• Title/Summary/Keyword: contract management

Search Result 1,086, Processing Time 0.024 seconds

A Checklist for Assessment of Risks Involved in IT Service Project Contract (IT 서비스 프로젝트 계약서 위험 요인 평가 체크리스트)

  • Jeong, Eun Joo;Jeong, Seung Ryul
    • Journal of Internet Computing and Services
    • /
    • v.15 no.4
    • /
    • pp.57-65
    • /
    • 2014
  • Risk factors are the reason behind cost overruns and delays in long-term large-scale IT service projects. Major risks originate from the integration of complex IT system components, including software, hardware, and solutions; the competitive bidding process; the turnkey and firm-fixed price nature of contracts; and the project execution environment. We have identified several risk factors such as delay in acceptance, low quality of deliverables, delay in payment, adding and changing requirements and scope, unclear definition of roles and responsibilities of the buyer and supplier, and unclear procedures of change and quality management during the project execution phase. One needs to manage risks proactively before signing the contract. In order to weed out or lower the risk factors well in advance, we need to identify and remove risk factors contained in contract clauses and attached contract documents. We propose a checklist for assessing IT service project contracts. To validate the checklist's utility, we applied it to an IT service project in the finance industry. The results show that the checklist is effective in identifying and removing risk factors pertaining to IT service projects.

A Study on the Suggestion of Construction Contract Practice in the Public Project through the analysis of Construction Claims (건설클레임 사례분석을 통한 입찰 및 계약제도 개선에 대한 연구)

  • Cho Young-Jun;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.1 s.5
    • /
    • pp.78-87
    • /
    • 2001
  • Recently many construction claims related to the ommission and discrepancy of design document are alleged since 1998 and various dispute resolution methods are appeared. But many contractors alleged claims are not satisfied with the result because of not sufficiently reflecting construction practice. The purpose of this study is to analyze the liability of contract privity from the view point of the contract related law and to analyze the claims and claim factor, and to suggest construction contract practice in the public project. The construction claims related to the design document may be minimized, through (1) the accumulation and retrieval of standard forms by owners' type, (2) the usage of specified specification considering project characteristics, (3) the materialization of detail subsurface design and various contract method in heavy engineering construction.

  • PDF

A Proposal of Improvement Devices for General Conditions of Contract in Claim-related Provisions (공사계약일반조건의 클레임 관련 조항의 개선방향)

  • paik, Hwa-Sook;Yang, Chang-Hyun;Yoon, Ja-Young;Kim, Kyung-Hwan;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.273-276
    • /
    • 2007
  • Construction work has character which claim or dispute is frequently raised. This means that each construction project has it's own contract documents due to the difference of environment and time. Therefore to overcome the associated risks, domestic contract rules and acts should be reformed. Several well-recognized contract documents developed by FIDIC, AlA, CMAA and general conditions of the contract is investigated and analyzed. Based on the research outcomes the direction of reformation is suggested.

  • PDF

Smart Contract's Hierarchical Rules Modularization and Security Mechanism (스마트 컨트랙트의 계층형 규칙 모듈화와 보안 메커니즘)

  • An, Jung Hyun;Na, Sung Hyun;Park, Young B.
    • Journal of the Semiconductor & Display Technology
    • /
    • v.18 no.1
    • /
    • pp.74-78
    • /
    • 2019
  • As software becomes larger and network technology develops, the management of distributed data becomes more popular. Therefore, it is becoming increasingly important to use blockchain technology that can guarantee the integrity of data in various fields by utilizing existing infrastructure. Blockchain is a distributed computing technology that ensures that servers participating in a network maintain and manage data according to specific agreement algorithms and rules to ensure integrity. As smart contracts are applied, not only passwords but also various services to be applied to the code. In order to reinforce existing research on smart contract applied to the blockchain, we proposed a dynamic conditional rule of smart contract that can formalize rules of smart contract by introducing ontology and SWRL and manage rules dynamically in various situations. In the previous research, there is a module that receives the upper rule in the blockchain network, and the rule layer is formed according to this module. However, for every transaction request, it is a lot of resources to check the top rule in a blockchain network, or to provide it to every blockchain network by a reputable organization every time the rule is updated. To solve this problem, we propose to separate the module responsible for the upper rule into an independent server. Since the module responsible for the above rules is separated into servers, the rules underlying the service may be transformed or attacked in the middleware. Therefore, the security mechanism using TLS and PKI is added as an agent in consideration of the security factor. In this way, the benefits of computing resource management and security can be achieved at the same time.

