Empirical Analysis of Man-hour Data to Support a Cost-Plus Pricing Approach for Estimating BIM Service Costs

  • Koo, Bonsang;Lee, Ghang;Kim, Chung-woon;Shin, Byungjin
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.660-661
    • /
    • 2015
  • Building Information Modeling (BIM) is a nascent technology in Korea, and currently lacks formal guidelines to assist Architectural and Engineering (AE) firms in estimating BIM service fees, while also allowing government agencies to allocate budgets for the rendered BIM services. This research provides a method to estimate costs for BIM services based on the cost-plus pricing framework. The approach requires a generalized estimate of the man hour per floor area data to calculate the direct labor costs. Man-hour data were collected from forty five projects that have implemented BIM. Interpolation of the man-hours was performed to develop a general reference table for 'Type 2' (i.e., public schools and office buildings, etc.) projects. By providing an objective approach for estimating the costs of BIM services, it allows clients and AE firms to agree upon a fair cost for BIM related services, and thus expedite its adoption in Korea.

  • PDF

CM사 견적업무의 빅데이터 활용 현황에 관한 연구 (A Study on the Current Situations about the Use of Big Data for Cost Estimating Tasks in CM Companies)

  • 김현진;김한수
    • 한국건설관리학회논문집
    • /
    • 제22권6호
    • /
    • pp.24-33
    • /
    • 2021
  • 사업비관리는 발주자를 위한 CM사의 주요 업무이며, 견적은 사업비관리를 위한 비용의 기준점을 설정하고 의사결정의 기초를 마련해주는 중요한 업무이다. 이를 위해 CM사는 양질의 데이터를 확보 및 활용하여 견적을 더욱 정확하고 효율적으로 수행하는 것이 필요하다. 건설산업에서 빅데이터 활용의 중요성이 증가함에 따라 관련 연구 또한 활발하게 이루어지고 있지만, CM사 견적업무를 위한 빅데이터 활용 현황을 진단한 관련 연구는 아직 미흡한 것으로 나타나고 있다. 본 연구의 목적은 CM사 견적업무의 빅데이터 활용 현황에 대한 진단을 통해 주요 특징과 시사점을 도출하는 데 있으며, 이는 견적업무를 위한 CM사의 빅데이터 활용 전략 수립에 유용하게 참고될 수 있다.

원전 건설공사 실적공사비 단가 제도 도입을 위한 연구 (A study on application method of "Result unit cost" to Nuclear Power Plant (NPP) construction cost estimating)

  • 박원섭;장경수
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.46-47
    • /
    • 2014
  • Recently, BAI(Board of Audit and Inspection of Korea) has recommended that "Result unit cost" of Korean government apply to national power plant construction project when plant owner corporations estimate budget price for tender. but nuclear industry have difficulties with this suggestion. the purpose of this study is to review the "Result unit cost" and problem with application of NPP construction cost estimating. And proposed the direction of application of "Result unit cost" to NPP construction cost estimating.

  • PDF

The Development of Probabilistic Time and Cost Data: Focus on field conditions and labor productivity

  • Hyun, Chang-Taek;Hong, Tae-Hoon;Ji, Soung-Min;Yu, Jun-Hyeok;An, Soo-Bae
    • Journal of Construction Engineering and Project Management
    • /
    • 제1권1호
    • /
    • pp.37-43
    • /
    • 2011
  • Labor productivity is a significant factor associated with controlling time, cost, and quality. Many researchers have developed models to define methods of measuring the relationship between productivity and various parameters such as the size of working area, maximum working hours, and the crew composition. Most of the previous research has focused on estimating productivity; however, this research concentrates on estimating labor productivity and developing time and cost data for repetitive concrete pouring activity. In Korea, "Standard Estimating" only entails the average productivity data of the construction industry, and it is difficult to predict the time and cost spent on any particular project. As a result, errors occur in estimating duration and cost for individual activities or projects. To address these issues, this research sought to collect data, measure productivity, and develop time and cost data using labor productivity based on field conditions from the collected data. A probabilistic approach is also proposed to develop data. A case study is performed to validate this process using actual data collected from construction sites. It is possible that the result will be used as the EVMS baseline of cost management and schedule management.

