• 제목/요약/키워드: contractor

검색결과 537건 처리시간 0.024초

RISK ANALYSIS FOR INDUSTRIAL PROJECT IN CONSTRUCTION PHASE: A MONTE-CARLO SIMULATION APPROACH

  • Soo-Yong Kim;Luu Truong Van;Han-Ki Ha;Nguyen Quoc Tuan
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.130-139
    • /
    • 2007
  • This paper presents a study on risk analysis in terms of contractor's costs in construction phase in which Crystal ball (software of Decisioneering, UK) has been utilized as a main tool. To realize it, a questionnaire survey has been carried out to identify the dominant factors that strongly influence contractor costs in Vietnam. Based on results of questionnaire investigation, the survey identified three factors which were duration of each construction task, costs of reinforcing steel, and cement. Then a spreadsheet model was created in order to analyze risks. The study also indicates that the cost of reinforcing steel and cement are the cause of risks for contractors. According to the suggested model, contractors may foresee the probability of completion within the approved budget, and the possibility of earning in accordance with owner's payment conditions.

  • PDF

CONSTRUCTION COST CLAIMS, OR ENTITLEMENTS?

  • Tan Hock Soon Adrias
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.150-159
    • /
    • 2007
  • More often than not, cost claims which are legitimately due and entitled to the contractor for works done, or for loss and expense incurred arising from disruption, prolongation and delay, are surprising not successfully recovered, whether in whole or in part, or none at all. One of the main reasons attributing to such scenario, is due to either the contractor, employer or the consultants and their poor understanding of and adherence to established and proper contractual rubric that is embodied in the building construction contract for the works. This paper explores some such pitfalls that could very well spell the ultimate financial disaster for many contractors, and highlights salient and essential intimations that contractors and consultants should watch out for.

  • PDF

BALANCED SCORECARD PERFORMANCE MEASUREMENT AND CONTRACTOR SELECTION USING A WEB-BASED SYSTEM

  • J. Johnson;V. Peansupap;S. Jayasena
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.259-268
    • /
    • 2007
  • In a very competitive construction business environment there is a need to measure and manage business performance across a wider spectrum of business success criteria. The Balanced Scorecard (BSC) and Triple Bottom Line (TBL) reporting concepts are emerging as champions in the race for sustainable business success. The construction business organisations are often judged based on their financial performance as well as wider performance. This paper aims at developing a universally accepted tool for assessing contractors' wider business performance in the construction industry. A prototype of web-based business performance measurement system has been developed to help contractors assess their own performance aimed at uplifting their performance. The consultants/clients can also use the tool to measure contractors' performance in a value-based contractor selection. The system was developed based on the research conducted among 63 senior construction professionals and therefore further research with the participation of a large number of managers across different countries and also an upgrade of the system will be required.

  • PDF

STRATEGIC ANALYSIS OF SINGAPORE CONSTRUCTION MARKET-A CHINESE CONTRACTOR'S PERSPECTIVES

  • Liu Yanzhe;David A. S. Chew;Ma Yanzhi
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.787-799
    • /
    • 2007
  • The Singapore construction market has just recovered from the decline of the last seven years. Past annual construction volume remains around S$10 to 12 billion and the market is saturated with local and international contractors. This study examined the competitiveness of the construction market from the perspective of a Chinese contractor. The case company in this study is China Construction (SP) Development Co Pte Ltd. The purpose of this study is to use strategic research and management methods to analyze the case company's internal and external environment and development strategies, so as to bring about the approaches and measures to achieve its strategic targets.

  • PDF

A SYSTMATIC APPROACH FOR APPORTIONING CONCURRENT DELAY

  • Nie-Jia Yau;Chia-Chi Chang
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.520-529
    • /
    • 2007
  • Apportioning responsibilities of concurrent delay to the owner and the contractor is a difficult task, due to the sophisticate nature both in the schedule and in the factors that cause the delay. This research attempts to develop a simplified yet systematic approach that can be used for a fair apportionment of concurrent delay. A concurrent delay is defined herein as when the contractor and the owner have both caused independent critical path delays during the same approximate time period. Incorporating the concepts of windows analysis and critical path method (CPM), the developed approach has three "windowing of delay" steps to quickly apportion the delay in each of these windows, and a fourth step to sum up those apportioned delays to obtain each party's final responsibilities. This developed approach is found to be simple and effective at this stage; it will be tested against real cases in the near future.

