• Title/Summary/Keyword: cost method

Search Result 12,469, Processing Time 0.051 seconds

Optimum Structural Design of D/H Tankers by using Pareto Optimal based Multi-objective function Method (Pareto 최적점 기반 다목적함수 기법에 의한 이중선각유조선의 최적 구조설계)

  • Na, Seung-Soo;Yum, Jae-Seon;Han, Sang-Min
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.42 no.3
    • /
    • pp.284-289
    • /
    • 2005
  • A structural design system is developed for the optimum design of double hull tankers based on the multi-objective function method. As a multi-objective function method, Pareto optimal based random search method is adopted to find the minimum structural weight and fabrication cost. The fabrication cost model is developed by considering the welding technique, welding poses and assembly stages to manage the fabrication man-hour and process. In this study, a new structural design is investigated due to the rapidly increased material cost. Several optimum structural designs on the basis of high material cost are carried out based on the Pareto optimal set obtained by the random search method. The design results are compared with existing ship, which is designed under low material cost.

A Method of Power Transmission Pricing using Power Flow Tracing (전력조류 추적법을 이용한 송전요금 산정법)

  • Ro, Kyoung-Soo
    • Proceedings of the KIEE Conference
    • /
    • 2001.11b
    • /
    • pp.424-428
    • /
    • 2001
  • The methodologies of power transmission pricing are normally divided into two categories such as marginal cost method and embedded cost allocation method. This paper, first, discusses the possible problems that can occur when the marginal cost method is applied to pricing the transmission services. Next, the paper proposes a method to apply the power flow tracing to the transmission network charge. The result of the power flow tracing method is then used in MW-mile method to charge individual loads for the use of transmission network. Effectiveness of the algorithm is verified by computer simulations.

  • PDF

The Estimation Analysis Method of the Annual Operation Cost of Korean High-rise Condominiums

  • Ko, Eun Hyung;Choi, Jun Young
    • Architectural research
    • /
    • v.7 no.1
    • /
    • pp.11-18
    • /
    • 2005
  • In today's building industry the emphasis has been geared more towards construction, thus building maintenance and life cycle have been neglected until now. A direct result of this neglect is the rapid aging of building, which leads to more cost-effective decision making methods for the prolongation of building life span. The following study is conducted in the area of Daegu and Seoul in order to develop the estimation analysis method of the annual operation cost of the Korean high-rise condominiums for the cost-effective decision making support through mathematical and statistical analyses including the present value and standardized measurement corrections. Based on the assumption that the life expectancy of the high rise condominium is 50 years, initial cost is ₩421,212/$m^2$, and a total sum of yearly operation cost during life expectancy is ₩2,154,499//$m^2$), yearly accumulated operation cost is shown as below: $AOC=0.7097t^4-38.803t^3+806.95t^2+11045t-496.52$ ($R^2=0.98$) (Here, AOC = Accumulated Operation Cost, t = given years)

Estimation of Development Valuation at Marine Tourism complex (해양레저관광단지의 개발가치 추정)

  • Jang, Woon-Jae;Keum, Jong-Soo
    • Proceedings of KOSOMES biannual meeting
    • /
    • 2008.05a
    • /
    • pp.69-74
    • /
    • 2008
  • The aim of this paper is to calculation benefit cost for development of Hwawon leisure & tourism complex. To calculation benefit cost, this paper propose a advanced travel cost method(ATCM) which is to consider Improved travel cost method(ITCM) and variable traffic units with confidence degree cf decision-maker. At the result of calculation, total benefit costs are 292805 million won at 52% of confidence degrees and 10% discount rates.. Also total benefit cost is 304517 million won at 4% of GDP growth rate is 4%.

  • PDF

Time-Cost Trade-Off by Lead-Time Adjustment in the PDM Network

  • Kim, Seon-Gyoo
    • Architectural research
    • /
    • v.11 no.2
    • /
    • pp.43-49
    • /
    • 2009
  • Since the late 1980s, the schedule technique applied to the construction industry around the world has rapidly changed from the traditional ADM (Arrow Diagramming Method) to the PDM (Precedence Diagramming Method) technique. The main reason for this change is to overcome the limits and inconveniences of the traditional ADM technique. The time-cost trade-off is one of the core scheduling techniques to establish the best optimized combination plan in terms of a relationship between the cost and schedule. However, most of the schedule-related textbooks and research papers have discussed and proposed applications of a time-cost trade-off technique based only on the Finish to Start relationship. Therefore, there are almost no consideration and discussion of problems or restrictions that emerge when the time-cost trade-off technique is applied to the PDM network that has overlapping relationships. This paper proposes the lead-time adjustment method as a methodology for overcoming some restrictions that are encountered when the time-cost trade-off technique is applied to the overlapping relationships of the PDM network.

