• Title/Summary/Keyword: cost forecast

Search Result 220, Processing Time 0.028 seconds

BIM-BASED TIME SERIES COST MODEL FOR BUILDING PROJECTS: FOCUSING ON MATERIAL PRICES

  • Sungjoo Hwang;Moonseo Park;Hyun-Soo Lee;Hyunsoo Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.1-6
    • /
    • 2011
  • As large-scale building projects have recently increased for the residential, commercial and office facilities, construction costs for these projects have become a matter of great concern, due to their significant construction cost implications, as well as unpredictable market conditions and fluctuations in the rate of inflation during the projects' long-term construction periods. In particular, recent volatile fluctuations of construction material prices fueled such problems as cost forecasting. This research develops a time series model using the Box-Jenkins approach and material price time series data in Korea in order to forecast trends in the unit prices of required materials. Building information modeling (BIM) approaches are also used to analyze injection times of construction resources and to conduct quantity take-off so that total material prices can be forecast. To determine an optimal time series model for forecasting price trends, comparative analysis of predictability of tentative autoregressive integrated moving average (ARIMA) models is conducted. The proposed BIM-based time series forecasting model can help to deal with sudden changes in economic conditions by estimating material prices that correspond to resource injection times.

  • PDF

Component Commonality and Order Matching Rules in Make-to-Forecast Production

  • Morikawa, Katsumi;Deguchi, Yusuke;Takahashi, Katsuhiko;Hirotani, Daisuke
    • Industrial Engineering and Management Systems
    • /
    • v.9 no.3
    • /
    • pp.196-203
    • /
    • 2010
  • Make-to-forecast production is a way to realize high customization and fast responsiveness. This study firstly investigates the effect of introducing a common component in a make-to-forecast production environment. The common component can eliminate a modification step, which is a major cost component in make-to-forecast production. It is illustrated, however, that introducing a versatile component that merely covers several variants is unattractive, and thus adding values to the common component is inevitable in this environment. Secondly, an order-matching rule under the condition that two partially overlapped delivery lead time intervals exist is proposed. The rule considers the effect of matching orders to units that can cover both intervals. An alternative re-matching rule is also developed and examined. Numerical experiments clarify that the proposed rule generally realizes higher contribution ratio and lower percentages of orphans and rejected orders. The proposed re-matching rule increases the average contribution ratio at the expense of increased orphans and order rejections.

Enhancing the Satisfaction Value of User Group Using Meteorological Forecast Information: Focused on the Precipitation Forecast (기상예보 정보 사용자 그룹의 만족가치 제고 방안: 강수예보를 중심으로)

  • Kim, In-Gyum;Jung, Jihoon;Kim, Jeong-Yun;Shin, Jinho;Kim, Baek-Jo;Lee, Ki-Kwang
    • The Journal of the Korea Contents Association
    • /
    • v.13 no.11
    • /
    • pp.382-395
    • /
    • 2013
  • The providers of meteorological information want to know the level of satisfaction of forecast users with their services. To provide better service, meteorological communities of each nation are administering a survey on satisfaction of forecast users. However, most researchers provided these users with simple questionnaires and the respondents had to choose one answer among different satisfaction levels. So, the results of this kind of survey have low explanation power and are difficult to use in developing strategy of forecast service. In this study, instead of cost-loss concept, we applied satisfaction-dissatisfaction concept to the $2{\times}2$ contingency table, which is a useful tool to evaluate value of forecast, and estimated satisfaction value of 24h precipitation forecasts in Shanghai, China and Seoul, Korea. Moreover, not only the individual satisfaction value of forecast but the user group's satisfaction value was evaluated. As for the result, it is effective to enhance forecast accuracy to improve the satisfaction value of deterministic forecast user group, but in the case of probabilistic forecast, it is important to know the level of dissatisfaction of user group and distribution of probability threshold of forecast users. These results can help meteorological communities to search for a solution which can provide better satisfaction value to forecast users.

