨슨 분배기 구조의 발룬)

  • Lim Jong-Sik;Yang Hoe-Sung;Kim Dong-Joo;Jeong Yong-Chae;Ahn Dal;Kim Kwang-Soo
    • The Journal of Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.16 no.8 s.99
    • /
    • pp.835-841
    • /
    • 2005
  • In this paper, a novel sized-reduced CPW(Coplanar Waveguide) balun is proposed. It has a crossing structure between signal line and ground planes of CPW transmission line for the $180^{\circ}$ phase inversion. The$3{\lambda}/4$ CPW transmission line is reduced to ${\lambda}/4$ in physical length while the electrical length is preserved to $270^{\circ}$ by the $180^{\circ}$ phase inverting structure, while the previous balun by Lim et at. has a long $3{\lambda}/4$ transmission section to from the Wilkinson divider structure having out of phase between output ports. In addition, the measured data which show the crossing structure has the wanted $180^{\circ}$ phase change is presented in this work.

Analysis for Characteristics Method on Wind Pressure of Trains Crossing in Tunnel (터널내 교행 열차의 풍압에 대한 특성법 해석)

  • Nam, Seong-Won
    • Journal of the Korean Society for Railway
    • /
    • v.16 no.6
    • /
    • pp.454-459
    • /
    • 2013
  • Pressure waves are generated and propagate in a tunnel when train enters tunnel high speed. A compression wave due to the entry of train head propagates along the tunnel and is reflected at tunnel exit as an expansion wave. An expansion wave due to the entry of the train tail propagates along the tunnel and is reflected at tunnel exit as a compression wave. These pressure waves are repeatedly propagated and reflected at the tunnel entrance and exit. Severe pressure changes causes ear-discomfort for passengers in the cabin and micro pressure waves around the tunnel exit. It is necessary to analyze the transient pressure phenomena in tunnels qualitatively and quantitatively, because pressure change rate is considered as one of the major design parameters for optimal tunnel cross sectional area and repeated fatigue force on car body. In this study, we developed a characteristics method based on a fixed mesh system and boundary conditions for crossing trains and analyzed this system using an X-t diagram. The results of the simulation show that offsetting of pressure waves occurs for special entry conditions of a crossing train.

Operating characteristics of a superconducting DC circuit breaker connected to a reactor using PSCAD/EMTDC simulation

  • Kim, Geon-woong;Jeong, Ji-sol;Park, Sang-yong;Choi, Hyo-sang
    • Progress in Superconductivity and Cryogenics
    • /
    • v.23 no.3
    • /
    • pp.51-54
    • /
    • 2021
  • The DC system has less power loss compared to the AC system because there is no influence of frequency and dielectric loss. However, the zero-crossing point of the current is not detected in the event of a short circuit fault, and it is difficult to interruption due to the large fault current that occurs during the opening, so the reliability of the DC breaker is required. As a solution to this, an LC resonance DC circuit breaker combined a superconducting element has been proposed. This is a method of limiting the fault current, which rises rapidly in case of a short circuit fault, with the quench resistance of the superconducting element, and interruption the fault current passing through the zero-crossing point through LC resonance. The superconducting current limiting element combined to the DC circuit breaker plays an important role in reducing the electrical burden of the circuit breaker. However, at the beginning of a short circuit fault, superconducting devices also have a large electrical burden due to large fault currents, which can destroy the element. In this paper, the reactor is connected to the source side of the circuit using PSCAD/EMTDC. After that, the change of the fault current according to the reactor capacity and the electrical burden of the superconducting element were confirmed through simulation. As a result, it was confirmed that the interruption time was delayed as the capacity of the reactor connected to the source side increased, but peak of the fault current decreased, the zero-crossing point generation time was shortened, and the electrical burden of the superconducting element decreased.