A study on the Ethics Characteristics according to Service and Practice of Construction Manager (건설사업관리자의 업무수행에 따른 윤리 특성 고찰)

  • Lee, Sang-Beom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.97-106
    • /
    • 2011
  • Construction Management is the overall management of the project as construction manager and the owner are united together. Construction manager's role is to conduct the overall or partial construction administration in the 'design, bid, build' process, in the owner's interests with maintaining technical neutrality. Construction manager is becoming one of new professionals in the building process and the contract defines their roles and the range of services, so high level of ethnics are required. This study suggests the legal status of the construction manager and the ethnic standards and the ethnic's characteristics. In conclusion, firstly, the legal characteristics of the administration of construction management are the delegations contract, the responsibility of negligence and the duty of due diligence, abided by the contract that ties between the owner and the construction manger. Secondly, the administerial characteristics of the construction management are the role of mediator, the service of professional technology, accountability to the owner and publicness. Thirdly, due to these characteristics, as a professional, the standard of ethnic assessment for the construction project manager are intention, act and result, so with the relation to that, morality, deontology and consequentialism have been suggested in this study.

The Effect of Organizational Justice and Psychological Contract on Turnover Intention as Mediated by Trust and Distrust (조직공정성과 심리적 계약이 신뢰와 불신을 매개로 이직의도에 미치는 영향)

  • Kim, Do-Kyun;Yang, Hae-Sool
    • Journal of Digital Convergence
    • /
    • v.15 no.8
    • /
    • pp.115-126
    • /
    • 2017
  • Organizational trust is recognized as a factor that is directly linked to the organization's success in the sudden change represented by the 4th Industrial Revolution and uncertainties. This study selected trust and distrust as separate concepts and verified the structural relationship between organizational justice, psychological contract, trust, distrust, and turnover intention. Organizational justice was significant as a antecedents of distrust, whereas psychological contract was antecedents of trust, and distrust only had a significant effect on turnover intention. This result supports that trust and distrust are not one dimensions but two separate concepts. Also, organizational justice had no direct effect on turnover intention and only indirect effect through distrust was significant. This study has implications for both theoretical and practical aspects in terms of identifying the differential effects of trust and distrust.

Relationship between Work Unstability and Personal Medical Expenditure Ratio (고용불안정과 가구소득 대비 개인 의료비 지출 비중의 연관성)

  • Jung, Woo-young;Han, Yun-su;Kim, Chan-ho;Hwang, Yun-tae;Lee, Yejin;Noh, Young-Min;Noh, Jin-Won
    • Korea Journal of Hospital Management
    • /
    • v.24 no.2
    • /
    • pp.1-11
    • /
    • 2019
  • Purpose: The purpose of this study is to identify relationship between work unstability and personal medical expenditure ratio focusing on wage workers' contract period. Method: This study analyzed 2015 yearly data beta version of Korea Health Panel, co-managed by Korea Institute for Health and Social Affairs and National Insurance Corporation for data analysis. When executing linear regression, Household income was applied with equivalized income, and the proportion of personal medical expenditure was naturally logged to perform linear regression and the demographic and socioeconomic factors were taken into account. The demographic and socio-economic factors were also considered. Findings: As a result of reviewing the used factors, it was found that the more unstable work status, the higher personal medical expenditure ratio. This result corresponds to 'The Theory of Fundamental Causes' by Link & Phelan. Conclusion : It indicates that policy efforts should be made to improve the working environment and health level of socially unstable workers.

