• Title/Summary/Keyword: continuous joint

Search Result 379, Processing Time 0.023 seconds

On Distribution of Order Statistics from Kumaraswamy Distribution

  • Garg, Mridula
    • Kyungpook Mathematical Journal
    • /
    • v.48 no.3
    • /
    • pp.411-417
    • /
    • 2008
  • In the present paper we derive the distribution of single order statistics, joint distribution of two order statistics and the distribution of product and quotient of two order statistics when the independent random variables are from continuous Kumaraswamy distribution. In particular the distribution of product and quotient of extreme order statistics and consecutive order statistics have also been obtained. The method used is based on Mellin transform and its inverse.

A Sufficient Condition for the Independence of Non-Stationary Demand Process and Inventory Position Process under < Q, r > Systems

  • Sung, C.S.
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.8 no.1
    • /
    • pp.22-28
    • /
    • 1982
  • Under a continuous-review inventory system, the inventory position process was proved to be asymptotically independent of the general renewal demand processes, when the two processes form an asymptotic unimodel joint distribution. The analytical technique implemented through this work seems to be more like general, and so the periodic-review system can be similarly investigated. In conclusion, the results may be evaluated to direct to the analytical analyses of some inventory systems which have been treated under some restrictions on demand processes.

  • PDF

CWR for Young Jong Great Bridge Sourth Approach Section by ZLR (Zero Longitudinal Restraint) (종방향 활동체결구를 이용한 영종대교 남측 접속교량의 장대레일화 사례)

  • Lee Duck Young;Yang Sin Chu;Kwon Soon Sub;Kim Yong Man
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.1057-1064
    • /
    • 2004
  • For New In-Cheon Airport. South Approach Section of Young long Great Bridge is to be special concerned to CWR due to substructure was already constructed former railroad bridge design specification. So we applied maintenance free system and CWR (Continuous Welded Rail) by ZLR(Zero Longitudinal Restraint) at bridge expansion joint part. This thesis generally introduce for CWR by ZLR at South Approach Section of Young long Great Bridge.

  • PDF

Effect of Dowel Bar on the transverse joint at the cement concrete pavement by model test (모형실험에 의한 강성포장체 가로줄눈에 다우웰바가 미치는 영향)

  • 배주성;고영주;김평수
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1998.10b
    • /
    • pp.633-636
    • /
    • 1998
  • The use of concrete pavements is increasing by virtue of durability and excellent load resisting capacity. But cracks and demage in concrete pavements may be occurred by continuous reciclic load, as time goes by. Therefore, transverser contraction joints are constructed in concrete pavements to relieve tensile stresses, and when properly spaced they control the location of transverse cracks.

  • PDF

Design of longitudinal prestress of precast decks in twin-girder continuous composite bridges (2거더 연속강합성 교량의 프리캐스트 바닥판 종방향 프리스트레스 설계)

  • Shim, Chang Su;Kim, Hyun Ho;Ha, Tae Yul;Jeon, Seung Min
    • Journal of Korean Society of Steel Construction
    • /
    • v.18 no.5
    • /
    • pp.633-642
    • /
    • 2006
  • Serviceability design is required to control the cracking at the joint of precast decks with longitudinal prestress in continuous composite bridges. Details of twin-girder bridges are especially complex not only due to their main reinforcements and transverse prestresses for the design of long-span concrete slabs, but also due to the shear pockets for obtaining the composite action. This paper suggests the design guidelines for the magnitude of the effective prestress and for the selection of filling materials and their requirements that would allow for the use of precast decks for twin-girder continuous composite bridges. The necessary initial prestress was also evaluated through long-term behavior analysis. From the analysis, existing design examples were revised and their effectiveness was estimated. When a filling material with a bonding strength higher than the requirement is used in the region of a high negative moment, a uniform configuration of the longitudinal prestressing steels along thewhole span length of continuous composite bridges can be achieved, which would result in the simplification of the details and the reduction of the construction costs.

Evaluation of Effect of Rock Joints on Seismic Response of Tunnels (터널의 지진응답에 대한 암반 절리의 영향 평가)

  • Yoo, Jin-Kwon;Chang, Jaehoon;Park, Du-Hee;Sagong, Myung
    • Journal of the Korean Geotechnical Society
    • /
    • v.30 no.9
    • /
    • pp.41-55
    • /
    • 2014
  • In performing seismic analysis of tunnels, it is a common practice to ignore the rock joints and to assume that the rock mass surrounding the tunnel is continuous. The applicability of this assumption has not yet been validated in detail. This study performs a series of pseudo-static discrete element analyses to evaluate the effect of rock joint on the seismic response of tunnels. The parameters considered are joint intersection location, joint spacing, joint stiffness, joint dip, and interface stiffness. The results show that the joint stiffness has the most critical influence on the tunnel response. The tunnel response increases with the spacing, resulting in localized concentration of moment and shear stress. The response of the tunnel is the lowest for joints dipping at $45^{\circ}$. This is because large shear stresses result in rotation of the principal planes by $45^{\circ}$. In summary, the weathered and smooth, vertical or horizontal, and widely spaced joint set will significantly increase the tunnel response under seismic loading. The tunnel linings are shown to be most susceptible to damage due to induced shear stress, and therefore should be checked in the seismic design.