A New Metric for Evaluation of Forecasting Methods : Weighted Absolute and Cumulative Forecast Error (수요 예측 평가를 위한 가중절대누적오차지표의 개발)

  • Choi, Dea-Il;Ok, Chang-Soo
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.38 no.3
    • /
    • pp.159-168
    • /
    • 2015
  • Aggregate Production Planning determines levels of production, human resources, inventory to maximize company's profits and fulfill customer's demands based on demand forecasts. Since performance of aggregate production planning heavily depends on accuracy of given forecasting demands, choosing an accurate forecasting method should be antecedent for achieving a good aggregate production planning. Generally, typical forecasting error metrics such as MSE (Mean Squared Error), MAD (Mean Absolute Deviation), MAPE (Mean Absolute Percentage Error), and CFE (Cumulated Forecast Error) are utilized to choose a proper forecasting method for an aggregate production planning. However, these metrics are designed only to measure a difference between real and forecast demands and they are not able to consider any results such as increasing cost or decreasing profit caused by forecasting error. Consequently, the traditional metrics fail to give enough explanation to select a good forecasting method in aggregate production planning. To overcome this limitation of typical metrics for forecasting method this study suggests a new metric, WACFE (Weighted Absolute and Cumulative Forecast Error), to evaluate forecasting methods. Basically, the WACFE is designed to consider not only forecasting errors but also costs which the errors might cause in for Aggregate Production Planning. The WACFE is a product sum of cumulative forecasting error and weight factors for backorder and inventory costs. We demonstrate the effectiveness of the proposed metric by conducting intensive experiments with demand data sets from M3-competition. Finally, we showed that the WACFE provides a higher correlation with the total cost than other metrics and, consequently, is a better performance in selection of forecasting methods for aggregate production planning.

A Study on Neural Networks Forecast Model of Deep Excavation Wall Movements (인공신경망 기법을 활용한 굴착공사 흙막이 변위량 예측에 관한 연구)

  • Shin, Han-Woo;Kim, Gwang-Hee;Kim, Young-Seok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.7 no.3
    • /
    • pp.131-137
    • /
    • 2007
  • To predict deep excavation wall movements is important in the urban areas considering the cost and the safety in construction. Failing to estimate deep excavation wall movements in advance causes too many problems in the projects. The purpose of this study is to propose the forecast model of deep excavation wall movements using artificial neural networks. The data of the Deep Excavation Wall Movements which were done form Long research is used of Artificial neural networks training and apply the real construction work measured data to the Artificial neural networks model. Applying the artificial neural networks to forecast the deep excavation wall movements can significantly contribute to identifying and preventing the accident in the overall construction work.

Development of a Cash Flow Forecasting Model for Housing Construction (공동주택 공사의 현금흐름 예측 모델 개발에 관한 연구)

  • Jang, Joo-Hwan;Kim, Ju-Hyung;Jee, Nam-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.3
    • /
    • pp.257-265
    • /
    • 2012
  • Many construction companies are simultaneously carrying out numerous projects in the housing construction industry. It is essential to accurately forecast the cash flow of a project through optimal process management and resource input in order to manage funds rationally and enhance the competitiveness of a company. Current cash flow forecasting methods offer lower accuracy due to a large gap between the revenue and expenditure element. Expenditure elements depends on the real-time changing actual cost for work performed. This research survey was conducted on the actual state of construction management of K company to investigate the problems of cash flow forecasting. To achieve this, the work process and construction management system were integrated to improve the cost management system of K company. To accurately forecast the cash flow of a project, revenue and expenditure elements were displayed in the total cash flow forecast window. This research is expected to assist in the implementation of a system of cash flow forecasting on housing construction by excluding negative elements of revenue and expenditure.

