• 제목/요약/키워드: cost-effective

Search Result 6,069, Processing Time 0.043 seconds

A Study on the Performance Evaluation of Form Using the Aluminum Alloy Frame Reinforced Panel (Aluminum 합금재 Frame을 이용한 벽체거푸집공법의 성능평가에 관한 연구)

  • 안재철;오상균;강병희
    • Journal of the Korea Institute of Building Construction
    • /
    • v.1 no.1
    • /
    • pp.135-142
    • /
    • 2001
  • This study is for the investigation of form using the aluminum-compound metal frame(Aluminum frame reinforced panel : AFR panel) which is improved in the capacity in the wall-concrete structure in steal of using the existing form which has problems such as, excessive exposure of cement, the loss of labor when it is constructed or disjointed, and it's economical efficiency compared with that of EURO Form. AFR panel passes the KS F 8006 test, and as a result of field test, it's displacement is satisfied with Specification. And using AFR panel is more economical than that of EURO Form because saving labor cost which plays a major part in cost saving in formwork is more effective in retrenching total cost than increment of material cost.

  • PDF

Development of Construction Cost Analysis Process Based on Structural Building Information Modeling (구조BIM기반 공사비 상세분석 프로세스 구축)

  • Lee, Seung-Il
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.237-238
    • /
    • 2012
  • As a way to improve productivity and integrated project delivery in construction industry, BIM(building Information Modeling) using IT technique is being studied and applied recently. S-BIM application Process was established that enable efficient work through Structural BIM detailed Model in consideration of the collaboration among relevant fields. This study has the objective applying S-BIM technique to enable effective Cost Analysis in initial design phase and presenting the method for practical works using Construction Cost Analysis Process based on S-BIM.

  • PDF

Control Algorithm for 4-Switch Inverter of 3-Phase SRM (3상 SRM 구동용 4-스위치 인버터 PWM 제어 알고리즘)

  • Yoon, Yong-Ho;Lee, Byoung-Kuk;Won, Chung-Yuen
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.58 no.3
    • /
    • pp.303-309
    • /
    • 2009
  • Switched Reluctance Motor(SRM) has become popular for industrial application, particularly for low medium drives due to the advantages of SRM over the other ac motors: SRM can be manufactured with low cost because it has a simple structure. But, asymmetric bridge converter that generally is used for driving requires two discrete switching devices and freewheeling diodes per phase, and cause the SRM drives to be complicated and to increase the cost of overall system. Therefore, this paper suggests a new type of 4-switch converter for SRM. 4-switch converter topology is studied to provide a possibility for the realization of low cost 3-phase SRM drive system. For effective utilization of the developed system, a new current control algorithm is designed and implemented to produce the desired dynamic performance. With the developed power conversion circuit and control scheme, it is expected that the proposed system can be widely used in commercial applications with reduced system cost.

Quantitative estimation system development for project similarity (주요 건물군의 유사도 정량화 측정 시스템)

  • Lee, Eun-Ji;Choi, Byoung-Il;Ko, Yong-Ho;Han, Seung-woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.162-163
    • /
    • 2014
  • Operation and maintenance stage consists the largest portion of project life cycle cost. Appropriate management and analysis of such stages have massive effect on the total project cost. The effective prediction of optimized repair period is one of main factors in ㅌ management. However, it has been analyzed that the prediction of appropriate repair period revealed limitations in reliability. Therefore, this study suggests a methodology of repair period prediction by dividing finished projects into similar groups with same properties to be compared with the target project using quantitative variables.

  • PDF

Design and Configuration of Reconfigurable ATM Networks with Unreliable Links

  • Lee, Jong-Hyup
    • ETRI Journal
    • /
    • v.21 no.4
    • /
    • pp.9-22
    • /
    • 1999
  • This paper considers a problem of configuring both physical backbone and logical virtual path (VP) networks in a reconfigurable asynchronous transfer mode (ATM) network where links are subject to failures. The objective is to determine jointly the VP assignment, the capacity assignment of physical links and the bandwidth allocation of VPs, and the routing assignment of traffic demand at least cost. The network cost includes backbone link capacity expansion cost and penalty cost for not satisfying the maximum throughput of the traffic due to link failures or insufficient link capacities. The problem is formulated as a zero-one non-linear mixed integer programming problem, for which an effective solution procedure is developed by using a Lagrangean relaxation technique for finding a lower bound and a heuristic method exploited for improving the upper bound of any intermediate solution. The solution procedure is tested for its effectiveness with various numerical examples.

