A Simulation Study on a Workload-based Operation Planning Method in Container Terminals

  • Jeong, Yeon-Ho;Kim, Kap-Hwan;Woo, Youn-Ju;Seo, Bo-Hyeon
    • Industrial Engineering and Management Systems
    • /
    • 제11권1호
    • /
    • pp.103-113
    • /
    • 2012
  • A yard in a container terminal is a temporary storage space before containers are loaded onto the target vessel or delivered to consignees. For improving the utilization of the space in the yard and the efficiency of loading and discharging operations, it is important that operation plans must be carefully constructed in advance. A heuristic method is suggested to solve operation space planning problems considering workloads on handling equipment as well as space availabilities. The operation plans in this paper includes quay crane (QC) schedules and space plans for multiple vessels considering the workload in the container yard of container terminals. This paper evaluates the effectiveness of a space planning method and the performance of a new QC scheduling method using a simulation model.

조선 선행탑재 및 탑재 일정계획에서의 부하평준화를 위한 발견적 기법 (Heuristic Algorithms for Resource Leveling in Pre-Erection Scheduling and Erection Scheduling of Shipbuilding)

  • 우상복;류형곤;한형상
    • 산업공학
    • /
    • 제16권3호
    • /
    • pp.332-343
    • /
    • 2003
  • This paper deals with pre-erection scheduling and erection scheduling in shipbuilding. Among shipbuilding scheduling, the ship erection scheduling in a dock is one of the most important since the dock is the most critical resource in a shipyard. However, it is more reasonable to consider pre-erection scheduling and erection scheduling as unified because they compete with the common constrained resources such as labor, crane, space, and so on. It is very hard to consider two scheduling problems simultaneously, and hence, we approach them sequentially. At first, we propose space resource leveling heuristics in pre-erection scheduling given erection date. And then, considering the manpower resource determined by pre-erection scheduling, we also propose manpower resource leveling heuristics in erection scheduling. Various experimental results with real world data show that the proposed heuristics have good performance in terms of scheduling quality and time.

탠덤 크레인을 고려한 컨테이너터미널 선적 계획 (Ship Loading Plan for Tandem Crane in Container Terminals)

  • 권순철;신재영;김상진
    • 한국항해항만학회:학술대회논문집
    • /
    • 한국항해항만학회 2009년도 공동학술대회
    • /
    • pp.167-168
    • /
    • 2009
  • 컨테이너를 통한 무역이 나날이 늘어감에 따라 컨테이너터미널에서는 생산성을 향상시키기 위한 많은 노력을 하고 있다. 생산성을 향상시키기 위한 방법으로는 효율적인 운영전략, 또는 생산성이 낮은 장비 도입을 통한 방법이 있을 수 있다. 장비 도입의 측면에서 최근 국내 터미널에서 최근 많이 도입하고 있는 탠덤 크레인은 20'컨테이너를 동시에 4개, 40'컨테이너를 동시에 2개를 작업할 수 있는 안벽하역장비로 기존 크레인에 비하여 생산성을 향상시킬 수 있다. 본 논문에서는 이러한 탠덤 크레인의 효율성을 높일 수 있는 선적 계획을 위한 계량적 모형과 해법을 제시하고자 한다.

  • PDF

제약만족 탐색과 휴리스틱 교정기법을 이용한 최적 선석 및 크레인 일정계획 (Optimal Berth and Crane Scheduling Using Constraint Satisfaction Search and Heuristic Repair)

  • 류광렬;김갑환;백영수;황준하;박영만
    • 지능정보연구
    • /
    • 제6권2호
    • /
    • pp.1-14
    • /
    • 2000
  • 컨테이너 터미널에서의 선석 및 크레인 일정계획은 일정 기간 동안 입항 예정인 선박들을 대상으로 선석을 배정하고 접안 시기와 기간을 결정하며, 또한 각 선박별로 컨테이너를 싣고 내릴 크레인을 배정하되 각 크레인의 서비스 시작과 완료시간까지 지정하는 전 과정을 포함한다. 이 문제는 본적으로 서로 시간적 공간적으로 복잡한 제약 관계에 있는 여러 선석들과 크레인들을 충돌 없이 각 선박에 할당하여야 하는 제약조건 만족 문제인 동시에, 각 선박의 희망 입출항 시간을 최대한 존중하면서 터미널의 운영비용을 최소화할 수 있는 계획안을 도출해야 하는 최적화 문제이기도 하 다. 본 논문에서는 이 문제의 해결을 위해 제약만족 탐색기법을 동원하여 먼저 제약조건을 만족하는 해를 찾은 뒤, 제약조건을 만족하는 범위 내에서 보다 최적의 해를 유도해 내기 위해 휴리스틱 교정 기법을 제약만족 탐색기법의 틀 내에서 반복적으로 적용하는 방안을 제시하고 있다. 실제 부산 신선대 컨테이너 터미널의 데이터를 이용한 실험 결과 현장 전문가가 만족할 만한 수준의 일정 계획을 신속하게 수립할 수 있음을 확인하였다.

