• 제목/요약/키워드: continuous bridge

검색결과 553건 처리시간 0.021초

High Efficiency Design Considerations for the Self-Driven Synchronous Rectified Phase-Shifted Full-Bridge Converters of Server Power Systems

  • Cetin, Sevilay
    • Journal of Power Electronics
    • /
    • 제15권3호
    • /
    • pp.634-643
    • /
    • 2015
  • This paper presents a high frequency design approach for improving efficiency over a wide load range in the self-driven phase-shifted full-bridge converters for server power systems. In the proposed approach, a detailed ZVS analysis of the lagging leg switches in both the continuous conduction mode (CCM) and the discontinuous conduction mode (DCM) is presented. The optimum dead time and the determination of the appropriate operation mode are given for high efficiency according to the load conditions. Finally, the optimum operation conditions are defined to achieve a high-efficiency. A laboratory prototype operating at 80 kHz, rated 1 kW (12 V-83.3 A), is built to verify proposed theoretical analysis and evaluations. The experimental results show that the maximum efficiency is achieved as 95% and 83.5% at full load and 5% load conditions, respectively.

MR Damper의 준능동 퍼지제어이론을 이용한 교량구조물의 지진응답제어 (Seismic Response Control of Bridge Structures Using Semi-Active Fuzzy Control of MR Damper)

  • 박관순;고현무;옥승용;서충원
    • 한국지진공학회:학술대회논문집
    • /
    • 한국지진공학회 2002년도 춘계 학술발표회 논문집
    • /
    • pp.459-466
    • /
    • 2002
  • In this study magneto-rheological damper, a kind of semi-active device, is used to reduce the response of pier and girder of bridge structure subjected to seismic excitation and as a effective semi-active control method fuzzy control technique considering nonlinear behavior of the damper dynamics. By Numerical simulations of a nine span continuous bridge system subjected to various earthquakes, fuzzy control technique is compared with existing clipped optimal control technique in control performance which reduces displacement of pier and girder simultaneously. In the comparison of the control performance within a control force limit, it is confirmed that presented fuzzy control technique more efficiently reduce the pier and girder displacement than clipped optimal control technique based on optimal control theory.

  • PDF

프리스트레스트 합성상자형교의 거동 특성 (The Behavior of Prestressed Composite Box Girder)

  • 김주형;한택희;김종헌;강영종
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2001년도 가을 학술발표회 논문집
    • /
    • pp.591-596
    • /
    • 2001
  • In case of continuous steel box-girder bridges, the magnitude of the longitudinal tensile stress on concrete in internal support is larger than the tensile strength of concrete. In this paper, the parametric study was performed to present the effective magnitude of the longitudinal prestress for reducing the longitudinal tensile stress to decrease under the tensile strength of concrete. The parametric study is conducted with changing the steel box-girder section and the span length of bridge. Three dimensional finite element analyses are conducted with ABAQUS program. The behavior of the steel box-girder bridge with prestress is investigated through experimental works on a analogous steel box-girder bridge model, and their results are compared with those of analytical studies.

  • PDF

철근콘크리트 교량의 충격전달장치 앵커시스템의 전단파괴거동 (Shear Fracture Behavior of Anchor Systems for Shock Transmission Unit in RC Bridge)

  • 김태상;송하원;변근주;안창모
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2001년도 가을 학술발표회 논문집
    • /
    • pp.1097-1102
    • /
    • 2001
  • Seismic safety of continuous span concrete bridge can be enhanced by distributing a large seismic lateral load to each supporting pier. A new viscoelastic device called Shock Transmission Unit(STU), which is a simple cylinder-piston assembly packed with a so-called silicone putty compound, enables the lateral seismic load to be transmitted to the pier by installation of the device to movable bearings of the bridge. The seismic safety of concrete bridges having the STU depends on not only safety of the bridges globally but also safety of anchor systems which anchors the STU to concrete pier. An experimental investigation is performed to study the behavior of cast-in-place anchor and post-installed anchor subjected to shear load statically and cyclically according to different edge distance, embedment length, and anchor spacing. Finally, the experimental results are compared with results by design methods of ACI and CCD, and results by FEM analysis.

  • PDF

능동 클램프 풀브릿지 부스트 컨버터에 대한 모델링 및 분석 (Modeling and Analysis of Active-Clamp, Full-Bridge Boost Converter)

  • 김만고
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2004년도 전력전자학술대회 논문집(2)
    • /
    • pp.610-614
    • /
    • 2004
  • Recently, an active-clamp, full-bridge boost converter has been actively studied for high-power applications such as power factor correction and battery discharger. However, DC and AC modeling for this converter has not conquered. In this paper, a DC and small-signal AC modeling for the active-clamp, full-bridge boost converter is described. Based on the operation principle, the ac part of the converter can be replaced by a do counterpart. Then, a conceptual equivalent circuit is derived by rearranging the switches. The equivalent circuit for this converter consists of CCM (Continuous conduction mode) boost and DCM (Discontinuous conduction mode) buck converter. The analyses for the equivalent CCM boost and DCM buck converter are done using the model of PWM switch. The theoretical modeling results are confirmed through experiment or SIMPLIS simulation.

