• Title/Summary/Keyword: control schedule

Search Result 623, Processing Time 0.028 seconds

Effect of Initial (Reference) Welding Current for Adaptive Control and It's Optimization to Secure Proper Weld Properties in Resistance Spot Welding

  • Ashadudzzaman, Md.;Choi, Il-Dong;Kim, Jae-Won;Nam, Dae-Geun;Park, Yeong-Do
    • Journal of Welding and Joining
    • /
    • v.33 no.6
    • /
    • pp.13-20
    • /
    • 2015
  • Many automotive companies are endeavoring to improve the quality of resistance spot welding by updating body-in-white (BIW) production line with adaptive control spot welding system to compensate the process disturbances such as gap, electrode wear, oxidized surfaces, poor fit up and adhesive etc. Most of the commercial adaptive weld controllers require proper "Initial Welding Schedule" or "Reference weld" to achieve compensation in welding parameters during real time welding. In this study, the compensation of a commercial adaptive weld controller had been observed and analyzed thoroughly for various process disturbances to find optimal initial welding schedule. It was observed that 90 percent of the expulsion current in constant current control as reference welding schedule conferred the maximum button diameter in adaptive control welding. Finally, effects of each disturbance in combined field disturbances system with adaptive control had also been confirmed with the design of experiment (DOE) by minitab(R)16 for combined disturbances situation and suitability of optimum initial weld current had also established with real body part validation test.

Development of Industrial Load Control Algorithm for Factory Energy Management System (F-EMS) under Real Time Pricing Environment (실시간요금제하에서 산업용 수용가의 부하제어알고리즘 개발)

  • Jeon, Jeong-Pyo;Jang, Sung-Il;Kim, Kwang-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.12
    • /
    • pp.1627-1636
    • /
    • 2014
  • In real-time electricity price environment, the energy management system can provide the significant advantage to the residential, commercial and industrial customers since it can reduce the electricity charge by controlling the load operation effectively in response to time-varying price. However, the earlier studies for load management mainly focus on the residential and commercial customers except for the industrial customers because most of load operations in industrial sector are intimately related with production schedule. So, it is possible that the inappropriate control of loads in industrial sector causes huge economic loss. In this paper, therefore, we propose load control algorithm for factory energy management system(F-EMS) to achieve not only minimizing the electricity charges but also maintaining production efficiency by considering characteristics of load operation and production schedule. Considering characteristics of load operation and production schedule, the proposed load control algorithm can reflect the various characteristics of specific industrial customer and control their loads within the range that the production efficiency is maintained. Simulation results show that the proposed load control algorithm for F-EMS leads to significant reduction in the electricity charges and peak power in industrial sector.

Rescheduling algorithms considering unit failure on the batch process management (회분공정의 장치 고장을 고려한 동적생산계획 기법)

  • Ko, Dae-Ho;Moon, Il
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1996.10b
    • /
    • pp.1028-1031
    • /
    • 1996
  • Dynamic scheduling is very important in constructing CIM and improving productivity of chemical processing systems. Computation at the scheduling level requires mostly a long time to generate an optimal schedule, so it is difficult to immediately respond to actual process events in real-time. To solve these problems, we developed dynamic scheduling algorithms such as DSMM(Dynamic Shift Modification Method), PUOM(Parallel Unit Operation Method) and UVVM(Unit Validity Verification Method). Their main functions are to minimize the effects of unexpected disturbances such as process time variations and unit failure, to predict a makespan of the updated dynamic schedule and to modify schedule desirably in real-time responding to process time variations. As a result, the algorithms generate a new pertinent schedule in real-time which is close to the original schedule but provides an efficient way of responding to the variation of process environment. Examples in a shampoo production batch process illustrate the efficiency of the algorithms.

  • PDF

Establishment of Fungicidal Spray Schedule for Effective Control of Apple White Rot 1. Guiding Principles for Selecting Protective Fungicides in Accordance with Apple Growing Season (사과 겹무늬썩음병의 효과적 방제를 위한 약제살포 체계의 수립 1. 사과의 생육시기별 보호살균제의 선택 원칙)

  • 정미혜;김대희;엄재열
    • Korean Journal Plant Pathology
    • /
    • v.10 no.4
    • /
    • pp.284-291
    • /
    • 1994
  • In order to establish an appropriate spray schedule to reduce the infection, 11 kinds of chemicals were tested for their properties on the inhibition of spore germination at the surface of apple fruits and the duration of the inhibitory effect after spray of each chemical was examined from late June to early September with basically 10 day intervals. Actual control efficacy of each chemical by the 8 successive spray and the patterns of waterborne spore dispersals during that periods were also examined. Combining those results with the meteorological observation data, actual control efficacy of each chemical in the given periods could be estimated. It was revealed that folpet, Brodeaux mixture, mancozeb, oxine copper and imminoctadine-triacetate could be used at any time during the possible infection periods. Captan and dithianon could also be used except the rainy season due to the short duration of inhibitory efficacy against spore germination under heavy rain. However, the usefulness of propineb, benomyl and chlorothalonil against the apple white rot could not be demonstrated in this experiment. Thiram, even though has not been used for apple white rot, can also be used before or after the rainy season to control not only white rot but also alternaria blotch.

