• Title/Summary/Keyword: cost Index

Search Result 1,213, Processing Time 0.029 seconds

Development and Evaluation for Improvement of the Sound Insulation of Balcony Window in Apartment (차음성능 향상을 위한 발코니 창호의 개발 및 평가)

  • Kim, Ha-Geun;Kim, Myung-Jun;Oh, Jin-Kyun
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.15 no.5 s.98
    • /
    • pp.519-526
    • /
    • 2005
  • Recently, the interest on the comfortable dwelling environment is increasing and the effort to solve the problem of exterior noise was tried. The propose of this study is to suggest the design of balcony window in apartment and to evaluate the sound insulation of it. So, we designed five types of balcony window which were considered not only sound insulation but ventilation. The sound reduction index of window was evaluated by the measurement in mock-up room. The results showed that case 2 improved about 6 dB in the weighted apparent sound reduction index than case 1, and case 3 reduced about $39 \%$ in construction cost than case 4.

Optimal Measurement System Design by Using Band Matrix (밴드행열을 이용한 최적측정점선정에 관한 연구)

  • Song, Kyung-Bin;Choi, Sang-Bong;Moon, Toung-Hyun
    • Proceedings of the KIEE Conference
    • /
    • 1987.11a
    • /
    • pp.133-136
    • /
    • 1987
  • This paper presents a new algorithm of optimal measurement system by using band matrix characteristic respectively for state estimation. A performance index of measurement system is established to reflect relation among measurement sets, probability of measurement failure and cost of individual meter installation. Selection ranking in the candidates of measurement sets is composed to guarantee the observability for any any single meter outage. Performance index sensitivity is introduced and recursive formula which based on the matrix inversion lemma used for selection. The proposed algorithm is composed of successive addition algorithm, successive elimination algorithm and combinatorial algorithm. The band matrix characteristic could save in memory requirements and calculate the performance index faster than earlier.

  • PDF

An Architecture for Efficient RDF Data Management Using Structure Index with Relation-Based Data Partitioning Approach

  • Nguyen, Duc;Oh, Sang-yoon
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.5 no.1
    • /
    • pp.14-17
    • /
    • 2013
  • RDF data is widely used for exchanging data nowadays to enable semantic web era. This leads to the need for storing and retrieving these data efficiently and effectively. Recently, the structure index in graph-based perspective is considered as a promising approach to deal with issues of complex query graphs. However, even though there are many researches based on structure indexing, there can be a better architectural approach instead of addressing the issue as a part. In this research, we propose architecture for storing, query processing and retrieving RDF data in efficient manner using structure indexing. Our research utilizes research results from iStore and 2 relation-based approaches and we focus on improving query processing to reduce the time of loading data and I/O cost.

A Probabilistic Fuzzy Logic Approach to Identify Productivity Factors in Indian Construction Projects

  • Princy, J. Darwin;Shanmugapriya, S.
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.3
    • /
    • pp.39-55
    • /
    • 2017
  • Preeminent performance of construction industry are unattainable with poor productivity resulting in time and cost over runs. Enhancement in productivity cannot be achieved without identifying and analyzing factors that adversely affect productivity. The objective therefore is to propose a productivity analysis model to quantify the probability of effect of factors influencing productivity by using fuzzy logic incorporated with relative importance index method, for various types of construction projects. To achieve this objective, a questionnaire survey was carried out targeting respondents of Indian construction industry, from four distinct projects, namely, residential, commercial, infrastructure and industrial projects. Based on questionnaire administered, the relative importance and ranks of factors demonstrated using relative importance index method. Probability assessment model to analyze productivity was then developed by using Fuzzy Logic Toolbox of MATLAB. The applicability of the proposed model was tested in seven construction projects and the probability of impact of factors on productivity evaluated. The results of application of model in the construction firms infers that the most contributing factor groups for most of the projects were discerned to be manpower, motivation and time group.

Development and Evaluation for Improvement of the Sound Insulation of Balcony window in Apartment (차음성능 향상을 위한 발코니 창호의 개발 및 평가)

  • Oh, Jin-Kyun;Kim, Ha-Geun;Kim, Myung-Jun;Kim, Yun-Jae
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2004.11a
    • /
    • pp.445-450
    • /
    • 2004
  • Recently, the interest on the comfortable dwelling environment is increasing and the effort to solve the problem of exterior noise was tried. The propose of this study is to suggest the design of balcony window in apartment and to evaluate the sound insulation of it. So, we designed five types of balcony window which were considered not only sound insulation but ventilation. The sound reduction index of window was evaluated by the measurement in mock-up room. The results showed that case 2 improved about 6dB in the weighted apparent sound reduction index than case 1, and case 3 reduced about 39% in construction cost than case 4.

  • PDF

The Establishment of an Activity-Based EVM - PMIS Integration Model (액티비티 기반의 EVM - PMIS 통합모델 구축)

  • Na, Kwang-Tae;Kang, Byeung-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.199-212
    • /
    • 2010
  • To establish an infrastructure for technology and information in the domestic construction industry, several construction regulations pertaining to construction information have been institutionalized. However, there are major problems with the domestic information classification system, earned value management (EVM) and project management information system (PMIS). In particular, the functions of the current PMIS have consisted of a builder-oriented system, and as EVM is not applied to PMIS, the functions of reporting, analysis and forecast for owners are lacking. Moreover, owners cannot confirm information on construction schedule and cost in real time due to the differences between the EVM and PMIS operation systems. The purpose of this study is to provide a framework that is capable of operating PMIS efficiently under an e-business environment, by providing a proposal on how to establish a work breakdown structure (WBS) and an EVM - PMIS integration model, so that PMIS may provide the function of EVM, and stakeholders may have all information in common. At the core of EVM - PMIS integration is the idea that EVM and PMIS have the same operation system, in order to be an activity-based system. The principle of the integration is data integration, in which the information field of an activity is connected with the field of a relational database table consisting of sub-modules for the schedule and cost management function of PMIS using a relational database management system. Therefore, the planned value (PV), cost value (CV), actual cost (AC), schedule variance (SV), schedule performance index (SPI), cost variance (CV) and cost performance index (CPI) of an activity are connected with the field of the relational database table for the schedule and cost sub-modules of PMIS.