  • PDF

반복적 개선 탐색을 이용한 최적 선석 및 크레인 일정계획 (An Iterative Improvement Search for the Optimal Berth and Crane Scheduling)

  • 황준하
    • 한국컴퓨터정보학회논문지
    • /
    • 제9권4호
    • /
    • pp.117-125
    • /
    • 2004
  • 컨테이너 터미널에서의 선석 및 크레인 일정계획은 일정 기간 동안 입항 예정인 선박들을 대상으로 선석을 배정하고 접안 시기와 기간을 결정하며, 또한 각 선박별로 컨테이너를 싣고 내릴 크레인을 배정하되 각 크레인의 서비스 시작과 완료시간을 지정하는 전 과정을 포함한다. 이 문제는 기본적으로 다양한 제약조건을 만족해야 하는 제약만족 탐색 문제인 동시에, 각 선박의 희망 입출항 시간을 최대한 존중하면서 터미널의 운영 비용을 최소화할 수 있는 계획을 도출해야 하는 최적화 문제이기도 하다. 본 논문에서는 이 문제를 효과적으로 해결하기 위해 반복적 개선 탐색의 틀 내에서 제약만족 탐색기법을 적용하는 방안을 제시하고 있다. 실제 컨테이너 터미널에 대한 실험 결과 기존 알고리즘을 적용했을 때보다 더 좋은 계획을 수립할 수 있음을 확인하였다.

  • PDF

자동화 컨테이너 터미널의 복수 장치장 크레인을 위한 실시간 작업 계획 수립 (Real Time Scheduling for Multiple Yard Cranes in an Automated Container Terminal)

  • 박태진;최이;류광렬
    • 한국항해항만학회지
    • /
    • 제31권10호
    • /
    • pp.869-877
    • /
    • 2007
  • 본 논문은 교행이 불가능한 두 대의 자동화 크레인을 운영하는 자동화 컨테이너 터미널의 장치장을 대상으로 국지적 탐색 알고리즘을 이용해 실시간 작업계획을 수립하는 방안을 제안한다. 제안방안은 실시간 제약조건을 만족시키기 위해 현재 이후 일정 시간의 작업만을 작업 계획의 대상으로 삼으며, 장치장의 동적인 작업 특성을 고려하여 새로운 작업이 요청될 때마다 작업 계획을 다시 수립한다. 또한, 교행이 불가능한 두 대의 크레인을 운영할 때 발생할 수 있는 크레인 간의 작업 부하 불균형을 해소하기 위해 작업 계획 과정에서 상대 크레인에 의한 사전 재취급과 사전 이적을 통한 두 크레인 간의 협업을 가능하게 하였다. 시뮬레이션을 이용한 실험 결과 제안 방안이 휴리스틱 방안에 비해 우수하며, 크레인 간의 협업이 작업 효율 향상에 도움이 됨을 확인하였다.

컨테이너터미널 운영을 위한 의사결정문제의 소개 (Decision-making Problems for the Operation of Container Terminals)

  • 김갑환
    • 대한산업공학회지
    • /
    • 제33권3호
    • /
    • pp.290-302
    • /
    • 2007
  • This paper introduces several decision-making problems that need to be solved in order to facilitate the efficient operation of container terminals. These decision-making problems include the berth planning problem, the quay crane scheduling problem, the unload/load sequencing problem, the yard allocation problem, and the short-term scheduling of transporters and yard cranes. These problems can be classified into strategic decision problems, tactical decision problems, and real time operational decision problems. This paper proposes definitions of the problems that can be used to develop mathematical models for the problems.