Analysis of Cost-Increasing Factors in High-rise Building Construction Projects Using Delphi Method (델파이 기법을 이용한 초고층 건축시공의 공사비 상승요인 분석방법에 관한 연구)

  • Lee, Byeong-Hun;Jin, Hyun-Soo;Kim, Kyong-Hoon;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.105-109
    • /
    • 2010
  • Nowadays, the construction of high-rise building is rapidly increasing. There are many cost-increasing factors to the management in the high-rise building construction. For large and complex projects like the high-rise building construction, the more systematic methods and tools are needed for cost control. It is important to identify major cost control items and to manage them for effective cost management in the high-rise building construction. This study proposes a method of identifying major cost-increasing factors in the high-rise building construction based on the Delphi method.

  • PDF

Structural Cost Optimization for Building Frame System Using High-Strength Steel Members (고강도 강재를 사용한 건물골조방식 구조물의 구조비용 최적화)

  • Choi Sang-Hyun;Kwon Bong-Keun;Kim Sang-Bum;Seo Ji-Hyun;Kwon Yun-Han;Park Hyo-Seon
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2006.04a
    • /
    • pp.541-548
    • /
    • 2006
  • This study presents a structural cost optimization method for building frame system using high-strength steel members. In, this optimization method, the material cost of steel member is involved in objective function to find the optimal cost of building frame systems. Genetic Algorithm is adopted to optimizer to find structural cost optimization. The proposed adapted to structural design of 3.5 stories example buildings with buildings frame systems. As a result, The proposed optimization method can be effectively adapted to cost optimization of building frame systems using high-strength steel members.

  • PDF

SCHEMATIC ESTIMATING MODEL FOR CONSTRUCTION PROJECTS -USING PRICIPLE COMPONENT ANALYSIS AND STRUCTURAL EQUATION METHOD

  • Young-Sil Jo;Hyun-Soo Lee;Moon-Seo Park
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1223-1230
    • /
    • 2009
  • In the construction industry, Case-Based Reasoning (CBR) is considered to be the most suitable approach and determining the attribute weights is an important CBR problem. In this paper, a method is proposed for determining attribute weights that are calculated with attribute relation. The basic items of consideration were qualitative and quantitative influence factors. These quantitative factors were related to the qualitative factors to develop a Cost Drivers-structural equation model which can be used to estimate construction cost by considering attribute weight. The process of determining the attribute weight-structural equation model consists o 4 phases: selecting the predominant Cost Drivers for the SEM, applying the Cost Driers in the SEM, determining and verifying the attribute weights and deriving the Cost Estimation Equation. This study develops a cost estimating technique that complements the CBR method with a Cost Drivers-structural equation model which can be actively used during the schematic estimating phases of construction.

  • PDF

Reliability Evaluation of Power Distribution Systems Considering the Momentary Interruptions-Application of Monte Carlo Method (순간정전을 고려한 배전계통에서의 신뢰도 평가-몬테카를로 방식의 적용)

  • Sang-Yun Yun;Jae-Chul Kim
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.52 no.1
    • /
    • pp.9-16
    • /
    • 2003
  • In this paper, we propose a reliability evaluation method considering the momentary interruptions of power distribution systems. The results of research are concentrated on two parts. One is the analytic and probabilistic reliability evaluation of power distribution system considering the momentary interruptions and the other is the reliability cost evaluation that unifies the cost of sustained and momentary interruptions. This proposed reliability cost evaluation methodology is also divided into the analytic and probabilistic approach and the time sequential Monte Carlo method is used for the probabilistic method. The proposed methods are tested using the modified RBTS (Roy Billinton Test System) form and historical reliability data of KEPCO (Korea Electric Power Corporation) system. Through the case studies, it is verified that the proposed reliability evaluation and its cost/worth assessment methodologies can be applied to the actual reliability studies.

The Study on the Optimal Operation Strategies for Central Cooling System Considering Energy Cost (Focus on a medical facility) (에너지 비용을 고려한 중앙냉방시스템 최적운영 방안에 관한 연구(의료시설을 중심으로))

  • Lee, Ga-Ram;Song, Jae-Yeob
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.16 no.4
    • /
    • pp.1-8
    • /
    • 2020
  • For a central cooling system of a medical facility composed of absorption chiller and screw chiller, the study was conducted on how to minimize the energy cost. In consideration of the energy cost, the optimal operation method in which the operation method of the heat source is changed according to the size of the cooling load was derived through simulation analysis. When applying the optimal operation method, the indoor environment, energy consumption, and energy cost were analyzed and compared with the reference operation method.