An Analysis on the Relation between Network Structure and Research Performance of Joint Researches in Accordance with the Matter of Supporting Research Funds: Focusing on the CT Area (연구비 지원 여부에 따른 공동연구의 네트워크구조와 연구성과 관계 분석: CT분야를 중심으로)

  • Kim, Minki;Kim, Donghyun;Cho, Keuntae
    • Journal of Technology Innovation
    • /
    • v.23 no.4
    • /
    • pp.63-87
    • /
    • 2015
  • As the important factors to improve research performance, the researchers' capacity and the input of resources like research funds have been pointed out. As joint researches are recently vitalized, however, the scientific knowledge is produced by forming continuous mutual relations through the structural characteristics between researchers. Since the support of research funds becomes a foothold to perform researches as multiple institutions cooperate with each other, it can be considered to have influence on research performance. In other words, it can be estimated that the support of research funds has influence on research performance by generating differences in the connecting structure of joint researches. In the results of analyzing the relation between network structure and research performance in accordance with the matter of supporting research funds, targeting the joint research theses in the culture technology(CT) area for five years from 2009 to 2013 in SCIE DB, when multiple research institutes are connected to each other, the number of thesis is increased. When the betweenness centrality is increased, the number of thesis is decreased. Also, the matter of supporting research funds has influence on network structure and research performance.

Spatiotemporal Analysis of Hippocampal Long Term Potentiation Using Independent Component Analysis

  • Kim, T.S.;Lee, J.J.;Hwang, S.J.;Lee, Y.K.;Park, J.H.
    • Journal of Biomedical Engineering Research
    • /
    • v.28 no.1
    • /
    • pp.17-23
    • /
    • 2007
  • Long-term potentiation (LTP) of synaptic transmission is the most widely studied model for learning and memory. However its mechanisms are not clearly elucidated and are a subject for intense investigation. Previous attempts to decipher cellular mechanisms and network properties involved a current-source density analysis (CSDA) of the LTP from small animal hippocampus measured with a limited number of microelectrodes (typically <3), only revealing limited nature of spatiotemporal dynamics. Recent advancement in multi-electrode array (MEA) technology allows continuous and simultaneous recordings of LTP with more than 60 electrodes. However CSDA via the standard Laplacian transform is still limited due to its relatively high sensitivity toward noise, inability of resolving overlapped current sources and sinks, and its requirement for tissue conductivity values. In this study, we propose a new methodology for improved CSDA. Independent component analysis and its joint use (i.e., Joint-ICA) are applied to extract spatiotemporal components of LTP. The results show that ICA and Joint-ICA are capable of extracting independent spatiotemporal components of LTP generators. The ICs of LTP indicate the reversing roles of current sources and sinks which are associated with LTP.

Estimation of the Roadbed Settlement and Bearing Capacity According to Radius of Curve and Cant in Railroad (철도의 곡선반경 및 캔트에 따른 노반의 침하 및 지지력 산정)

  • Jeon, Sang-Soo;Eum, Gi-Young;Kim, Jae-Min
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.7 no.1 s.24
    • /
    • pp.29-38
    • /
    • 2007
  • The research on the track performance and stability of the tilting-train was performed and the settlement of the roadbed was estimated as the tilting train was being operated on the rail joint under the allowable velocity subjected to the track performance and the stability of the tilting-train. Since the impact on the continuous welded rail (CWR) induced by the tilting-train loading is different from the impact on the rail joint, it needs to investigate the settlement of the roadbed beneath the CWR. In this study, when the tilting-train is being operated on the CWR under the allowable velocity subjected to the track performance and the stability of the tilting-train, the settlement and bearing capacity of the roadbed beneath the CWR have been evaluated using numerical analysis and compared with those beneath the rail joint. The numerical results show that the settlements of the roadbed beneath CWR and rail joint are amount to 71.2% and 88.8% of the allowable settlement, respectively. And the stresses are amount to 10.4% and 12.1% of the allowable bearing capacity, respectively.