• Title/Summary/Keyword: cost Index

Search Result 1,213, Processing Time 0.026 seconds

Life cycle cost analysis and smart operation mode of ground source heat pump system

  • Yoon, Seok;Lee, Seung-Rae
    • Smart Structures and Systems
    • /
    • v.16 no.4
    • /
    • pp.743-758
    • /
    • 2015
  • This paper presents an advanced life cycle cost (LCC) analysis of a ground source heat pump (GSHP) system and suggests a smart operation mode with a thermal performance test (TPT) and an energy pile system constructed on the site of the Incheon International Airport (IIA). First, an economic analysis of the GSHP system was conducted for the second passenger terminal of the IIA considering actual influencing factors such as government support and the residual value of the equipment. The analysis results showed that the economic efficiency of the GSHP system could be increased owing to several influential factors. Second, a multiple regression analysis was conducted using different independent variables in order to analyze the influence indices with regard to the LCC results. Every independent index, in this case the initial construction cost, lifespan of the equipment, discount rate and the amount of price inflation can affect the LCC results. Third, a GSHP system using an energy pile was installed on the site of the construction laboratory institute of the IIA. TPTs of W-shape and spiral-coil-type GHEs were conducted in continuous and intermittent operation modes, respectively, prior to system operation of the energy pile. A cooling GSHP system in the energy pile was operated in both the continuous and intermittent modes, and the LCC was calculated. Furthermore, the smart operation mode and LCC were analyzed considering the application of a thermal storage tank.

Security Cost Analysis with Linear Ramp Model using Contingency Constrained Optimal Power Flow

  • Lyu, Jae-kun;Kim, Mun-Kyeom;Park, Jong-Keun
    • Journal of Electrical Engineering and Technology
    • /
    • v.4 no.3
    • /
    • pp.353-359
    • /
    • 2009
  • This paper proposes a novel technique for calculating the security costs that properly includes ramping constraints in the operation of a deregulated power system. The ramping process is modeled by a piecewise linear function with certain assumptions. During this process, a ramping cost is incurred if the permissible limits are exceeded. The optimal production costs of the power producers are calculated with the ramping cost included, considering a time horizon with N-1 contingency cases using contingency constrained optimal power flow (CCOPF), which is solved by the primal-dual interior point method (PDIPM). A contingency analysis is also performed taking into account the severity index of transmission line outages and its sensitivity analysis. The results from an illustrative case study based on the IEEE 30-bus system are analyzed. One attractive feature of the proposed approach is that an optimal solution is more realistic than the conventional approach because it satisfies physical constraints, such as the ramping constraint.

A Study on Improvement of Health Center's Function through Cost-Effectiveness Analysis in Korea (1차 보건의료사업의 비용-효과분석을 통한 보건소 기능의 확대 방안 연구)

  • 김종인;윤치근
    • Health Policy and Management
    • /
    • v.5 no.2
    • /
    • pp.70-103
    • /
    • 1995
  • The aim of this study sets out to discover a desirable form of public centers among the alternative ones and make a health center model. Especially, this study attempts; (i) to investigate factors that affect the performance of health centers; (ii) carry out cost-effectiveness analysis (CEA) for the various type of health centers; (iii) identify innovative strategies to increase the use of health center. Cost-effectiveness analysis is used to compare the performance of all the centers. The following is taken to create the index. Wi = Ti x Mi x Eij (Wi: weight for service item I, Ti : time spent for service I, Mi ; number of health personnel involved in service I, Eij : years of schooling for personnel j in providing service I). As a result of these analyses, policy options as follows are recommended; (i) proper manpower, especially public health physician (oriental medical doctor), should be enough to provide health care adequately; (ii) facilities ad equipments in the health center should be provided sufficiently. (iii) the utilization of health centers should be raised by active operation of mobil service, community participation and health education program. Ultimately health centers in public sector are to be fostered for the promotion of health care by enhancing the financial and quality, continuity and efficiency of health services.

