• Title/Summary/Keyword: construction-cost-calculation

Search Result 237, Processing Time 0.027 seconds

Elastoplastic FEM analysis of earthquake response for the field-bolt joints of a tower-crane mast

  • Ushio, Yoshitaka;Saruwatari, Tomoharu;Nagano, Yasuyuki
    • Advances in Computational Design
    • /
    • v.4 no.1
    • /
    • pp.53-72
    • /
    • 2019
  • Safety measures for tower cranes are extremely important among the seismic countermeasures at high-rise building construction sites. In particular, the collapse of a tower crane from a high position is a very serious catastrophe. An example of such an accident due to an earthquake is the case of the Taipei 101 Building (the author was the project director), which occurred on March 31, 2002. Failure of the bolted joints of the tower-crane mast was the direct cause of the collapse. Therefore, it is necessary to design for this eventuality and to take the necessary measures on construction sites. This can only be done by understanding the precise dynamic behavior of mast joints during an earthquake. Consequently, we created a new hybrid-element model (using beam, shell, and solid elements) that not only expressed the detailed behavior of the site joints of a tower-crane mast during an earthquake but also suppressed any increase in the total calculation time and revealed its behavior through computer simulations. Using the proposed structural model and simulation method, effective information for designing safe joints during earthquakes can be provided by considering workability (control of the bolt pretension axial force and other factors) and less construction cost. Notably, this analysis showed that the joint behavior of the initial pretension axial force of a bolt is considerably reduced after the axial force of the bolt exceeds the yield strength. A maximum decrease of 50% in the initial pretension axial force under the El Centro N-S Wave ($v_{max}=100cm/s$) was observed. Furthermore, this method can be applied to analyze the seismic responses of general temporary structures in construction sites.

An Essay on the Possibility of New Seoul International Airport as a Regional Hub (신공항(新空港)의 허브공항화(空港化)에 관한 소고(小考))

  • Kim, Jong-Seok
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.5
    • /
    • pp.303-320
    • /
    • 1993
  • The construction of New Seoul International Airport is under way despite much controversy. Among much discussed, but not well-formulated controversy is the possibility of the airport as a hub in the North Asia Region. This paper specifies the factors which render it possible for an airport to be a regional hub. Then each factor is applied to the new airport to see whether it can function as a hub airport. Also examined is the qualitative cost and benefit calculation related to the hub function. The usual discussion has missed one big point of cost side of hub function in the belief that the hub only produces benefits to the national economy where the airline and airport industry belong; earlier-than-expected congestion and the necessity to expand the airport sufficiently enough to accommodate the increasing air demand. An airport as a hub is determined by several factors; geographical location ; economic status of the country where the airport belongs ; bilateral air service agreements according to which the airlines can exercise the route rights; the airport charges which directly influence the cost structure of the carriers ; international aviation and airport related policies of each country in the region ; airport capacity etc. The tentative implications of this paper are the followings; first, the new airport is able to function as a regional hub in the transpacific routes which connect Asian countries and North America. That is, directional hubbing by the airlines is implicated; second, the main benefits may be accrued to american airlines exercising all the route rights in the Asian region; third, the governmental effort to make the new airport a regional hub must take caution in optimizing the hubbing level (% of transitting passengers and freight) between the benefits and the costs. Further Studies may include optimal level of hubbing for the new airport and, quantification of the impact of the new airport on the national economy depending on the degree of hubbing.

  • PDF

Analysis of Impact on ERP Customization Module Using CSR Data

  • Yoo, Byung-Keun;Kim, Seung-Hee
    • Journal of Information Processing Systems
    • /
    • v.17 no.3
    • /
    • pp.473-488
    • /
    • 2021
  • The enterprise resource planning (ERP) system is a standardized and advanced business process that many companies are implementing now-a-days through customization. However, it affects the efficiency of operations as these customizations are based on uniqueness. In this study, we analyzed the impact of customized modules and processing time on customer service request (CSR), by utilizing the stacked CSR data during the construction and operation of ERP, focusing on small and medium-sized enterprises (SMEs). As a result, a positive correlation was found between unit companies and the length of ERP implementation; ERP modules and the length of ERP implementation; ERP modules and unit companies; and the type of ERP implementation and ERP module. In terms of CSR, a comparison of CSR processing time of CBO (customized business object) module and STD (standard) module revealed that while the five modules did not display statistically significant differences, one module demonstrated a statistically very significant difference. In sum, the analysis indicates that the CBO-type CSR and its processing cost are higher than those of STD-type CSR. These results indicate that companies planning to implement an ERP system should consider the ERP module and their customization ratio and level. It not only gives the theoretical validity that should be considered as an indicator for decision making when ERP is constructed, but also its implications on the impact of processing time suggesting that the maintenance costs and project scheduling of ERP software must also be considered. This study is the first to present the degree of impact on the operation and maintenance of customized modules based on actual data and can provide a theoretical basis for applying SW change ratio in the cost estimation of ERP system maintenance.

