• Title/Summary/Keyword: control requirement

Search Result 1,378, Processing Time 0.028 seconds

An Application of the Super Flowing Concrete in Site (초유동 콘크리트의 현장시공)

  • 권영호;이상수;김동석;김진근;박칠림
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1996.04a
    • /
    • pp.402-407
    • /
    • 1996
  • In this paper, we described the basic elements(flowability, fillingability, elapsed time, pumpability, no-vibrating effects, and etc.) required for the application and quality control of the super flowing concrete (SFC) in construction site. Also, after investigating characteristics of SFC through various experiments, SFC were placed in the reaction wall of large scale structural laboratory in Deawoo Insititute of Construction Technology. As the result of this project, the developed SFC showed high flowability and self-filingability good enough for the requirement. Furthermore, quality control and assurance of the no-vibrating concrete in actual site was verified by various testing.

  • PDF

A Study of Security for Stream Control Transmission Protocol (스트림 제어 전송 프로토콜의 보안에 관한 연구)

  • 조은경;권영희
    • Proceedings of the IEEK Conference
    • /
    • 2002.06c
    • /
    • pp.189-192
    • /
    • 2002
  • This paper has been studied some security issues o( stream control transmission protocol and designed some functional requirement for IPsec and IKE to facilitate their use for securing SCTP. In particular, some additional support in the form of new ID type in IKE and some implementation choices in the IPsec processing to accomodate for the multiplicity of source and destination addresses associated with a single SCTP association.

  • PDF

Procedure of Quantitative Safety Assessment for Risk Management System (위험관리시스템 구축을 위한 정량적 안전평가 절차)

  • Jung, Won
    • Journal of Applied Reliability
    • /
    • v.9 no.3
    • /
    • pp.165-176
    • /
    • 2009
  • The risk management case is an organization's formal arrangement to ensure the safety of its work activity within risk management system. It allows an organization to demonstrate its capability in achieving its safety objectives and in meeting regulatory requirements. This paper presents how the safety assessments are described, prepared and maintained to meet the criteria specified by the upcoming safety regulations. We propose the elements of risk management system that include arrangements for the ongoing identification of hazards, assessment of risks and the implementation of necessary control measures.

  • PDF

Avatar Control by using hand gesture recognition (Hand Gesture 인식을 이용한 아바타 제어)

  • 최우영;김소연;송백균
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2004.05b
    • /
    • pp.616-619
    • /
    • 2004
  • As interests Un virtual reality being increased, the importance of HCI(Human computer interaction) field using gesture is also increased. However, in the preceding gesture recognition, the requirement of high-cost peripheral equipments limits users right. In this paper we suggest that through using low cost of USB PC-camera users are allowed to have more flexibly and cost down so that it can be adopted much commonly.

  • PDF

Optimal Incorporation Level of Dietary Alternative Phosphate (MgHPO4) and Requirement for Phosphorus in Juvenile Far Eastern Catfish (Silurus asotus)

  • Yoon, Tae-Hyun;Lee, Dong-Hoon;Won, Seung-Gun;Ra, Chang-Six;Kim, Jeong-Dae
    • Asian-Australasian Journal of Animal Sciences
    • /
    • v.28 no.1
    • /
    • pp.111-119
    • /
    • 2015
  • A growth trial was conducted to determine the optimal incorporation level of dietary magnesium hydrogen phosphate (MHP, $MgHPO_4$), which was manufactured from swine manure and phosphorus (P), required by juvenile far eastern catfish (Silurus asotus). Graded MHP of 0.5%, 1.0%, 1.5%, and 2.0%, and 2.0% monocalcium phosphate (MCP) each was added to the basal diet (control) in lieu of cellulose to become the range of available P (AP) from 0.4% to 0.8% of which diets were designated as control, MHP0.5, MHP1.0, MHP1.5, MHP2.0, and MCP, respectively. Control diet contained fish meal (20%), soybean meal (40%), wheat flour (27%), corn gluten meal (5%), fish oil (2%) and soy oil (2%) as main ingredients. Following a 24 h fasting, 540 fish with a mean body weight of 11.8 g were randomly allotted to 6 groups in triplicate, whereby 18 tanks ($0.4{\times}0.6{\times}0.36cm$, water volume of 66 L) were prepared. The feeding experiment lasted for 8 weeks. Fish group fed the control diet showed the lowest weight gain (WG) and feed efficiency (FE) among treatments. The WG was, however, not significantly different (p>0.05) from that of fish group fed MHP0.5. Fish group fed MHP2.0 showed the highest WG and FE of which values were not significantly different from those of fish groups fed diets MHP1.0 and MHP1.5 as well as MCP (p>0.05) except fish groups fed control and MHP0.5. Aspartate aminotransferase was significantly decreased with an increase in available P, while alanine aminotransferase did not show a significant difference among treatment. The highest inorganic P in plasma was observed in fish fed MHP2.0. From the present results, a second-order regression analysis revealed that the optimal dietary MHP level and the AP requirement were found to be 1.62% and 0.7%, respectively.