조선 탑재일정의 부하 평준화를 위한 유전 알고리듬 (A Genetic Algorithm Application for the Load Balancing of Ship Erection Process)

  • 민상규;문치웅;이민우;정귀훈;박주철
    • 산업공학
    • /
    • 제13권2호
    • /
    • pp.225-233
    • /
    • 2000
  • In this paper, we develope a genetic algorithm for the erection scheduling in shipbuilding. Erection, the final manufacturing stage of shipbuilding, involves the landing and joining of blocks at drydock. Since several ships are built simultaneously at the same drydock and they compete with the common constrained production resource such as labor, space, and crane, we should consider both ship-specifics and common resource constraints for the desirable erection scheduling. Ship erection should also satisfy the predetermined dock cycle given from higher level production planning. Thus, erection schedule of a ship can be represented as a PERT/CPM project network with its own deadline. Since production resources are shared, the erection scheduling become the so-called multi-project scheduling problem with limited resources, which can not be solved easily due to the large size of project network. We propose a function as a minimization of load index which represented the load deviation over time horizon considering the yard production strategy. For the optical parameter setting, we tried various experiments. We verified that the proposed approach was effective to deal with the erection scheduling problem in shipbuilding.

  • PDF

야드 트랙터 대기시간을 고려한 크레인 듀얼 사이클 계획 (Quay Crane Dual-cycle Plan considering Yard Tractor waiting time)

  • 정창윤;신재영
    • 한국항해항만학회:학술대회논문집
    • /
    • 한국항해항만학회 2009년도 추계학술대회
    • /
    • pp.220-221
    • /
    • 2009
  • 컨테이너 터미널의 주요 생산성 지표 중에 하나는 안벽에서의 작업 생산성이다. 안벽 크레인(QC)의 작업 일정은 안벽 작업 생산성에 많은 영향을 준다. 최근 터미널 관리자들은 안벽 작업 생산성을 높이기 위해서 새로운 개념의 장비도입과 운영 방식에 많은 관심을 보이고 있다. 더블 사이클이나 듀얼 사이클은 새로운 장비를 도입하지 않고 운영상의 변화만으로 안벽 생산성을 높일 수 있는 방법으로서 많은 연구가 이루어지고 있다. 지금까지 대다수의 연구들은 안벽 작업을 병목으로 인식하고 거기에만 초점을 맞춘 연구들이 대부분이었다. 하지만 안벽 크레인이 야드 트랙터를 기다리는 시간을 고려하지 않는다면 더 많은 대기 시간이 발생하게 되어 오히려 효율성이 떨어질 수 있다. 따라서 본 논문에서는 야드 트랙터를 고려한 듀얼 사이클 운영을 위한 크레인 일정계획에 대해 해법을 제시하겠다.

  • PDF

국내 주요 산업별 스케줄링 기법의 연구동향 (Research Trends of Scheduling Techniques for Domestic Major Industries)

  • 이재용;신문수
    • 산업경영시스템학회지
    • /
    • 제41권1호
    • /
    • pp.59-69
    • /
    • 2018
  • The up-to-date business environment for Korean manufacturers is very complex and rapidly changing. Especially, the companies have faced with various changes derived from small quantity batch production, diversification of customer demands, and short life cycles of products. Consequently, the Korean manufacturing companies are in need of more efficient production planning and scheduling techniques. In this paper, the research trend of scheduling techniques is investigated to provide relevant information to researchers in this field. Furthermore, some implications for future researches are presented regarding literatures published in Korea over the last 10 years. This paper presents an entire investigation into Korean research works on scheduling (2,569 papers) that are published from 2007 to 2016. Especially, detailed analysis was carried out in the following three industry : 1) semiconductor, 2) shipbuilding and 3) automobile. In this paper, approaches to scheduling presented in the literature are categorized into the following three categories : 1) application, 2) algorithm, and 3) simulation modeling. First, in the semiconductor industry, scheduling techniques related to semiconductor cleaning processes, photolithography processes, chemical processes, transport and transport equipment have been found to be dominant. Second, the shipbuilding industry is focused on assembly processes, transporter, crane and various existing production management system. On the other hand, the scheduling research of the automobile industry is mainly focused on the vehicle movement routing and procurement supply-chain planning algorithm in terms of logistics. The conclusion of this study are expected to provide many implications for various types of academic and practical follow-up studies related to scheduling in consideration of main characteristics of semiconductor, shipbuilding and automobile industries.