Road Maintenance Planning with Traffic Demand Forecasting (장래교통수요예측을 고려한 도로 유지관리 방안)

  • Kim, Jeongmin;Choi, Seunghyun;Do, Myungsik;Han, Daeseok
    • International Journal of Highway Engineering
    • /
    • v.18 no.3
    • /
    • pp.47-57
    • /
    • 2016
  • PURPOSES : This study aims to examine the differences between the existing traffic demand forecasting method and the traffic demand forecasting method considering future regional development plans and new road construction and expansion plans using a four-step traffic demand forecast for a more objective and sophisticated national highway maintenance. This study ultimately aims to present future pavement deterioration and budget forecasting planning based on the examination. METHODS : This study used the latest data offered by the Korea Transport Data Base (KTDB) as the basic data for demand forecast. The analysis scope was set using the Daejeon Metropolitan City's O/D and network data. This study used a traffic demand program called TransCad, and performed a traffic assignment by vehicle type through the application of a user equilibrium-based multi-class assignment technique. This study forecasted future traffic demand by verifying whether or not a realistic traffic pattern was expressed similarly by undertaking a calibration process. This study performed a life cycle cost analysis based on traffic using the forecasted future demand or existing past pattern, or by assuming the constant traffic demand. The maintenance criteria were decided according to equivalent single axle loads (ESAL). The maintenance period in the concerned section was calculated in this study. This study also computed the maintenance costs using a construction method by applying the maintenance criteria considering the ESAL. The road user costs were calculated by using the user cost calculation logic applied to the Korean Pavement Management System, which is the existing study outcome. RESULTS : This study ascertained that the increase and decrease of traffic occurred in the concerned section according to the future development plans. Furthermore, there were differences from demand forecasting that did not consider the development plans. Realistic and accurate demand forecasting supported an optimized decision making that efficiently assigns maintenance costs, and can be used as very important basic information for maintenance decision making. CONCLUSIONS : Therefore, decision making for a more efficient and sophisticated road management than the method assuming future traffic can be expected to be the same as the existing pattern or steady traffic demand. The reflection of a reliable forecasting of the future traffic demand to life cycle cost analysis (LCCA) can be a very vital factor because many studies are generally performed without considering the future traffic demand or with an analysis through setting a scenario upon LCCA within a pavement management system.

Developing An Automatic System for Quantity Taking-off Cut and Bent Re-Bar and Making a Placing Drawing (가공철근 물량산출 및 배근시공상세도 작성시스템 개발)

  • Park, Hyeon-Yong;Lee, Seung-Hyun;Kang, Tai-Kyung;Lee, Yoo-Sub
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.358-363
    • /
    • 2007
  • Reinforcing steel work plays an important role in terms of its structural performance or weight of construction cost for reinforced concrete structures. Precise estimation of re-bar quantity gives a basis for managing the reinforcing steel work effectively. However, the estimation process is still performed ineffectively based upon the expert's experience or manpower in spite of the advanced technology or improvement efforts. Therefore, the purpose of this research is to develop a prototype system for taking-off the quantity of reinforcing steel bars quickly and accurately in an order consistent with the specific members identified on the drawings. An estimate algorithm considering the connection, settlement and coating thickness of re-bars was suggested regarding to their replacement conditions which places more emphasis on constructibility. Also, this system produces the shop drawings automatically with the calculation results.

  • PDF

A Study on Calculation of Interior Construction Area Using 3D Modeling Program (3D 모델링 프로그램을 활용한 인테리어 공사면적 산출에 대한 연구)

  • Ha, Seung-Beom
    • The Journal of the Convergence on Culture Technology
    • /
    • v.9 no.1
    • /
    • pp.531-537
    • /
    • 2023
  • Interior construction is required to estimate the quantity of material and the cost expected from 2D drawing in design phase and look for the reasonable method of work. Therefore, exact estimation for quantity and budgeting are very important processes, as a measure of judging the profitability of interior construction. These processes are mostly based on 2D drawing, so time and experienced staff are required. Error and omission can occur because the experienced staff also calculates the area using 2D based drawing. Interior market is currently based on 3D modeling from planning to final design. Accordingly, estimating quantity based on 3D modeling is emerging as a way of reducing error and omission. This paper will present the methodology on calculating area, the basic element of estimating quantity based on 3D Modeling in interior field.

