• 제목/요약/키워드: cost estimating

검색결과 920건 처리시간 0.029초

공사비 예측시 이상값 존재하에서 데이터 처리 분석 방안 (Methodology of data analyses under presence of outliers for estimating construction cost)

  • 오세대;허영기
    • KIEAE Journal
    • /
    • 제7권3호
    • /
    • pp.31-37
    • /
    • 2007
  • Statistical analyses with actual data are used in estimating construction cost for many years, but collected data could include factors that distort analytical results, namely outliers. To enhance reliability in predicting construction cost, the methodology, which is able to identify outliers and determine how to manage them, is needed. Actual costs obtained from 22 construction projects were studied. It is found that there is substantial disparity between results considering outliers and results not considering ones. Therefore, it is to identify outliers and apply an optimum process in estimating construction cost when actual data is used in statistical analysis.

AHP & 모수추정법을 이용한 차기 다련장로켓의 비용대 효과분석 (A Study on the Analysis of the Cost-Effectiveness for the New Generation Multiple Launcher Rocket System Using AHP & Parametric Estimating)

  • 조기홍
    • 한국군사과학기술학회지
    • /
    • 제13권1호
    • /
    • pp.84-90
    • /
    • 2010
  • Korean army currently considers the development of the new generation MLRS(Multiple Launcher Rocket System) as a new alternative, which responses on the renovation of the artillery and future battlefield environment. This study suggests that it presents cost-effectiveness of MLRS based on the Analytic Hierarchy Process and Parametric Estimating(PRICE H). According to this study, the cost-effectiveness of new generation MLRS presented that alternative A is 2.30 times and alternative B is 1.70 times, which are better than currently operating M270A1. Therefore, The best acquisition is alternative A that launcher is carried on currently operating 10ton standard truck but final acquisition alternative should be politically decided to consider viability of operator, performance and the latest of equipment.

BIM기반 Life Cycle Cost 산정을 위한 프로세스에 관한 연구 (A Study on the Estimating Process for Life Cycle Cost based on BIM)

  • 이현주;문준호;박규태;김태희;김광희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 1부
    • /
    • pp.149-151
    • /
    • 2011
  • Recently, Architectural Design based on Building Information Modeling(BIM) is popular, construction management based on BIM is necessary. such as Quantity take off, scheduling, and Life Cycle Cost Estimating etc. Therefore, in the study, LCC Estimating using BIM Data, which is extracted from architectural designing process is proposed.

  • PDF

AN APPROXIMATE COST ESTIMATING MODEL FOR CONSTRUCTION PROJECTS

  • Daehee Lim;Seung-hoon Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1242-1247
    • /
    • 2009
  • The sudden changes in the construction market and the progressively intensifying price wars have amplified the importance of the construction cost estimation in the initial and planning phases of construction projects. However the methodologies and process of estimating construction cost in the planning and design phase are not standardized in the domestic market, in contrast to the markets of more developed countries. Therefore this paper proposes a new approximate estimation model to be used from the initial stages of construction projects. This methodology that extracts, modifies and synthesizes comparable elements of previous cases. This will introduce the foundation for the implementation of systems with improved usability and applicability.

  • PDF

2D 도면 인식을 통한 부재 물량 산출 자동화 기술 개발 (Development of Automation Technology for Structural Members Quantity Calculation through 2D Drawing Recognition)

  • 선우효빈;최고훈;허석재
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 봄 학술논문 발표대회
    • /
    • pp.227-228
    • /
    • 2022
  • In order to achieve the goal of cost management, which is one of the three major management goals of building production, this paper introduces an approximate cost estimating automation technology in the design stage as the importance of predicting construction costs increases. BIM is used for accurate estimating, and the quantity of structural members and finishing materials is calculated by creating a 3D model of the actual building. However, only 2D basic design drawings are provided when making an estimating. Therefore, for accurate quantity calculation, digitization of 2D drawings is required. Therefore, this research calculates the quantity of concrete structural members by calculating the area for the recognition area through 2D drawing recognition technology incorporating computer vision. It is judged that the development technology of this research can be used as an important decision-making tool when predicting the construction cost in the design stage. In addition, it is expected that 3D modeling automation and 3D structural analysis will be possible through the digitization of 2D drawings.

  • PDF

무보수 가사노동의 국민경제에 대한 기여도 평가 (A Contribution to the National Economy System of Unpaid Household Labor)

  • 문숙재;윤소영;김은희
    • 대한가정학회지
    • /
    • 제40권10호
    • /
    • pp.161-176
    • /
    • 2002
  • This study is a basic research for the estimation of the value of unpaid household labor within the national economy system to be reflected in the related policy-making. By measuring economic value of unpaid household labor and estimating the ration to GDP, this study attempted to confirm the productivity of the unpaid household labor and thus contribute to the improvement of socio-economic status of women. Especially, it focused on the development of a standard of estimating unpaid household labor as a method applicable to the present economic and legal system. To organize the method of economic valuation of unpaid household labor and calculate the ration to GDP, this study used three approaches: replacement cost method individual function, replacement cost method generalist and opportunity cost method. Although the estimated result revealed that the economic value of unpaid household labor showed a great extent of deviation according to the estimating methods and the wage rate, total value of household labor ranged from one hundred and thirty eight to two hundred and thirty trillion wens, about 28-48% of GDP in Korea.