  • PDF

A Study on how to Associate the Attribute of Procurement and the Calculated Material Requirement by Integrating Schedule and Cost (비용${\cdot}$일정 통합관리를 이용한 자원소요량산출과 발주속성 연계에 관한 연구)

  • Song Young-Woong;Choi Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.498-503
    • /
    • 2002
  • Connecting with cost, schedule, and quality in a construction project, resource management is one of the essential management elements. However, the material requirement planning is built at the beginning stage of construction and needs various concerned factors, it is limited to build the resource management planning on enterprise level. The disconnected communication among managements makes impossible to control historical data. In the construction project control system, the core of management elements is to manage cost and schedule information, therefore material requirement planning should be established based on historical data about EVM which is intergating schedule and cost. In this study, a resource management system concerning material requirement planning and attribute of procurement is suggested by connecting the historical data of EVM and the material requirement planning.

  • PDF

Efficacy by Application Schedule of Fungicides before Harvest Stage for Control of Strawberry Powdery Mildew (딸기 흰가루병 방제를 위한 수확전 약제 처리 시기)

  • Nam, Myeong-Hyeon;Jung, Suck-Kee;Jang, Chang-Soon;Song, Jeong-Young;Kim, Hong-Gi
    • Research in Plant Disease
    • /
    • v.11 no.1
    • /
    • pp.39-42
    • /
    • 2005
  • Powdery mildew, caused by Sphaerotheca aphanis var. aphanis, is an economically significant disease of strawberry in Korea. When powdery mildew is not controlled adequately, it often spreads rapidly through strawberry plants and damage is associated with reduced yields. Proper timing of fungicide applications is, therefore, essential for effective disease control. This study evaluated the efficacy by application schedule of fungicides before harvest stage for preventing powdery mildew in 2001-2003. The systemic fungicides, azoxystrobin, kresoxim-methyl, and cupper fungicide DBEDC were applied preventively during the first part of the cultivating season. Preventative applications of DBEDC by dipping treatment before transplanting and kresoxim-methyl by foliar spray before blooming stage were one of the most effective control schedule tested to prevent and manage this disease. This research demonstrated the significance of application time to control of powdery mildew, particularly provided elimination unnecessary sprays of agrochemicals and reduction costs for strawberry growers.

The study of autopilot system with pre-designed gain schedule (이득 스케쥴을 이용한 항공기 자동조종장치의 구성)

  • 장정순;박춘배
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1993.10a
    • /
    • pp.613-618
    • /
    • 1993
  • This paper presents the aircraft autopilot system with a pre-designed gain schedule. It is mainly consisted of the parameter estimation end the autopilot system design. For off-line parameter estimation, leastsquare methods are investigated. The design of a controller is done in frequenced domain using classical control method and it is designed to satisfy the predetermined requirement such as time constant and transient response. Finally, it is compared with a optimal regulator.

  • PDF

A Scheduling Method of Periodic Data in the Foundation Filedbus and Experimental Evaluation (Foundation Fieldbus에서 주기적 데이터 스케듈링 기법 및 실험적 평가)

  • Song Sung Min;Hong Seung Ho
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.11 no.2
    • /
    • pp.167-174
    • /
    • 2005
  • This paper experimentally validates the efficacy of scheduling method that satisfies the performance requirement of periodic data in the Foundation Fieldbus. The scheduling method allocates periodic data traffic to a bandwidth-limited fieldbus medium. The scheduling method generates schedule list that records schedule starting time and schedule period of each periodic data. This study developed an experimental model of a Foundation Fieldbus network system. Using the experimental model, this study showed that the scheduling method can be easily implemented in a practical Foundation Fieldbus network system. The results obtained from the experimental evaluation showed that the scheduling method restricts the delay of periodic data to a pre-specified bound.

