• Title/Summary/Keyword: cost rate

Search Result 4,309, Processing Time 0.029 seconds

A Handover Management Scheme Based on User-Preferences and Network-Centric Approach

  • Khan, Murad;Park, Gisu;Cho, Wooseong;Seong, Gihyuk;Han, Kijun
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.9 no.1
    • /
    • pp.344-357
    • /
    • 2015
  • With the increase in a number of access technologies and data rates, a continuous connection among different networks is demand of the future wireless networks. In the last decade, user connectivity among different access networks remained a challenging job. Therefore, in this article, we proposed a user-centric and user-perspective based network selection mechanism for fast handover management in heterogeneous wireless networks. The proposed scheme selects the most appropriate network among available networks on the basis of resources i.e. cost, data rate, and link quality. Initially, we load the Media Independent Information Service (MIIS) with the information of cost and data rate provided by different network operators. Similarly, Mobile Node (MN) is also loaded with the user preferred cost and data rate for different applications. The MN obtains the information of cost and data rate from MIIS server upon a predefined threshold, and make a decision for handover according to its current cost and data rate. Furthermore, we employ an optimal threshold mechanism for initiation of the handover execution phase to minimize false handover indications. The proposed scheme is based on a survey for network selection and its implementation in C programming language to validate its performance and accuracy. The simulation result shows that the proposed scheme performs superior then the schemes present in the current literature.

An Empirical Study on the Cost Behavior in Coastal Fishery (연안어선어업 피해율 산정을 위한 원가행태에 관한 실증연구)

  • Kim, Woo-Soo;Kim, Kil-Yong
    • The Journal of Fisheries Business Administration
    • /
    • v.42 no.3
    • /
    • pp.1-13
    • /
    • 2011
  • It is necessary to set up a standard of estimation for annual unit price of sale and cost, damage rate for calculating compensation against fishery damage objectively. Two items on the unit price and cost have regulations but the damage rate has not, so it may occurred some problems such as reasonability and balance because the estimation should be handling by an appraiser's knowledge and experience. This study has analyzed using Regression model and searched variable costs and fixed costs about each items appraisers to operate in the present. It is compare profit damage index is calculated by an estimated model and an appraised example. This analysis showed highly 23-30% estimated model more than appraised example. It means the overestimation for fishery damage. This difference has caused by limited data, lack of sample, much difference in the standard deviation, and has not classified each kind of business and weight of coastal fishery, the overestimation more than what expected. This study has analyzed that the applied rate of fixed and variable cost in relation to the compensation in the cost of coastal fishery is very valuable.

An Evaluation on a calculation the increased cost of construction according to the Depth change of Concrete Slabs in Apartment Building by executing the law of floor impact sound (공동주택 슬래브 두께변화에 따른 공사비 증가 산정 평가 - 바닥충격음 법제화 시행에 따른 표준바닥구조를 중심으로 -)

  • Lee, Won-Yeul;Jeong, Sang-Min;Shin, Duck
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.2 s.16
    • /
    • pp.161-166
    • /
    • 2005
  • This study is to evaluate on the increased cost of construction according to the depth change of concrete slabs in apartment building. When we increased the depth of concrete slab from 150mm to 180, 210mm, the qualitative and cost of construction were calculated by the high-rise type, the unit-size type. As a result of this study, in 32 Pyong type, increment of construction cost rate appeared by $5.1\%$ in case of increase from slab 150mm to 180mm, and $10.0\%$ in case of increase from slab 150mm to 210mm. In 45 Pyong type, Increment of construction cost rate appeared by $5.7\%$ in case of increase from slab 150mm to 180mm, and $10.2\%$ in case of increase from slab 150mm to 210mm. In 55 Pyong type, Increment of construction cost rate appeared by $2.4\%$ in case of increase from slab 150mm to 180mm, and $8.9\%$ in case of increase from slab 150mm to 210mm.

A Study on the Economics Evaluation using Weighted Average Cost of Capital (가중평균자본비용을 이용한 투자 안의 경제성평가에 관한 연구)

  • 김태성;구일섭
    • Journal of the Korea Safety Management & Science
    • /
    • v.3 no.4
    • /
    • pp.135-144
    • /
    • 2001
  • The capital cost of the company is one that must be paid to the money owner as the price by using the money. The capital cost according to the source of money supply can be estimated by the expected profit rate undertaken by the use of the capital. But in the area of pre-existent economic evaluation, the evaluation of the company investment has been treated by the profit rate of the capital after considering the repayment conditions of the other's money or the interest. Thus in this study, in case the company makes an investment on various kinds of the capital at the same time, not make use of the capital as a one source, the economic evaluation of an investment should be handled by taking the weighted average cost of capital into consideration in proportion to the constitution of the capital cost by the sources of money supply, Especially, as the cost of the private money is very much connected with the profit rate through the stock market, the Capital Asset Pricing Model (CAPM) will be applied. This kind of economic evaluation method can be said to have much to do with the Economic Value Added : EVA) as well as to be highly thought as a standard to estimate the company' value recently To certify the usefulness of this approach, the case study of the output of the capital cost will be made for the purse of the economic evaluation of the alternative investment by using the financial statements of a motor company H.