Clinical Outcomes and Cost-Effectiveness of Osteoporosis Screening With Dual-Energy X-ray Absorptiometry

  • Chiao-Lin Hsu;Pin-Chieh Wu;Chun-Hao Yin;Chung-Hwan Chen;King-Teh Lee;Chih-Lung Lin;Hon-Yi Shi
    • Korean Journal of Radiology
    • /
    • v.24 no.12
    • /
    • pp.1249-1259
    • /
    • 2023
  • Objective: This study aimed to evaluate the clinical outcomes and cost-effectiveness of dual-energy X-ray absorptiometry (DXA) for osteoporosis screening. Materials and Methods: Eligible patients who had and had not undergone DXA screening were identified from among those aged 50 years or older at Kaohsiung Veterans General Hospital, Taiwan. Age, sex, screening year (index year), and Charlson comorbidity index of the DXA and non-DXA groups were matched using inverse probability of treatment weighting (IPTW) for propensity score analysis. For cost-effectiveness analysis, a societal perspective, 1-year cycle length, 20-year time horizon, and discount rate of 2% per year for both effectiveness and costs were adopted in the incremental cost-effectiveness (ICER) model. Results: The outcome analysis included 10337 patients (female:male, 63.8%:36.2%) who were screened for osteoporosis in southern Taiwan between January 1, 2012, and December 31, 2021. The DXA group had significantly better outcomes than the non-DXA group in terms of fragility fractures (7.6% vs. 12.5%, P < 0.001) and mortality (0.6% vs. 4.3%, P < 0.001). The DXA screening strategy gained an ICER of US$ -2794 per quality-adjusted life year (QALY) relative to the non-DXA at the willingness-to-pay threshold of US$ 33004 (Taiwan's per capita gross domestic product). The ICER after stratifying by ages of 50-59, 60-69, 70-79, and ≥ 80 years were US$ -17815, US$ -26862, US$ -28981, and US$ -34816 per QALY, respectively. Conclusion: Using DXA to screen adults aged 50 years or older for osteoporosis resulted in a reduced incidence of fragility fractures, lower mortality rate, and reduced total costs. Screening for osteoporosis is a cost-saving strategy and its effectiveness increases with age. However, caution is needed when generalizing these cost-effectiveness results to all older populations because the study population consisted mainly of women.

Development of Automatic flight Control System for Low Cost Unmanned Aerial Vehicle (저가형 무인 항공기의 자동비행시스템 개발)

  • Yoo, Hyuk;Lee, Jang-Ho;Kim, Jae-Eun;An, Yi-Ki
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.10 no.2
    • /
    • pp.131-138
    • /
    • 2004
  • Automatic flight control system (AFCS) for a low-cost unmanned aerial vehicle is described in this paper. Development process and block diagram of the AFCS are introduced. The flight control law for longitudinal and lateral channel autopilot is designed using optimization process. In this procedure, the performance index is composed of desired location of closed loop system poles and H$_2$norm of the resultant flight control system. This procedure is applied to the autopilot design of an unmanned target vehicle. Performance of the AFCS is evaluated by processor-in-the-loop simulation test and flight test. These results show that the AFCS has acceptable performance fur low cost UAV.

Simultaneous Planning of Renewable/ Non-Renewable Distributed Generation Units and Energy Storage Systems in Distribution Networks

  • Jannati, Jamil;Yazdaninejadi, Amin;Talavat, Vahid
    • Transactions on Electrical and Electronic Materials
    • /
    • v.18 no.2
    • /
    • pp.111-118
    • /
    • 2017
  • The increased diversity of different types of energy sources requires moving towards smart distribution networks. This paper proposes a probabilistic DG (distributed generation) units planning model to determine technology type, capacity and location of DG units while simultaneously allocating ESS (energy storage systems) based on pre-determined capacities. This problem is studied in a wind integrated power system considering loads, prices and wind power generation uncertainties. A suitable method for DG unit planning will reduce costs and improve reliability concerns. Objective function is a cost function that minimizes DG investment and operational cost, purchased energy costs from upstream networks, the defined cost to reliability index, energy losses and the investment and degradation costs of ESS. Electrical load is a time variable and the model simulates a typical radial network successfully. The proposed model was solved using the DICOPT solver under GAMS optimization software.

A Study on the Substation Switching System Reliability (신뢰도를 고려한 변전소의 스위칭 평가함수에 관한 연구)

  • Lee, S.K.;Choi, J.Y.;Park, J.K.
    • Proceedings of the KIEE Conference
    • /
    • 1990.11a
    • /
    • pp.235-238
    • /
    • 1990
  • This paper presents a method of finding the optimal path of which is considered the switching cost and the reliability index. The problem is formulated as an optimization problem and solved by the maximum flow/mimimum cut method. The objective of this paper is to find the optimal path and minimize the failure cost and switching cost. Presented method has been simulated and the results are discussed.

  • PDF