• Title/Summary/Keyword: cost of holding safety stock

Search Result 10, Processing Time 0.023 seconds

Determination of Safety Stock in a Multi-Echelon Inventory System (다단계 재고 시스템의 안전재고의 결정)

  • ;;Kim, J. J.;Shim, J. H.
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.15 no.1
    • /
    • pp.63-72
    • /
    • 1990
  • This problem in this paper concerns the determination of safety stock for multi-echelon invenetory system. In this model the criterion is to minimize system safety stock subject to a service level constraint and expected annual total cost. Then, safety stock is determined by minimizing expected annual total cost and satisfying given service level. This expected annual total cost is obtained by expected total inventory holding cost plus the expected total stockout cost. Numerical example is given in a three-echelon inventory system. The results obtained by the use of the Hill Algorithm.

  • PDF

An Inventory Policy of the Minimum Cost with the Product Availability in CRM (CRM에서 제품 유용성을 고려한 최소비용 재고정책)

  • Lim Joo-Young;Kim Hyun-Soo;Choi Jin-Yeong
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.28 no.2
    • /
    • pp.117-124
    • /
    • 2005
  • This study tries to develop the models of measuring the level of product availability accommodated for features of specific customers dividing customers into VIP customers and general customers. Functions of costs that the models are composed of are cost of holding safety stock and cost of lost opportunities. The existing model of measuring the level of product availability which focused on cost of holding safety stock for VIP customers should be reinforced by considering cost of lost opportunities caused by general customers' quitting trades with a company. This study tries to present realistic solutions for problems in making decisions related to the total inventory. This study concludes that the model of the level of product availability meeting general customers' needs is more efficient according to increasing of a latent demand of the general customers who quit trades with a company and the cost of lost opportunities.

A Study on the Operation of Distribution System for the Rationalization of Safety Stock under the Price Discount (가격할인하 안전재고 합리화를 위한 분배시스템 운영에 관한 연구)

  • Kim, Byeong-Chan;Kim, Hong-Ki
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.32 no.4
    • /
    • pp.45-52
    • /
    • 2009
  • The objective of this was to improve a transportation cost relation between Central Distribution Centers(CDCs) and Regional Distribution Centers(RDCs), to control inventory cost concerning safety stock for each service level, by reviewing distribution steps connecting CDCs and RDCs under the price discount. It was also to examine and compare operating costs for the following two alternative suggestions for setting the service standard as a counter measure for a stock-out of the distribution network system management. First, provision by dispersing the safety stock to the CDCs and RDCs; and second, exclusive provision of the safety stock only to the RDCs. The cost comparison analysis was made for each category of purchase costs, regular transportation costs, express transportation costs, and inventory holding costs.

A Study of Determining the Economical Shortage Ratio for Safety Stock - With Emphasis on the Rolling Stock Part - (안전재고의 경제적 품질률 결정에 관한 연구 철도차량부품을 중심으로)

  • 이근희;이승구
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.11 no.17
    • /
    • pp.47-54
    • /
    • 1988
  • Korean National Railroad(K.N.R) playing a important role in land transportation gives us many problems to solve considering proper management of National Budget and development of the state of operation by maintaining train parts rationally as public services. According this study is to show inventory provision system for deciding the safety inventory level as the better rational method. Bibliography for this study is limited to only three kinds of seven brakes-shoe which is produced by T workshop in Korean National Railroad. To reduce the holding cost coming from the want of the stock and shortage cost of the stock expected. This study is to present a ratio of shortage on the stock permitted for the last definite period and the demand result forecast per month.

  • PDF

Inventory Policies for Multi-echelon Serial Supply Chains with Normally Distributed Demands (정규분포를 따르는 다단계 시리얼 공급사슬에서의 재고 정책)

  • Kwon, Ick-Hyun;Kim, Sung-Shick
    • Journal of the Korea Safety Management & Science
    • /
    • v.8 no.3
    • /
    • pp.115-123
    • /
    • 2006
  • The main focus of this study is to investigate the performance of a clark-scarf type multi-echelon serial supply chain operating with a base-stock policy and to optimize the inventory levels in the supply chains so as to minimize the systemwide total inventory cost, comprising holding and backorder costs as all the nodes in the supply chain. The source of supply of raw materials to the most upstream node, namely supplier, is assumed to have an infinite raw material availability. Retailer faces random customer demand, which is assumed to be stationary and normally distributed. If the demand exceeds on-hand inventory, the excess demand is backlogged. Using the echelon stock and demand quantile concepts and an efficient simulation technique, we derive near optimal inventory policy. Additionally we discuss the derived results through the extensive experiments for different supply chain settings.