  • PDF

Modeling of Remediation Design in Theoretically Heterogeneous Domain

  • Ko, Nak-Youl;Lee, Kang-Kun
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2004.09a
    • /
    • pp.302-306
    • /
    • 2004
  • Probabilistic approaches are applied to the problem of groundwater remediation design to consider the risk of design and heterogeneity of real condition. Hydraulic conductivity fields are generated by two methods. First, the homogeneous domains which have the hydraulic conductivity with log-normal distribution are constructed by using Latin Hypercube method. Second, random fields with a certain spatial correlation are also generated. The optimal solutions represented by cumulative distribution function (CDF) of relative cost are calculated by three different manners. The one uses the homogeneous domains with the optimal design of base condition. It shows that ver)'wide range of cost and the influences of different penalty values. The other one uses the random field with same design and shows narrow range of cost. These CDF can reflect on the risk of optimal solution in a simple exampie condition and be effective in estimating the cost of groundwater remediation.

  • PDF

Optimum design of axially symmetric cylindrical reinforced concrete walls

  • Bekdas, Gebrail
    • Structural Engineering and Mechanics
    • /
    • v.51 no.3
    • /
    • pp.361-375
    • /
    • 2014
  • The main aim of this paper is to investigate the relationship between thickness and height of the axially symmetric cylindrical reinforced concrete (RC) walls by the help of a meta-heuristic optimization procedure. The material cost of the wall which includes concrete, reinforcement and formwork, was chosen as objective function of the optimization problem. The wall thickness, compressive strength of concrete and diameter of reinforcement bars were defined as design variables and tank volume, radius and height of the wall, loading condition and unit cost of material were defined as design constants. Numerical analyses of the wall were conducted by using superposition method (SPM) considering ACI 318-Building code requirements for structural concrete. The optimum wall thickness-height relationship was investigated under three main cases related with compressive strength of concrete and density of the stored liquid. According to the results, the proposed method is effective on finding the optimum design with minimum cost.

A development of map building sensor system for mobile robot using low cost photo sensor

  • Hyun, Woong-Keun
    • Journal of information and communication convergence engineering
    • /
    • v.7 no.3
    • /
    • pp.281-285
    • /
    • 2009
  • Mobile robot has various sensors for describing the external world. The ultrasonic sensor widely applied to the most mobile robot to detect the obstacle and environment owing to low cost, its easy to use. However, ultrasonic sensor has major problems: the uncertainty information of sensor, false readings caused by specular reflection, multi path effect, low angular resolution and sensitivity to changes in temperature and humidity. This paper describes a sensor system for map building of mobile robot. It was made of low cost PSD (Position Sensitive Detector) sensor array and high speed RISC MPU. PSD sensor is cost effective and light weighting but its output signal has many noises. We propose heuristic S/W filter to effectively remove these noises. The developed map building sensor system was equipped on a mobile robot and was compared with ultrasonic sensor through field test.

Economic Evaluation of Investigation Method Using Cost-Benefit Analysis (비용편익분석을 이용한 사면조사기법의 경제성 평가)

  • Kim, Yong-Soo;Jung, Soo-Jung;Ahn, Sang-Ro
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.1076-1085
    • /
    • 2009
  • Recent heavy rains and typhoons broke down road slopes, which caused a hazard to safety. As a result, interests in the effective investment for disaster prevention is increasing. Measures of investigation method for slope have been taken, but the financial costs have never been analysed. This study applied the cost-benefit analysis theory used in public economics to the evaluation of the financial reasonability of management for slope. By applying cost-benefit analysis to road slope investigation method, the reduction of safety costs and resulting financial benefits can be seen and it also clarifies the reasonability and investment effects of slope management.

  • PDF

A Study on Quality Cost Management in Korean Shipping Company (우리나라 해운기업의 품질코스트 관리와 활용방안)

  • 김영모
    • Proceedings of KOSOMES biannual meeting
    • /
    • 2001.10a
    • /
    • pp.117-134
    • /
    • 2001
  • Quality costs seem to be one of the effective tools to assess quality management activities, but shipping industries have not controlled quality costs because of difficulty in cost itemization and cost data collection. This study has attempted to itemize shipping quality costs in detail and researches the composition of actual quality costs of sampled shipping companies in Korea. Result of research shows that stopping quality costs were composited by 24.3%, 3.8% and 71.8% of prevention costs, appraisal costs and failure costs, respectively and very high relationship between total qualify cost and other quality costs. This research also recommended practical methods for quality management by using indexes of quality costs.

  • PDF