A Study on the Cost and Schedule Integration Model based on the Improvement of Work Packaging Mode (Work Packaging Model의 개선을 통한 공정 - 공사비 통합모델 구축)

  • Kim Yang-Taek;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.4 s.4
    • /
    • pp.82-90
    • /
    • 2000
  • An integrated cost and schedule control is a noteworthy alternative of the separate control method which is commonly used in the domestic construction industry. In Korea, some cost and schedule integration models have been applied partly by construction managers. But, these models have not been customized yet because they did not reflect the characteristics of the domestic construction industry. This study investigates the characteristics of domestic integration models analyzed through interviews with experts who have the experiences in applying cost-schedule integration models. Based on these surveys, this study suggests the strategy for the improvement of work packaging model in the domestic construction industry.

  • PDF

Effects of Olanzapine on the Schedule-Induced Polydipsic Rats (Olanzapine이 백서의 Schedule-Induced Polydipsia에 미치는 영향)

  • Lee, Gi-Chul;Lee, Kyung-Kyu;Chang, Hwan-Il;Lee, Jung-Ho;Kim, Hyun-Woo;Ha, Jun-Myung;Jeong, Jae-Hyun;Jeong, Hong-Kyung
    • Korean Journal of Biological Psychiatry
    • /
    • v.6 no.2
    • /
    • pp.240-245
    • /
    • 1999
  • Object : This study was designed to evaluate the effects of olanzapine on the schedule-induced polydipsia(SIP) which is one of animal model of obsessive-compulsive disorder in rats. We administered olanzapine as a serotonin and dopamine blocking agent, fluoxetine as a selective serotonin reuptake inhibitor, and haloperidol for the dopamine antagonist to rats which showed schedule-induced polydipsic behavior. Methods : Spraque-Dawley rats weighing 200-250gm were individually housed and maintained and allowed free access to water. The rats were placed on a restricted diet. To induce polydipsia, rats were placed in the cage where a pellet dispenser automatically dispensed 90mg pellets on a fixed-time 60 seconds(FT-60s) feeding schedule over 150 minute test session per day. Water was available at all times in the cage. After 4 weeks of daily exposure to the FT 60s feeding schedule, experimental rats met a predetermined criterion for polydipsic behavior(greater than 3 times of water per session on average). 5 groups of rats were administered olanzapine(3mg/kg, i.p), olanzapine(10mg/kg, i.p), fluoxetine(5mg/kg, i.p.), haloperidol(0.1mg/kg, i.p.), and vehicle(1cc/kg, i.p.) for 3 weeks. The rats were tested once a week to access schedule induced polydipsic behavior. Water bottles were weighed before and after the 150-minute test session. The chronic effects of administration of experimental drugs on schedule induced polydipsic behavior were analyzed with ANOVA and Scheffe test as a posthoc comparison. In order to measure water consumption in non-polydipsic food-deprived rats, a separate group of rats(N=8) were individually housed and given a single bolus(14.5gm) of food per day which maintained them at their average body weight. Results and Conclusion : The results were as follows ; 1) After 4 weeks of scheduled feeding procedure, the experimental group showed significant differences than the bolus control in the amount of water consumption as compared with their average water intakes for 4 weeks. At the same periods, there were no differences between the experimental group and the bolus control in the body weight. 2) The fluoxetine group showed significant decrease in the amount of water intake over the 3 weeks of drug treatment as compared with their average amount of polydipsic water intakes. The olanzapine 3mg group showed significant decrease in the amount of water intake at 3rd weeks of drug treatment as compared with their average amount of polydipsic water intakes. The olanzapine 10mg group showed significant decrease in the amount of water intake at 2nd and 3rd weeks of drug treatment as compared with their average amount of polydipsic water intakes. However, the haloperidol group and the vehicle control group showed no changes of amounts of water intake for 3 weeks of treatment as compared with their average amount of polydipsic water intakes. 3) The fluoxetine group showed significantly lower amounts of water intake than the haloperidol group at 2nd weeks of drug treatment. And also the fluoxetine group showed significantly lower amounts of water intake than the haloperidol group and the vehicle control at 3rd weeks of drug treatment. The olanzapine 3mg group and the olanzapine 10mg group showed significantly lower amounts of water intake than the haloperidol group and the vehicle control at 3rd weeks of drug treatment. Above findings suggest that the fixed time feeding procedure for schedule-induced polydipsia as an animal model of obsessive compulsive disorder was effective to the evaluation of pharmacological challenge study. The authors assume that the serotonin hypothesis and the serotonin-dopamine interaction hypothesis are preferred to the dopamine hypothesis in the biological etiology of obsessive-compulsive disorder.

  • PDF