A Pilot Study on the Present State and Transformation of Construction Management Actors of USFK's EC Projects (주한 미군 EC 프로젝트의 현황과 시공관리 주체의 변화에 대한 기초연구)

  • Kim, Duk-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.3 s.31
    • /
    • pp.65-75
    • /
    • 2006
  • Emerging trends regarding USFK(United States Forces, Korea)'s EC(Engineering/Construction) market include: (1) introduction of MATOC(Multiple Award Task Order Contract); (2) increase of DB(Design-Build) contract; and (3) encroachment of large US-origin private EC firms upon Korea. This study analyzes the change of USFK's EC market with focus on the change of construction management actors for USFK's EC projects. Specifically, USFK's EC projects have been managed by FED(Far East District). Recently, however, the large US private EC companies substitute the role previously taken by FED. This phenomenon is accelerated by the business chances in Korea due to LPP(Land Partnership Plan) and intentions of US Government to save military construction costs by means of utilizing US private EC companies. The large US EC firms entering into Korea are business opportunities as well as challenges to Korean EC firms, which are contracting USFK's EC projects. This study concludes that, through teaming joint venture with the large US EC firms, the market changes can be opportunities to acquire foreign market information and learn advanced construction management skill from them.

A Structural Model Analysis of Psychological Contract Breach, Psychological Contract Violation, and Employee Outcomes - A Case of Five Star Deluxe Hotel Employees - (인지된 계약위반, 경험된 계약위반과 직원의 조직행동 간의 구조적 관계에 관한 연구 - 특 1급 호텔 종사원을 중심으로 -)

  • Kim, Ji-Eun;Kwon, Yong-Ju
    • Culinary science and hospitality research
    • /
    • v.19 no.4
    • /
    • pp.56-76
    • /
    • 2013
  • With a distinction made between contract breach and contract violation, this study develops a structural model that investigates whether each dimension of contract breach influences experience of a contract violation in the hotel industry. At the same time, the impact of such a violation on hotel employees' work outcomes has been studied. One hundred and seventy eight employees, who are employed in five star deluxe hotels participated in the study and a structural equation modeling(SEM) is employed. The result indicated that good working relationship, and training and development, a so called relational oriented breach, make positively significant impact on contract violation. Whereas, benefits and salary categorized as transactional oriented breach does not. Also, the suggested employee outcomes including high turnover intent, low job satisfaction, and person-organization fit have been influenced by contract violation. As a result, hotel practitioners need to clarify the contract items prior to employment and during employment and to prepare to react to unmet promises.

  • PDF

Valuation of highway O&M contract using real option (실물옵션을 활용한 고속 도로 유지관리 계약의 가치산정)

  • Park, Taeil;Shin, Eun-Young;Lee, Yoo-Sub
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.11
    • /
    • pp.5964-5970
    • /
    • 2013
  • The recent budget planning for highway infrastructure implied that the investments for Operation & Maintenance(O&M) became greater than that for new construction. This circumstance made many stakeholders pay attention to the O&M of road infrastructure and adopt other countries' policies and system for effective management. In other countries, most O&M for road infrastructure have been done by private entities using long-term contract and Korea is about to shift from one year contract to long-term contract. The most important parts for the expansion of the long-term O&M contract for road infrastructure are valuation of the O&M contract based on accurate prediction of O&M costs and instrument for proper risk sharing between contracting parties. Thus, this study provides a methodology to estimate a reasonable O&M contract price and a framework to share contract risk between contracting parties using real option. The analysis results showed that the contract price and ceiling and floor conditions for the 20 year-contract of 20 km-highway project were 45.7, 60 and 42.3 billion won, respectively.