A Study of the ZCP Estimation Methods considering Discretization Error and High Speed BLDC Sensorless Drive (이산화 오차를 고려한 ZCP 추정방법과 고속 BLDC 센서리스 구동에 관한 연구)

  • Seo, Eunjeong;Sohn, Jeongwon;Sunwoo, Myoungho;Lee, Wootaik
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.22 no.1
    • /
    • pp.95-102
    • /
    • 2014
  • This paper presents zero crossing point(ZCP) estimation methods considering discretization error for a high speed brushless DC(BLDC) motor drive. The ZCP is estimated by detecting the change of back-EMF polarity for the BLDC sensorless drive, and the discretization error exist on the estimated ZCP. The discretization error of the ZCP is a cause of the delay of a commutation timing of current and increment of a current ripple factor. Besides a delay of a ZCP estimation brings on the limitation of a speed range for the BLDC sensorless drive. The compensation method based on the error analysis with probability theory for reducing the effects of the discretization error of the ZCP is proposed. Also a ZCP estimation method according to the Back-EMF patterns is proposed to widen the speed range for the BLDC sensorless drive. The proposed methods are verified by the experiment.

Galloping analysis of stranded electricity conductors in skew winds

  • Macdonald, J.H.G.;Griffiths, P.J.;Curry, B.P.
    • Wind and Structures
    • /
    • v.11 no.4
    • /
    • pp.303-321
    • /
    • 2008
  • When first commissioned, the 1.6 km span 275kV Severn Crossing Conductor experienced large amplitude vibrations in certain wind conditions, but without ice or rain, leading to flashover between the conductor phases. Wind tunnel tests undertaken at the time identified a major factor was the lift generated in the critical Reynolds number range in skew winds. Despite this insight, and although a practical solution was found by wrapping the cable to change the aerodynamic profile, there remained some uncertainty as to the detailed excitation mechanism. Recent work to address the problem of dry inclined cable galloping on cable-stayed bridges has led to a generalised quasi-steady galloping formulation, including effects of the 3D geometry and changes in the static force coefficients in the critical Reynolds number range. This generalised formulation has been applied to the case of the Severn Crossing Conductor, using data of the static drag and lift coefficients on a section of the stranded cable, from the original wind tunnel tests. Time history analysis has then been used to calculate the amplitudes of steady state vibrations for comparison with the full scale observations. Good agreement has been obtained between the analysis and the site observations, giving increased confidence in the applicability of the generalised galloping formulation and providing insight into the mechanism of galloping of yawed and stranded cables. Application to other cable geometries is also discussed.

A Study of Stability Evaluation for Tunnel at the Fault Zone Crossing (단층대를 통과하는 터널의 안정성확보에 관한 연구)

  • 박인준;최정환;김수일
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2001.03a
    • /
    • pp.105-112
    • /
    • 2001
  • The purpose of this study is to assess the stability of tunnel for a high speed railway crossing the fault zone. The area where the tunnel crossed the fault zone can be unstable during construction and operation. Geotechnical investigations have been conducted to determine an optimum excavation method by obtaining the material properties around the fault zone and to check the stability of the tunnel. For the numerical analysis, the FLAC, numerical analysis code based on finite difference method, was utilized to analyze the behavior of the fault at three points having typical ground conditions. Based on the results of numerical analysis, the combinations of compaction grouting and LW grouting were determined as suitable methods for pre-excavation Improvement of the ground surrounding the tunnel opening. In conclusion, the stability of the tunnel construction for the high speed railway within the fault zone may be obtained by adopting the optimum excavation method and the reinforcement method. The numerical analysis based on FLAC program contains errors caused by assumptions used in numerical analysis, therefore constant monitoring with respect to the change of ground condition and groundwater is highly recommended to minimize the numerical error and the possibility of damage to tunnel.

  • PDF

Fabrication of All-Nb Josephson Junction Array Using the Self-Aligning and Reactive ion Etching Technique (Self-Aligning 기술과 반응성 이온 식각 기술로 제작된 Nb 조셉슨 접합 어레이의 특성)