A Cost Estimation Model for Highway Projects in Korea

  • Kim, Soo-Yong;Kim, Young-Mok;Luu, Truong-Van
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.922-925
    • /
    • 2008
  • Many highway projects are under way in Korea. However, owners frequently find that the project cost exceeds the budget and they are unable to identify the underlining reasons. The main purpose of this research is to develop cost models for transportation projects in Korea using the multiple linear regression (MLR). The data consist of 27 completed transportation projects, built from 1991 to 2001, The technique of multiple regression analysis is used to develop the parametric cost estimating model for total budget cost per highway square meter (TBC/$m^2$). Findings of the study indicated that MLR car be applied to highway projects in Korea. There are twf) major contributions of this research. (1) the identification of transportation parameters as a significant cost driver for transportation costs and (2) the successful development of the parametric cost estimating models for transportation projects in Korea.

  • PDF

E-러닝시스템 구축 프로젝트의 적정 하드웨어 산정방법론 연구 (A Methodology for Estimating Optimum Hardware Capacity E-learning System Development)

  • 정지영;백동현
    • 산업경영시스템학회지
    • /
    • 제34권3호
    • /
    • pp.49-56
    • /
    • 2011
  • Estimating optimum hardware capacity of an e-learning system is very important process to grasp reasonable size of designing technique architecture and budget during step of ISP(information strategic planning) and development. It hugely influences cost and quality of the whole project. While investment on information system hardware has been continuously increased, there was no certified hardware capacity estimating method in e-learning system development. A guideline for hardware sizing of information systems was established by Telecommunication Technology Association in 2008. However, the guideline is not appropriate for estimating optimum hardware capacity of an e-learning system because it was designed to provide general standards for estimating hardware capacity of various types of projects. The purpose of this paper is to provide a methodology for estimating optimum hardware capacity in e-learning system development. To develop the methodology, this study, first of all, analyzes two e-learning development projects, in which the guideline was applied to estimate optimum hardware capacity. Then, this study finds out several key factors influencing on hardware capacity. Finally, this study suggests a methodology for estimating optimum hardware capacity of an e-learning system, in which weights for the factors are determined through AHP analysis.

적외선 검출기 개발가능성 및 대안분석 연구 (A Study on Feasibility Analysis and Alternatives for Infrared Detector Development)

  • 민성기;김철환;김경수
    • 시스템엔지니어링학술지
    • /
    • 제1권1호
    • /
    • pp.1-13
    • /
    • 2005
  • The purpose of this paper analyze development feasibility and alternatives for infrared detector development in both technology and cost. Infrared Detector is core component of Thermal Imaging System and developed by ADD from 2006 10 2008 year. We got raw input data from development and technical expert, and then analyze cost and technology for development feasibility, and alternatives study. Technology level is analyzed by TRL(Technology Readiness Level) and AOA(Analysis of Alternatives) is done by development cost estimate. Estimating the development cost, we use SEER-H that is parametric cost estimating tool based on Knowledge Base. This study can help those who are related to the cost and development feasibility analysis of other weapon systems.

  • PDF

프로토타입기반 기본설계단계 건축마감공사비 산정 모델 (Prototype-based Cost Estimating Model for Building Interior Construction in Design Development Stage)

  • 김해곤;박성철;홍태훈;현창택;구교진
    • 한국건설관리학회논문집
    • /
    • 제8권4호
    • /
    • pp.110-118
    • /
    • 2007
  • 건축 프로젝트의 초기 기획조사단계에서 발주자의 예산결정을 위하여 사업비에 대한 통계적 추정방법 연구는 다수 이루어졌으나, 파라미터기반 개략견적 방법은 설계진행 중의 설계자 의사결정과 이로 인한 공사비 산정 및 관리업무와의 연계가 이루어지지 않아 설계실무에 활용하기에는 제약이 있다. 한편 실시설계안이 도출된 후 상세견적에 의해 산정된 공사비가 예산을 초과한 경우, 마감수준 등을 국부적으로 임의 조정하여 설계를 확정하고 있다. 본 연구에서는 사무소 건축물을 대상으로 계획설계 및 기본설계단계에서 설계자의 의사결정 프로세스와 연계하여 마감공사비를 용이하게 산정하고, 설계대안의 평가를 지원할 수 있는 프로토타입기반 마감공사비 산정 모델을 개발하였다. 제시된 모델은 건축물을 설계프로세스에 따라 부위별 분류체계에 의해 분할하고, 상세견적 된 기존 사무소 건물의 프로토타입이 축적된 데이터베이스로부터 각 실별 부위선정을 통한 설계대안을 생성하고 그 공사비를 견적하게 한다. 제시된 프로토타입기반의 모델에 대하여 설계와 시공정보를 통합하는 연결체로서의 유효성과 실무설계에서의 적용성을 확인하기 위해 사례검증을 실시하였다.