  • PDF

철도교량용 T-MAT형 신축이음장치 완제품 성능시험에 관한 연구 (A Study on Verification Test of T-MAT Type Expansion Joint for Railway Bridge)

  • 유문식;우윤수;김현묵;최종문;윤태양;이안호
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2003년도 추계학술대회 논문집(II)
    • /
    • pp.552-556
    • /
    • 2003
  • Expansion joint is the absorbing structure when the upper structure of bridge have the drying shrinkage and creep from the change of temperature or construction badness. Because it has the fatigue from continuous vehicles traffic. the durability and performance is verified by the static and dynamic loading test In this study. we make the decision that T-MAT type expansion joint is applied in railway bridge and the expansion joint was tested by the criterion of Korea High Speed Rail Construction Authority.

  • PDF

고속철도 교량/토공 접속부에서의 궤도 및 차량 거동 특성 (Characteristics of Track and Train Behaviors on High-Speed Railway Bridge/Earthwork Transiton Zone)

  • 이일화;강윤석;김은;손기준;박찬경
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2003년도 추계학술대회 논문집(II)
    • /
    • pp.129-134
    • /
    • 2003
  • It is very important to pay careful attention to construction of bridge/earthwork transition zone for high-speed railway. The transition zone of the railway is the section which roadbed stiffness is suddenly varied. Differences in stiffness have dynamic effects and these increase the forces in the track and the extent of deformation. An abrupt change of stiffness across two adjacent track portions cause irregular settlement of roadbed, track irregularity, lack of girder bending moment and reduction of lateral resistance. Especially on high-speed railway, track irregularity of transition zone cause sincere effect to track stability and train safety. And so continuous maintenance is needed. To verify this effect and to improve transiton zone capacity, In situ test, track irregularity and train acceleration test were performed on high-speed railway bridge/earthwork Transiton Zone.

  • PDF

종방향 활동체결구를 사용한 당산철교 장대레일화 사례 (CWR for Seoul Subway No 2 DangSan Bridge by ZLR (Zero Longitudinal Restraint))

  • 이덕영;공선용;권순섭;김은
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2003년도 추계학술대회 논문집(II)
    • /
    • pp.379-384
    • /
    • 2003
  • DangSan Bridge of Seoul Subway No 2 was rebuilt by safety reason. From Dec 1996 to Dec 1999 we were in charge of permanent way design of this rebuilt project. Especially we applied maintenance free system on the bridge by Cologne Egg alternative (ALT1) base plate and CWR (Continuous Welded Rail) by ZLR(Zero Longitudinal Restraint) for 125m (south approach section), 120m long(north approach section). This thesis generally introduce for CWR by ZLR which was first adapted CWR system in Korea.

  • PDF

Identification of beam crack using the dynamic response of a moving spring-mass unit

  • An, Ning;Xia, He;Zhan, Jiawang
    • Interaction and multiscale mechanics
    • /
    • 제3권4호
    • /
    • pp.321-331
    • /
    • 2010
  • A new technique is proposed for bridge structural damage detection based on spatial wavelet analysis of the time history obtained from vehicle body moving over the bridge, which is different from traditional detection techniques based on the bridge response. A simply-supported Bernoulli-Euler beam subjected to a moving spring-mass unit is established, with the crack in the beam simulated by modeling the cracked section as a rotational spring connecting two undamaged beam segments, and the equations of motion for the system is derived. By using the transfer matrix method, the natural frequencies and mode shapes of the cracked beam are determined. The responses of the beam and the moving spring-mass unit are obtained by modal decomposition theory. The continuous wavelet transform is calculated on the displacement time histories of the sprung-mass. The case study result shows that the damage location can be accurately determined and the method is effective.

호남고속철도 4-2공구 교량 계획 및 설계 (Planning and Design of Honam High-Speed Railroad's Bridges)

  • 배민혁;우동인;조현;안광수;한녹희
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.1470-1477
    • /
    • 2010
  • In 2004, Korea has become the world's fifth-express train states, Honam high-speed railroad which goes down another line with existing Kyoungbu high-speed railroad is divided 19 construction sectors, its total length is 230.9 km and it will be constructed by 2017. This site is located in Jeollabukdo Jeong-eup district along 9.38 km. There are three representative bridges. ;One is the PSC box girder bridge, another is the Extradosed bridge, and the other is the three continuous spans half-through hybrid arch bridge. This paper shows a planning and design of these bridges.

  • PDF