  • Hong, Hyun-Kwon;Kim, Kyu-Tea;Park, Se-Il;Lee, Kie-Young
    • Progress in Superconductivity
    • /
    • v.3 no.1
    • /
    • pp.49-55
    • /
    • 2001
  • Josephson junction arrays were fabricated by DC magnetron sputtering, self-aligning and reactive ion etching technique. The Al native oxide, formed by thermal oxidation, was used as the tunneling barrier of Nb/$Al-A1_2$$O_3$Nb trilayer. The arrays have 2,000 Josephson junctions with the area of $14\mu\textrm{m}$ $\times$ $46\mu\textrm{m}$. The gap voltages were in the range of 2.5 ~2.6 mV and the spread of critical current was $\pm$11~14%. When operated at 70~94 ㎓, the arrays generated zero-crossing steps up to 2.1~2.4 V. To improve transmission of microwave power and prevent diffusion of oxygen into Nb ground-plane while depositing $SiO_2$dielectric, we applied a plasma nitridation process to the Nb ground-plane. The microwave power was well propagated in Josephson junction arrays with nitridation. The difference in microwave transmission 7an be interpreted by the surface impedance change depending on nitridation.

  • PDF

Short-term Fading Characteristics for Mobile Radio Signal in Built-up Areas (대도시 이동전파신호에 대한 단구간 페이딩 특성)

  • 송기홍;김종호;이동두;양기곤
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.19 no.5
    • /
    • pp.815-821
    • /
    • 1994
  • Short-term fading in a mobile radio channel is mainly caused by multipath reflected wave by local scatterers or natural obstacles surrounding a mobile unit. In this paper, we analyze probability density function(PDF), level crossing rate(LCR) and widths and depths of fades for the measured field strength data in Seoul and Daejeon areas. As a result, the satatistical distribution of signal variations within any small area with the constant mean value becomes the Rayleigh distribution The variation of fade depths is small regardless of the environment such as urban, suburban. etc. However, the variation of fade widths is large with the change of circumstantial structures and environment. the maximum level crossing rate is obtained near the mean value.

  • PDF

Novel Fast Peak Detector for Single- or Three-phase Unsymmetrical Voltage Sags

  • Lee, Sang-Hoey;Cha, Han-Ju
    • Journal of Electrical Engineering and Technology
    • /
    • v.6 no.5
    • /
    • pp.658-665
    • /
    • 2011
  • In the present paper, a novel fast peak detector for single- or three-phase unsymmetrical voltage sags is proposed. The proposed detector is modified from a single-phase digital phase-locked loop based on a d-q transformation using an all-pass filter (APF). APF generates a virtual phase with $90^{\circ}$ phase delay. However, this virtual phase cannot reflect a sudden change of the grid voltage in the moment of voltage sag, which causes a peak value to be significantly distorted and to settle down slowly. Specifically, the settling time of the peak value is too long when voltage sag occurs around a zero crossing, such as phase $0^{\circ}$ and $180^{\circ}$. This paper describes the operating principle of the APF problem and proposes a modified all-pass filter (MAPF) to mitigate the inherent APF problem. In addition, a new fast peak detector using MAPF is proposed. The proposed detector is able to calculate a peak value within 0.5 ms, even when voltage sag occurs around zero crossing. The proposed fast peak detector is compared with the conventional detector using APF. Results show that the proposed detector has faster detection time in the whole phase range. Furthermore, the proposed fast peak detector can be effectively applied to unsymmetrical three-phase voltage sags. Simulation and experimental results verify the advantages of the proposed detector and MAPF.

Two Cases of Mucosal Bridge Crossing the Membrane of Vocal Folds (양측 성문 점막 부위를 연결하는 성대 점막교(Mucosal Bridge) 2예)

  • Jung, Chan Min;Lee, Eun Jung;Lim, Jae-Yol;Choi, Hong-Shik
    • Korean Journal of Otorhinolaryngology-Head and Neck Surgery
    • /
    • v.61 no.11
    • /
    • pp.619-623
    • /
    • 2018
  • Mucosal bridges of vocal fold have been described as a parallel band to vocal folds with the presence of sulcus vocalis. However, the type of mucosal bridge crossing each vocal fold has not been well documented in the literature. Herein, we present two cases of mucosal bridge found in the vocal fold connecting the mid-portions of true vocal folds. Two patients who had no history of laryngeal trauma, surgery or oro-tracheal intubation visited our clinic due to voice change. Laryngoscopic examination revealed that they had a mid-portion mucosal band without any other mucosal lesions. Two patients underwent laryngomicrosurgery with pulsed dye laser. After the surgery, they showed significant improvement of voice quality.