Demand Forecast of Spare Parts for Low Consumption with Unclear Pattern (적은 소모량과 불분명한 소모패턴을 가진 수리부속의 수요예측)

  • Park, Min-Kyu;Baek, Jun-Geol
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.21 no.4
    • /
    • pp.529-540
    • /
    • 2018
  • As the equipment of the military has recently become more sophisticated and expensive, the cost of purchasing spare parts is also steadily increasing. Therefore, demand forecast accuracy is also becoming an issue for the effective execution of the spare parts budget. This study predicts the demand by using the data of spare parts consumption of the KF-16C fighter which is being operated in the Republic of Korea Air Force. In this paper, SARIMA(Seasonal Autoregressive Integrated Moving Average) is applied to seasonal data after dividing the spare parts consumptions into seasonal data and non-seasonal data. Proposing new methods, Majority Voting and Hybrid Method, to the non-seasonal data which consists of spare parts of low consumption with unclear pattern, We want to prove that the demand forecast accuracy of spare parts improves.

A Study on an Automatical BKLS Measurement By Programming Technology

  • Shin, YeounOuk;Kim, KiBum
    • International journal of advanced smart convergence
    • /
    • v.7 no.3
    • /
    • pp.73-78
    • /
    • 2018
  • This study focuses on presenting the IT program module provided by BKLS measure in order to solve the problem of capital cost due to information asymmetry of external investors and corporate executives. Barron at al(1998) set up a BKLS measure to guide the market by intermediate analysts. The BKLS measure was measured by using the changes in the analyst forecast dispersion and analyst mean forecast error squared. This study suggests a model of the algorithm that the BKLS measure can be provided to all investors immediately by IT program in order to deliver the meaningful value in the domestic capital market as measured. This is a method of generating and analyzing real-time or non-real-time prediction models by transferring the predicted estimates delivered to the Big Data Log Analysis System through the statistical DB to the statistical forecasting engine. Because BKLS measure is not carried out in a concrete method, it is practically very difficult to estimate the BKLS measure. It is expected that the BKLS measure of Barron at al(1998) introduced in this study and the model of IT module provided in real time will be the starting point for the follow-up study for the introduction and realization of IT technology in the future.

Forecast of Repair and Maintenance Costs for Public Rental Housing (공공임대주택의 유지관리를 위한 수선유지비용 예측)

  • Lee, Hak-Ju;Kim, Sunghee;Kim, Do-Hyung;Cho, Hunhee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.6
    • /
    • pp.621-631
    • /
    • 2018
  • The repair and maintenance cost of domestic public rental housing is an issue of considerable interest and growing financial concern. This paper suggests a quantity-based model as an alternative method for predicting costs, instead of the conventional model which is based on actual cost data. Furthermore, this paper provides a forecast of the repair costs incurred each year during the multi family house's maintenance phase (40 years). The recently changed the long-term repair plan and quality-improved interior materials were considered into the research. In order to estimate the cost of maintenance work, 5 sample apartments were selected and analyzed. The repair and maintenance cost from the case studies was converted to cost per household and per floor area for general use. On the other hand, the net present value method was applied to reflect the effect of time. We expect that the results will help to establish expenditure plans that are more effective for public rental housing in the maintenance stage.

Forecasting Project Cost and Time using Fuzzy Set Theory and Contractors' Judgment

  • Alshibani, Adel
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.174-178
    • /
    • 2015
  • This paper presents a new method for forecasting construction project cost and time at completion or at any intermediate time horizon of the project duration. The method is designed to overcome identified limitations of current applications of earned value method in forecasting project cost and time. The proposed method usesfuzzy set theory to model uncertainties associated with project performance and it integrates the earned value technique and the contractors' judgement. The fuzzy set theory is applied as an alternative approach to deterministic and probabilistic methods. Using fuzzy set theory allows contractors to: (1) perform risk analysis for different scenarios of project performance indices, and (2) perform different scenarios expressing vagueness and imprecision of forecasted project cost and time using a set of measures and indices. Unlike the current applications of Earned Value Method(EVM), The proposed method has a numberof interesting features: (1) integrating contractors' judgement in forecasting project performance; (2) enabling contractors to evaluate the risk associated with cost overrun in much simpler method comparing with that of simulation, and (3) accounting for uncertainties involved in the forecasting project cost.

  • PDF