A Study on Developing an Integrated Model of Facility Location Problems and Safety Stock Optimization Problems in Supply Chain Management (공급사슬관리에서 생산입지선정 문제와 안전재고 최적화 문제의 통합모형 개발에 관한 연구)

  • Cho Geon
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.31 no.1
    • /
    • pp.91-103
    • /
    • 2006
  • Given a bill of materials (BOM) tree T labeled by the breadth first search (BFS) order from node 0 to node n and a general network ${\Im}=(V,A)$, where V={1,2,...,m} is the set of production facilities and A is the set of arcs representing transportation links between any of two facilities, we assume that each node of T stands for not only a component. but also a production stage which is a possible stocking point and operates under a periodic review base-stock policy, We also assume that the random demand which can be achieved by a suitable service level only occurs at the root node 0 of T and has a normal distribution $N({\mu},{\sigma}^2)$. Then our integrated model of facility location problems and safety stock optimization problem (FLP&SSOP) is to identify both the facility locations at which partitioned subtrees of T are produced and the optimal assignment of safety stocks so that the sum of production cost, inventory holding cost, and transportation cost is minimized while meeting the pre-specified service level for the final product. In this paper, we first formulate (FLP&SSOP) as a nonlinear integer programming model and show that it can be reformulated as a 0-1 linear integer programming model with an exponential number of decision variables. We then show that the linear programming relaxation of the reformulated model has an integrality property which guarantees that it can be optimally solved by a column generation method.

Look-ahead Based Distribution Planning for Capacitated Multi-stage Supply Chains (생산 능력 제한이 존재하는 다단계 공급망을 위한 Look-ahead 기반의 분배계획)

  • Roh, Joo-Suk;Kwon, Ick-Hyun;Kim, Sung-Shick
    • Journal of the Korea Safety Management & Science
    • /
    • v.8 no.5
    • /
    • pp.139-150
    • /
    • 2006
  • The aim of this study is to establish an efficient distribution planning for a capacitated multi-stage supply chain. We assume that the demand information during planning horizon is given a deterministic form using a certain forecasting method. Under such a condition, we present a cost effective heuristic method for minimizing chain-wide supply chain inventory cost that is the sum of holding and backorder costs by using look-ahead technique. We cope with the capacity restriction constraints through look-ahead technique that considers not only the current demand information but also future demand information. To evaluate performance of the proposed heuristic method, we compared it with the extant research that utilizes echelon stock concept, under various supply chain settings.

Multiple Replenishment Contract with Purchase Price Discount (구매비용할인을 고려한 다회보충계약)

  • Jung, Bong-Ryong;Kim, Jong-Soo
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.27 no.4
    • /
    • pp.345-351
    • /
    • 2001
  • We are concerned with a multiple replenishment contract with a purchase price discount in a supply chain. The chain is composed of one supplier, one buyer and consumers for a product. The replenishment contract is based upon the well-known (s, Q) policy but allows contracting several firmed orders at a time with a price discount. Due to a larger forecast error of the future demand, the buyer should keep a higher level of safety stock to provide the same level of service of the usual (s, Q) policy but can reduce his purchase cost by placing larger quantity. Thus there exists a trade-off between the price discount and inventory holding cost. We present a model for the contract and an algorithm to find the optimum number of the firmed orders. Computer experiments show that the algorithm finds the global optimum solution very fast.

  • PDF

A Long-term Replenishment Contract for the ARIMA Demand Process (ARIMA 수요자정을 고려한 장기보충계약)

  • Kim Jong Soo;Jung Bong Ryong
    • Proceedings of the Society of Korea Industrial and System Engineering Conference
    • /
    • 2002.05a
    • /
    • pp.343-348
    • /
    • 2002
  • We are concerned with a long-term replenishment contract for the ARIMA demand process in a supply chain. The chain is composed of one supplier, one buyer and consumers for a product. The replenishment contract is based upon the well-known (s, Q) policy but allows us to contract future replenishments at a time with a price discount. Due to the larger forecast error of future demand, the buyer should keep a higher level of safety stock to provide the same level of service as the usual (s, Q) policy. However, the buyer can reduce his purchase cost by ordering a larger quantity at a discounted price. Hence, there exists a trade-off between the price discount and the inventory holding cost. For the ARIMA demand process, we present a model for the contract and an algorithm to find the number of the future replenishments. Numerical experiments show that the proposed algorithm is efficient and accurate.

  • PDF

A Quantitative Model for a Supply Chain Design

  • Cho, Geon;Ryu, Il;Lee, Kyoung-Jae;Park, Yi-Sook;Jung, Kyung-Ho;Kim, Do-Goan
    • Proceedings of the Korea Society of Information Technology Applications Conference
    • /
    • 2005.11a
    • /
    • pp.311-314
    • /
    • 2005
  • Supply chain optimization is one of the most important components in the optimization of a company's value chain. This paper considers the problem of designing the supply chain for a product that is represented as an assembly bill of material (BOM). In this problem we are required to identify the locations at which different components of the product arc are produced/assembled. The objective is to minimize the overall cost, which comprises production, inventory holding and transportation costs. We assume that production locations are known and that the inventory policy is a base stock policy. We first formulate the problem as a 0-1 nonlinear integer programming model and show that it can be reformulated as a 0-1 linear integer programming model with an exponential number of decision variables.

  • PDF