A study on the normal project duration development for the construction of multi-utility tunnel in the existing city (기존시가지의 공동구 건설을 위한 표준공기 산정에 대한 연구)

  • Lee, Seong-Won;Lee, Pil-Yoon;Byun, Yo-Seph;Cho, Choong-Yeun;Lee, Min-jae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.677-685
    • /
    • 2018
  • In construction, schedule management is the basic but important step, for the effective schedule management, the preparation of the reasonable schedule table should be prioritized. In the design stage, the optimal construction period can be selected through comparison of various conditions and construction methods considering weather conditions and site characteristics. But, At the planning phase, it is difficult to select the effective method and calculate the proper construction period by the basic data(D/B) analysis. In this paper, the construction method considering characteristics of each type and conditions of existing city was selected. For the reasonable duration calculation, we analyzed the unit schedule for RC method for open type and Shield TBM method for tunnel type. The normal project duration of construction assuming of 1,200m of extension and every 200m of ventilation was prepared by integrating each unit schedule. It was analyzed that it took 893 days for the open type and 616 days for the tunnel type. The results of this study will help to make type selection and normal project duration more easily in the planning phase. If it is linked to the design stage, it will be easy to estimate the process and construction cost.

Estimation of Optimum Capacity for Rainwater Storage Facilities based on Mass Balance and Economic Analysis (Mass-balance 및 경제성 분석에 의한 빗물저류시설 적정 규모 산정)

  • Kim, Youngmin;Lee, Sangho;Lee, Jung-Hun;Kim, Ree-Ho
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.22 no.2
    • /
    • pp.233-238
    • /
    • 2008
  • Recently, rainwater harvesting facilities have increasingly constructed mainly in elementary schools and government buildings. Nevertheless, few methods are available for efficient planning and design of rainwater harvesting facilities by considering the weather conditions and purpose of rainwater management in each site, which may lead to a construction of uneconomic facilities. The current method estimates the size of rainwater storage tank by multiplying the size of building or plottage with a certain ratio and has many limitations. In this study, we first developed a method for planning and design of rainwater storage facilities using $Rainstock^{TM}$ model, which is based on mass balance, and economic analysis. Then, the model was applied for the design of a rainwater harvesting facility in a building with the catchment area of $1,000m^2$. The model calculation indicated that the economic feasibility of rainwater harvesting depends on not only the size of storage tank but also the water usage rate. When the water usage rate is $1m^3/day$, the rainwater harvesting facility is not cost-effective regardless of the size of the storage tank. With increasing the water usage rate, the economical efficiency of the facility was improved for a specific size of the storage tank. Based on the model calculation, the optimum tank sizes for $5m^3/day$ and $10m^3/day$ of water usage rates were $24m^3$ and $57m^3$, respectively. It is expected that the model is useful for optimization of rainwater storage facilities in planning and designing steps.

Development of On-site Heat Loss Audit and Energy Consulting System for Greenhouse

  • Kwon, Jin Kyung;Kang, Geum Choon;Lee, Seong Hyun;Sung, Je Hoon;Yun, Nam Kyu;Moon, Jong Pil;Lee, Su Jang
    • Journal of Biosystems Engineering
    • /
    • v.38 no.4
    • /
    • pp.287-294
    • /
    • 2013
  • Purpose: Greenhouses for a protected horticulture covered with a plastic or glass are easy to have weakness in a heat loss by deterioration, damage, poor construction, and so on. To grasp the vulnerable points of heat loss of the greenhouses is important for heating energy saving. In this study, an on-site heat loss audit and energy consulting system were developed for an efficient energy usage of a greenhouse. Method: Developed system was mounted with infrared thermal and visual cameras to grasp the heat loss from the greenhouse quickly and exactly, and a trial calculation program of heating load of greenhouse to provide farmers with the information of heating energy usage. Results: Developed system could print out the reports about the locations and causes of the heat losses and improvement methods made up by an operator. The mounted trial calculation program could print out the information of the period heating load and fuel cost according to the conditions of greenhouse and cultivation. The program also mounted the databases of the information on the 13 horticultural energy saving technologies developed by the Korea Rural Development Administration and simple economic analysis sub-program to predict the payback period of the technologies. Conclusion: The developed system was expected to be used as the basic equipment for an instructors of district Agricultural Technology and Extension Centers to conduct the energy consulting service for the farmers within the jurisdiction.

Calculation of the Coefficient of Artificial Reef According to the Coefficient of Volume (체적계수에 따른 인공어초 계수산정)

  • Kim, Young Jong;Choi, Hyun
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.18 no.9
    • /
    • pp.2307-2312
    • /
    • 2014
  • Artificial reef refers to various structures that facility to construction field format and spawning of marine organisms, sea ranch, forest of the sea, and sea jungle artificially in water, Build a production stable base of marine products, thereby contributing to an increase in the income of fishermen. In the management of an artificial reef, the calculation of the number of square reefs may be that it is a method to perform the submersible is an important part of maintenance is correct. However, cost and diving personnel, depending on the diving situation, there is a difficult thing to implement to coast across the country. Therefore, In this study, We calculated the volume using the multi-beam Echo Sounder and side scan sonar for the reefs of the rectangle are the existing installation. And proposes the improvement of the estimation in accordance with the volume coefficient reef.