PROBABILISTIC MODEL-BASED APPROACH FOR TIME AND COST DATA : REGARDING FIELD CONDITIONS AND LABOR PRODUCTIVITY

  • ChangTaek Hyun;TaeHoon Hong;SoungMin Ji;JunHyeok Yu;SooBae An
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.256-261
    • /
    • 2011
  • Labor productivity is a significant factor related to control time, cost, and quality. Many researchers have developed models to define method of measuring the relationship between productivity and various constraints such as the size of working area, maximum working hours, and the crew composition. Most of the previous research has focused on estimating productivity; however, this research concentrates on estimating labor productivity and developing time and cost data for repetitive concrete pouring activity. In Korea, "Standard Estimating" only contains the average productivity data of the construction industry, and it is difficult to predict the time and cost of any particular project; hence, there are some errors in estimating duration and cost for individual activity and project. To address these issues, this research collects data, measures productivity, and develops time and cost data using labor productivity based on field conditions from the collected data. A probabilistic approach is also proposed to develop data. A case study is performed to validate this process using actual data collected from construction sites and it is possible that the result will be used as the EVMS baseline of cost management and schedule management.

  • PDF

종합건설사 실행예산 편성 시 리스크 비용 산정에 관한 인식 및 실태에 관한 연구 - 건축공사를 중심으로 - (A Study on the Perceptions and Current Practices in Estimating Risk Cost of Contractor's Construction Budget - Focused on Building Projects -)

  • 최정원;김한수
    • 한국건설관리학회논문집
    • /
    • 제23권3호
    • /
    • pp.13-24
    • /
    • 2022
  • 건설공사는 다양한 리스크에 노출되어 있으며, 건설공사의 리스크는 더욱 증가하는 경향을 보이고 있다. 건설공사의 리스크 증가는 건설사의 리스크 예측 및 대응의 중요성을 더욱 증가시키고 있다. 건설사가 건설공사의 리스크를 대응하는 방법 중 하나는 리스크 비용을 사전에 예측 또는 산정하여 이를 실행예산에 반영하는 것이다. 리스크 비용과 관련하여 다양한 연구들이 수행되어 왔지만, 국내 건설사의 실행예산 편성 시 리스크 비용 산정에 관한 인식과 실태에 관한 분석은 미흡한 것으로 나타났다. 본 연구의 목적은 종합건설사의 실행예산 편성 시 리스크 비용 산정과 관련된 인식과 실태를 조사·분석하여 주요 특징 및 시사점을 도출하는데 있다. 본 연구의 주요 결과를 요약하면 실행예산 편성 시 리스크 비용 반영의 중요성에 대한 인식은 상당히 높았으나, 상대적으로 리스크 비용을 산정하는 수준은 상대적으로 미흡한 것으로 나타났다. 리스크 비용 산정을 효과적으로 수행하기 위해서는 실적 데이터, 가이드라인, 전사적 표준절차 등 실무기반이 구축되어야 하며, 충분한 견적기간도 할애될 필요가 있었다. 또한 리스크 비용 산정을 위해 빅데이터 분석기법을 포함한 정교한 분석기법의 활용에 대한 관심은 높지만 현재 준비 및 활용 수준은 낮은 것으로 나타나 이에 대한 실무 적용성을 높이기 위한 연구개발이 필요하다고 할 수 있다.