  • PDF

Economic Analysis of Heat Pump System through Actual Operation (교육 시설에서의 히트 펌프 냉난방 시스템 실사용을 통한 경제성 분석)

  • Kim, Gil-Tae;Cheong, Seong-Ir;Joo, Ho-Young;Ahn, Young-Chull;Lee, Jae-Keun
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.19 no.6
    • /
    • pp.470-475
    • /
    • 2007
  • The present study has been conducted economic analysis through actual operation of electric heat pump (EHP) and gas engine driven heat pump (GHP) which are installed at the same building in the university. Cost items, such as initial cost, annual energy cost and maintenance cost of each system are considered to analyze life cycle cost (LCC) and economical efficiencies are compared. The initial cost is considered on the basis of actual cost, and annual energy cost is converted into the cost after measuring electricity and gas consumption a day LCC applied present value method is used to assess economical profit of both of them. Variables used to LCC analysis are electricity cost escalation rate, natural gas cost escalation rate, interest rate, and service lives when each of them are 4%, 2%, 8%, and 20 years. The result shows that EHP (148,257,306 won) is more profitable than GHP (161,239,296 won) by 8.05% (12,981,990 won).

Application study of heat storage type GSHP system in Apartment building with central cooling and heating facilities using life cycle cost analysis (LCC 분석을 이용한 중앙공급식 공동주택의 수축열식 지열원 히트펌프시스템의 적용연구)

  • Lee, Sang-Hoon;Park, Jong-Woo;Cho, Sung-Hwan
    • Proceedings of the SAREK Conference
    • /
    • 2009.06a
    • /
    • pp.1497-1502
    • /
    • 2009
  • The present study has been conducted economic analysis of heat storage type ground source heat pump system(HSGSHP) and normal ground source heat pump (GSHP) and central boiler system with individual air conditioning facility which are installed at the same building in the shared an apartment house. Cost items, such as initial construction cost, annual energy cost and maintenance cost of each system are considered to analyze life cycle cost (LCC) and simple payback period (SPP) with initial cost different are compared. The initial cost is a rule to the Government basic unit cost of production. LCC applied present value method is used to assess economical profit of both of them. Variables used to LCC analysis are prices escalation rate and interest rate mean values of during latest 10 years. The LCC result shows that HSGSHP (1,351,000,000won) is more profitable than central boiler system with individual air conditioning facility by 86.7% initial cost. And SPP appeared 8.0 year overcome the different initial cost by different annual energy cost.

  • PDF

Ordering Model of Fingerlings in Aquaculture Farm (치어 주문모형에 관한 연구)

  • Eh, Youn-Yang;Song, Dong-Hyo
    • The Journal of Fisheries Business Administration
    • /
    • v.48 no.3
    • /
    • pp.47-59
    • /
    • 2017
  • Fish mortality is the most important success factor in aquaculture management. To order fingerlings considering the effect of mortality is a important problem in aquaculture farm. This study is aimed to decision the number and size of fry in aquaculture farm. This study build the mathematical model that finds the value of decision variable to minimize total cost that sums up the fingerling purchasing cost, aquaculture farm operating cost and feeding cost under mortality constraint. The proposed mathematical model involve biological and economical variables: (1) number of fingerlings (2) fish growth rate (3) mortality (4) price of a fry (5) feeding cost, and (6) possible order period. Numerical simulation model presented here in. The objective of numerical simulation is to provide for decision makers to analyse and comprehend the proposed model. When extensive biological and cost data become available, the proposed model can be widely applied to yield more accurate results.

Optimal Capacity Determination of BESS for Customer using Investment Cost and Electric Cost (투자비용과 전기요금을 반영한 수용가 BESS의 최적용량 산정)

  • Park, Jin-Kyung;Baek, Young-Sik;Jeong, Ki-Seok;Park, Ji-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.2
    • /
    • pp.208-213
    • /
    • 2015
  • This study presents the estimation method for the optimal capacity of BESS(Battery Energy Storage System) in order to reduce the electric charges of common consumer. The daily optimal charge and discharge plan of BESS which satisfies the given constraints is established using linear programming through the change of rated output/rated capacity of the time that shows the electric charges in the highest reduced rate has been selected. There will be a problem to compare only reduced rate because the bigger the rated capacity, the more reduced rate is increased. Therefore, rated output/rated capacity of the time when the reduced amount of electric charges for a year is higher than the investment cost of BESS was selected.

Optimal Periodic Preventive Maintenance Schedule When Preventive Maintenance is Imperfect (예방보전이 불완전할 때 최적 주기적 예방보전 계획)

  • Kim, Dae-Kyung;Shin, Sang-Wook;Lim, Jae-Hak
    • Journal of Korean Society for Quality Management
    • /
    • v.35 no.4
    • /
    • pp.140-146
    • /
    • 2007
  • In this paper, we consider a periodic imperfect preventive maintenance(PM) policy in which the system's failure rate after each PM remains unchanged. The system undergoes only minimal repairs at failures between PMs. Exact mathematical formula of the expected cost rate per unit time is derived. Optimal number of PMs and optimal maintenance period are derived by minimizing the expected cost rate per unit time. A numerical example is provided to illustrate the proposed approach under Weibull lifetime distribution.

A Study on Optimal Preventive Maintenance Policy When Failure Rate is Exponentially Increasing After Repair (수리 후 고장률이 지수적으로 증가하는 경우에 최적 예방보전 정책)

  • Kim, Tae-Hui;Na, Myung-Hwan
    • Journal of Applied Reliability
    • /
    • v.11 no.2
    • /
    • pp.167-176
    • /
    • 2011
  • This paper introduces models for preventive maintenance policies and considers periodic preventive maintenance policy with minimal repair when the failure of system occurs. It is assumed that minimal repairs do not change the failure rate of the system. The failure rate under prevention maintenance received an effect by a previously prevention maintenance and the slope of failure rate increases the model where it considered. Also the start point of failure rate under prevention maintenance considers the degradation of system and that it increases quotient, it assumed. Per unit time it bought an expectation cost from under this prevention maintenance policy. We obtain the optimal periodic time and the number for the periodic preventive maintenance by using Nakagawa's Algorithm, which minimizes the expected cost per unit time.