  • PDF

Economic Assesment for Track Ballast Structures based on Proper Maintenance Level (적정 유지관리수준에 기초한 궤도도상구조에 대한 경제성 검토)

  • Baek, Jae-Wook;Joo, Hwan-Joong;Song, Yoo-Seob;Park, Tae-Hyo
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.2 s.39
    • /
    • pp.167-178
    • /
    • 2007
  • In general, it is known that the concrete ballast track is possible to reduce a cost of maintenance activities cause of maintenance free by restrictive maintenance in application of track ballast structures. However, if deteriorations and fracture mechanism of a material are considered, proper maintenance activities and repairing are continually required. For the problems, we evaluated an economical efficiency of the gravel ballast and the concrete ballast on a proper level of maintenance activities. As the method based on history path is difficult to obtain sufficient reliabilities cause of an absence of real data for maintenance activities, we chose the delphi survey method by professional group, and we obtained the appropriate index and profiles for maintenance activities. As a result, we founded that effects for cost reduction can be expected by preventive maintenance management, and we proposed economical restrictions and life cycle cost for track ballast structures in a life cycle.

Energy Saving Design Method with the Consideration of the Initial Cost for Apartment Houses (저에너지 공동주택 구현을 위한 요소기술 선정 기법에 관한 연구)

  • Son, Won-Tug;Lee, Jong-Il;Yoon, Dae-Won;Lee, Keon-Ho;Song, Doosam
    • Journal of the Korean Solar Energy Society
    • /
    • v.34 no.2
    • /
    • pp.24-31
    • /
    • 2014
  • So many energy saving strategies to realize the low energy house are proposed in these days. Even if the energy saving performances are similar between the strategies, the costs are in abroad ranges. Therefore, the application of the energy saving strategies should be based upon two considerations; one is energy saving performance and the other is the cost. In this study, the decision making method for application of the passive design technologies in the design stage of the low energy apartment house are suggested. By utilizing the result of this study, practitioners can make an effective design alternatives which solve the conflicted values; energy saving and cost.

A Study on Characteristics of Damageability and Repairability with Similar Platform Type at Low Speed 40% Offset Crash Test (동일 플렛폼 차량에 대한 저속 충돌시 손상성 수리성에 미치는 영향에 관한 연구)

  • Lim, Jong-Hun;Park, In-Song;Heo, Seung-Jin
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.13 no.2
    • /
    • pp.108-113
    • /
    • 2005
  • The damageability and repairability of similar platform type vehicles could be very concerned with design optimization. In all the vehicles crash tested, small size passenger vehicles were weakness in aspect of damageability and repairability. The most critical area appears to be repair cost considering that parts cost is the largest portion of total repair cost segments. Besides repair cost, attaching method of front sidemember and subframe are placed special importance for impact energy absorption and damageability and repairability. So in order to improve damageability and repairability of vehicle structure and body component of the monocoque type passenger vehicles, the end of front side member and front back beam should be designed with optimum level and to supply the end of front side member as a partial condition approx 300mm. The effectiveness of design concept on the 40% offset frontal impact characteristics of the passenger vehicle structure is investigated and summarized.

A Canonical Correlation Analysis of the Relationship between Menu Management Variables and Performance in Contract-Foodservice Operations (위탁 급식 점포의 메뉴 운영 요인과 성과의 연관성에 관한 연구)

  • Park, Ju-Yeon;Kim, Tae-Hee
    • Journal of the East Asian Society of Dietary Life
    • /
    • v.18 no.6
    • /
    • pp.1089-1098
    • /
    • 2008
  • The principal objective of this study was to reveal the relationship between the menu management indicators and menu performance indicators in contract-foodservice operations. Menu indicators differed according to the type of business, type of contract, type of serving, and number of service lines. In accordance with the results of our correlation analysis, we noted significant correlations between menu performance indicators and menu management indicators. The first of these was the correlation between the food cost ration and meal counts, food loss, and the use of prepared vegetables. The second of these was the correlation between food cost per meal and forecasting error, food loss, and inventory turnover. The last of these correlations was the negative correlation between menu CSI(customer satisfaction index) and the use of prepared vegetables. According to the results of our canonical correlation analysis, 2 significant functions were identified. In the first function, we noted significant correlations between meal counts, use of prepared vegetables, food loss, and food cost ratio. Additionally, we noted significant correlations between forecasting error, inventory turnover, food loss, and food cost per meal in the second function. Menu management indicators had no influence on customer satisfaction.