  • PDF

MODELS FOR PREDICTING SINGAPORE CONTRACTORS' EXTENT OF INTERNATIONALIZATION

  • Florence Y.Y. Ling;Denise H.Y. Kwok
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.995-999
    • /
    • 2009
  • Before a contractor embarks on exporting its services, it needs to know if it is likely to succeed. This research developed two prediction models to help contractors in Singapore predict the number of projects (Y1) and the contract values (Y2) that they are likely to secure from overseas. Detailed characteristics of 60 contractors who export their services (exporters) were obtained from the database of registered contractors in Singapore. Multiple linear regression models were developed and tests showed that Y1 is a robust model. A contractor's chance of winning more overseas projects may be predicted by the number of projects it acted as a subcontractor; the variety of projects it undertakes; the total contract value in the domestic market; and the number of countries it exported its services to. It is recommended that contractors who are planning to export their services be flexible instead of adopt a focused policy of undertaking only one or two project types in a few selected countries.

  • PDF

COMPETITOR ANALYSIS IN CONSTRUCTION BIDDING

  • B. L. Oo
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.161-167
    • /
    • 2009
  • This paper offers a competitor analysis model for use by contractors as parts of more informed approach in identifying key competitors, and as a basis for formulating bidding strategies. Linear mixed model approach is used in measuring competitiveness between bids (by using bid competitiveness percentage) according to: (i) project size, (ii) work sector; (iii) work nature; and (iv) number of bidders. The model was tested empirically by application to a bidding dataset obtained from a large Hong Kong contractor. Allowing for heterogeneity across competing contractors (i.e. with the model parameters that varied across contractors), the results indicate that competitiveness in bidding of this contractor is generally greater than the majority of his competitors.

  • PDF

Construction Cost Forensics: How Best To Protect Your Company And Avoid Costly Problems

  • Opfer, Neil
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.1240-1240
    • /
    • 2022
  • Construction projects are fraught with risks from cost or other overruns to accidents along with other issues. This is true whether the relevant organization is an owner, general contractor, CM, specialty-trade contractor, or other entity. When cost issues or other issues confront arise, how should an organization proceed whether attempting to gain additional compensation in terms of cost/other damages or protecting the same against such claims if they do not appear to be warranted? Enter construction cost forensics. This presentation will focus on strategies/techniques with construction cost forensics in these areas in order to be successful. Covered techniques include those to develop and analyze claims including fundamental construction cost analysis techniques. When an unexpected event disrupts a construction project, using sound analytical methods to identify the cause and quantify the extent of the issue will be important for negotiating a fair result or for obtaining a successful outcome in arbitration or litigation. Key examples of uncovering issues via construction cost forensics will be covered in this presentation.

  • PDF

Claim Management Process of General Contractors in South Korea

  • Seo, Wonkyoung;Kang, Youngcheol
    • 국제학술발표논문집
    • /
    • The 8th International Conference on Construction Engineering and Project Management
    • /
    • pp.207-215
    • /
    • 2020
  • The purpose of this study is to investigate the current status of claim management process of general contractors in South Korea. As the claim management becomes more important nowadays, maintaining the process for claim management systematically and consistently becomes more important as well. To improve the claim management process, it is necessary to diagnose the current status of claim management process so companies establish their targets for improvement. This study develops a survey to identify the current status of claim management process that major general contractors in South Korea have. Questions in the survey are classified into four categories including entitlement check, potential claim event check, time bar check, and tasks for substantiation. By conducting a series of statistical analyses with 94 survey data collected from employees working in the general contractor companies in South Korea, this study examines and analyzes their claim management process in terms of the several categories. It is expected that the results contribute to diagnosing how practitioners maintain their claim management, which will help them establish the direction of management enhancement.

  • PDF

건설공사 주체별의 품질관리제도 인식수준에 관한 연구 (A Study on the Perception Level of Quality Management System by Construction Subject )

  • 김성덕;조아영;이정석
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 가을학술발표대회논문집
    • /
    • pp.253-254
    • /
    • 2023
  • We this study investiged the level of perception such as construction quality-related systems according to the subject of construction work. The results of the recognition moisture survey showed a high response rate in the order of construction companies and supervisors. The result of the system's level of understanding was low at 3.6 points for the orderer and contractor. In addition, in recognition of the effectiveness of the quality management system, the contractor showed a somewhat negative perception than other targets.

  • PDF