A Study on an acceptance of CDC guideline on practical emergency department planning -Focusing on comparison CDC guideline to Emergency Medical Service Act- (응급실에서의 감염관리 표준지침의 반영에 관한 연구 -응급실에서의 감염관리 표준지침과 응급의료에 관한 법률의 반영 비교를 중심으로-)

  • Yoon, Hyung Jin;Oh, Joon-Gul
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.11
    • /
    • pp.7237-7243
    • /
    • 2015
  • Korea Centers for Disease Control and Prevention(CDC) has been provided not only manual of managing infectious patient but also functional requirement of space in emergency department(ED) by distributing "Guideline for infection control in emergency department(GICED)" in 2009. To understand how much the guideline enforces its functional requirement on ED planning practice, it is compared to Emergency Medical Service Act(EMSA) a basic standard for ED planning. As a result, it is clear that those have different focal point in functional program and don't share infection control issue. By reviewing target hospitals' EDs opened around 2009, all ED have satisfied with the EMSA requirement but guideline. Those are selectively adapted infection control related spaces CDC guideline suggested regardless of open year so that target EDs are not to be influenced by the guideline. This research can support as a reference research when the EMSA are going to be reinforced by infection contol issue.

A Proposition for Smart Warehouse Management System (SWMS) through IoT (IoT를 채용한 스마트 창고관리 시스템 설계 제안)

  • Kim, Jun Yeong;Jeon, Byeong-Woo;Hong, Dae Geun;Suh, Suk-Hwan
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.11 no.2
    • /
    • pp.85-93
    • /
    • 2015
  • Warehouse Management System (WMS) is a key control for Material Handling System (MHS) and Inventory Control System (ICS). How to design and implement for WMS is crucial factor for achieving the key performance index for Manufacturing Industry. In particular, iron and steel making industry, where the volume and weight is large and hence FIFO (First Input First Out) is not working, how to design WMS is a key factor. In this paper, we systematically define the problem of WMS via developing StR (Stakeholders' Requirements) or ORD (Operational Requirement Documents), SyR (System Requirement), and SA (System Architecture) based on the emerging technologies. In particular, IoT (Internet of Things), CPS (Cyber Physical System) concepts and enabling technologies haves been incorporated in developing Smart WMS. The deliverables of the research can provide a conceptual framework for developing the next generation industrial WMS.

Development and Application of Computer Aided Systems Engineering Processes for Next Generation High Speed Railway Train -Focus on Requirement Management Structure and PBS Management Structure- (차세대 고속전철시스템 개발을 위한 시스템 엔지니어링 체계 구축 -요구사항 관리체계와 PBS 관리체계를 중심으로-)

  • 유일상;박영원
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.25 no.4
    • /
    • pp.22-31
    • /
    • 2002
  • A high-speed rail system represents a typical example of large-scale multi-disciplinary systems, consisting of subsystems such as train, electrical hardware, electronics, control, information, communication, civil technology etc. The system design and acquisition data of the large-scale system must be the subject under strict configuration control and management. Not only the requirements of the large-scale system dictate the contracts with the suppliers but also become the basis for the development process, project execution, system integration, and testing. The requirements database provide the system design specification of all development activities. Using the RDD-100, a systems engineering tool, the Korea next-generation high-speed rail program can establish requirements traceability and development process management in performing the enabling train technology development projects. This paper presents the results from a computer-aided systems engineering application to the Korea next-generation high-speed railway project. Especially, the focus of the study was on requirement management and PBS(Product Breakdown Structure) management.

A Study on the PHA of ATP Equipment for the Korean Tilting Train (한국형 틸팅열차 ATP장치 예비위험원분석에 관한 연구)

  • Shin, Duc-Ko;Baek, Jong-Hyen;Lee, Kang-Mi;Kim, Yong-Kyu
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1959-1962
    • /
    • 2009
  • In this paper, we derive the hazard which is a criterion of safety assurance by PHA for the ATP equipped in Korea Tilting Train. The ATP onboard equipment in Korea Tilting Train was introduced as ETCS Level l(which is ETCS specification). Also, the ATP trackside equipment was introduced as a ETCS SRS(System Requirement Specification) 2.2.2 and it has a target for commercial operation in 2009 late. In IEC 62278(EN50126), it recommend of PHA to derive a hazard of target system in concept establishment step and estimate if it can control as a tolerable level and then derive safety case to control the hazard by lifecycle. Therefore, we indicate the hazard using criterion of safety assurance by PHA using FRS (Functional Requirement Specification) 5.0. which is a upper criterion than SRS. The hazard of ATP onboard equipment derived in Korea Tilting Train will be able to use as ATP functional hazards of unified onboard equipment in G7 which is a multiple unit and preliminary hazards of ATP onboard equipment in NEL drived by Korail.

  • PDF

A Design on the Information Security Auditing Framework of the Information System Audit (정보시스템 감리에서의 정보보호 감리모형 설계)

  • Lee, Ji Yong;Kim, Dong Soo;Kim, Hee Wan
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.6 no.2
    • /
    • pp.233-245
    • /
    • 2010
  • This paper proposes security architecture, security audit framework, and audit check item. These are based on the security requirement that has been researched in the information system audit. The proposed information security architecture is built in a way that it could defend a cyber attack. According to its life cycle, it considers a security service and security control that is required by the information system. It is mapped in a way that it can control the security technology and security environment. As a result, an audit framework of the information system is presented based on the security requirement and security architecture. The standard checkpoints of security audit are of the highest level. It was applied to the system introduction for the next generation of D stock and D life insurance company. Also, it was applied to the human resources information system of K institution and was verified. Before applying to institutions, system developers and administrators were educated about their awareness about security so that they can follow guidelines of a developer security. As a result, the systemic security problems were decreased by more than eighty percent.