  • PDF

Study on Project Management Method of Naval Ship Building in Monetary Fluctuations (금융환경 변동 하에서 실적가치 기법에 의한 함정건조사업 관리 방안 연구)

  • Kim, Hyung-Man;Seo, Guan-Hee;Kim, Soo-Young
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.42 no.5 s.143
    • /
    • pp.542-549
    • /
    • 2005
  • Naval ships are complex weapon systems which play the integrated performance by system integration of many kinds of weapon systems and their leading ships are usually not disposed after test and evaluation but militarised. Then, strict project management is required for naval ship building projects by identifying problems early and by taking prefer measures in time against unexpected situations encountered in the process of the projects. EVMS is a project management system which can manage the schedule and the budget of a project concurrently and estimate the project's time duration and the cost at project completion. In this paper, the applicability and usefulness of WMS is studied for a assumed navai ship building project, in the environment of monetary fluctuations such as price index, wage increase rate and exchange rate.

International Multimodal Transport Route Development from Korea to Mongolia

  • Nyamjav, Tsenskhuu;Ha, Min-Ho
    • Journal of Navigation and Port Research
    • /
    • v.46 no.5
    • /
    • pp.419-426
    • /
    • 2022
  • This study aimed to identify new routes for transporting automobiles from Korea to Mongolia by comparing them with the existing route. At present, a route from the Incheon Port through the Tianjin Port to Zamiin-Uud is commonly used to transport containerized cargo from Korea to Mongolia. This study examined five possible logistics routes from Korea to Mongolia using a time/cost-distance methodology based on real data. Through consecutive discussions with importers and freight forwarders in Mongolia, the potential routes were selected and costs, distance, and lead time were evaluated to provide additional route options for automobile logistics from Korea to Mongolia. The results indicated that each route could be ranked in terms of the total cost while the lead time for all options in the present COVID-19 period is 2 - 4 months, with no difference among the routes. In addition, although the confidence index of all routes was not impressive, route 3 was the most preferred option, followed by route 1. However, the study results cannot provide the answer to the question of "which route is more attractive for transporting automobiles from Korea to Mongolia." This limitation notwithstanding, this study provides real information on the critical factors of distance, cost, and lead time in terms of the selected transportation routes so that importers and exporters can compare the routes in terms of the priority of each factor in uncertain logistics environment.

Evaluation of a Solar Flare Forecast Model with Cost/Loss Ratio

  • Park, Jongyeob;Moon, Yong-Jae;Lee, Kangjin;Lee, Jaejin
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.40 no.1
    • /
    • pp.84.2-84.2
    • /
    • 2015
  • There are probabilistic forecast models for solar flare occurrence, which can be evaluated by various skill scores (e.g. accuracy, critical success index, heidek skill score, true skill score). Since these skill scores assume that two types of forecast errors (i.e. false alarm and miss) are equal or constant, which does not take into account different situations of users, they may be unrealistic. In this study, we make an evaluation of a probabilistic flare forecast model (Lee et al. 2012) which use sunspot groups and its area changes as a proxy of flux emergence. We calculate daily solar flare probabilities from 1996 to 2014 using this model. Overall frequencies are 61.08% (C), 22.83% (M), and 5.44% (X). The maximum probabilities computed by the model are 99.9% (C), 89.39% (M), and 25.45% (X), respectively. The skill scores are computed through contingency tables as a function of forecast probability, which corresponds to the maximum skill score depending on flare class and type of a skill score. For the critical success index widely used, the probability threshold values for contingency tables are 25% (C), 20% (M), and 4% (X). We use a value score with cost/loss ratio, relative importance between the two types of forecast errors. We find that the forecast model has an effective range of cost/loss ratio for each class flare: 0.15-0.83(C), 0.11-0.51(M), and 0.04-0.17(X), also depending on a lifetime of satellite. We expect that this study would provide a guideline to determine the probability threshold for space weather forecast.

  • PDF