수로터널공사의 효율성 분석을 통한 굴진속도 및 직접공사비 분석 - 구경 5.0m 중심으로 (Analysis of Excavation Speed and Direct Construction Cost Based on the Operating Productivities of TBM Method Site - Diameter 5.0m Target)

  • 박홍태;이양규
    • 한국재난정보학회 논문집
    • /
    • 제8권4호
    • /
    • pp.328-335
    • /
    • 2012
  • 건설공사의 표준품셈에 의한 자원기반 적산방식은 정부고시 노임단가와 기자재의 공시가 격에 표준적이고 보편적인 공법 및 공종에 대한 단위작업당 재료량, 노무량, 장비사용시간 등을 수치로 표시한 품을 곱하여 견적하였다. 그러나 자원기반 적산방식은 실제 거래가격을 적절히 반영하지 못하는 한계점이 발생하였다. 따라서 본 연구는 이러한 한계점을 극복하기 위하여 새로운 시도로 수로터널 현장을 대상으로 Cutter 점검/교환, TBM 정비, TBM 점검/급유, 후속설비, 광차, 운영교대, 갱내보강/낙반보강, 안전/회의의 작업 공종 별로 TBM 굴진 생산성을 분석하고, 이를 근거로 순굴진속도를 분석하여 실적 공사비를 분석하였다. 본 연구에서 제시하는 실적공사비 산정 접근법은 TBM 수로터널 현장에서 실적 공사비를 예측하는데 유용한 도구로 활용할 수 있을 것으로 확신한다.

공사규모에 따른 공공건축물 공사비의 산정방법 (Cost Estimating Method of Public Building Construction through Construction Scale)

  • 임진호;박준모;김옥규
    • 한국건축시공학회지
    • /
    • 제15권3호
    • /
    • pp.307-316
    • /
    • 2015
  • 공공건축물공사의 실적공사비제도에서 공사규모에 대한 건축공사비 차이가 크게 나타나므로, 산정방식에서 많은 문제점으로 제기된다. 이에 공사규모에 따라서 선별적, 차등적으로 적용할 예측모형의 개발이 필요하다. 이에 본 연구는 조달청에서 2011~2012년에 발주한 이미 준공된 42개 현장의 실적자료에서 공사규모 $5,000m^2{\sim}20,000m^2$으로 선정하여, 회귀분석을 통해서 추정된 모형을 도출하였다. 이를 근거로 신규공사에 적용하여 검증함으로써 합리적인 건축공사비 예측모형을 제시하였다.

객체지향 캐드시스템을 활용한 견적관리 시스템 연구 (A study on Cost~Estimating System based on Object- oriented Cad System)

  • 송춘동
    • 한국디지털건축인테리어학회논문집
    • /
    • 제1권1호
    • /
    • pp.46-50
    • /
    • 2001
  • It is known that to automate the quantity take-off process enables you to increase the productivity best among the construction business field. However, the limitation of 2D(Two-dimension) CAD System prevented a cost-estimating system which makes the great effects on the quantity take-off process from being developed. This study aims that you can automate both the itemized statements and the quantity take-off process by using commercially available object-oriented CAD system. The commercially available CAD system today does not give us entire satisfaction. This study shows the deduction of the old boundaries of the object-oriented CAD system and the solution of those problems. And it also studied about the quantity take-off process and the automated cost-estimating system that can be used in the simple and plain repair-maintenance work such as the execution drawing which doesn't need the complicated drawings.

  • PDF

디자인 마케팅을 위한 인테리어 공사비 초기 예측기법- 일원공간의 인테리어 프로젝트를 중심으로 - (Interior Cost Estimating as a Design Marketing Tool - for Executive Office Interior)

  • 이혜연
    • 한국실내디자인학회논문집
    • /
    • 제23호
    • /
    • pp.68-73
    • /
    • 2000
  • The purpose of this research is to develop interior construction cost-estimating system at the early stage of the project. Though general construction estimates are typically in quantitative, interior construction should be in rather qualitative. Therefore, design-concerned cost-estimating methods should be developed to manage interior projects from the early statge. 30 estimates of VIP-Zone interior projects, were examined to develop the general type of composition and material classification. The cost has been classified by construction parts such as wall, ceiling, floor, and doors & windows and their treatments. The composition and material related estimating system (CMRES) was consisted of the unit average costs of classification and the variation coefficients. The CMRESS was verified by the case study, and the results sowed that the difference between the actual estimate and the CMRES was competitively confident.

  • PDF