• Title/Summary/Keyword: construction-cost-calculation

Search Result 237, Processing Time 0.024 seconds

A Study on the Revision of Man-day Cost Calculation Method for Information and Communication Facilities Construction Supervision (정보통신설비공사 감리대가 품셈개정에 관한 연구)

  • Lee, Jin-Ho;Kang, Byeong-Gwon
    • Journal of Convergence for Information Technology
    • /
    • v.10 no.2
    • /
    • pp.1-8
    • /
    • 2020
  • The standardized procurement of supervisory cost for the construction of domestic Information and Communication Technology(ICT) facilities, which is announced by the Korea Engineering and Construction Association in May 2009, has been applied in the public institutions and private industries. However, the previous standardized procurement is not widely applied in recent years because the ICT and social economic environment have been rapidly changed and the previous equations to calculate the supervisory cost is not simplified. As results, the needs for a new standardized procurement has been increased and the Ministry of Industry, Commerce and Energy has published a notice with new standard procurement. In this paper, we provide the explanation of the background and the derivation process of the notice based on authors' experiences of project participation. As research method, we compare the previous mad-day cost of ICT construction and that of another area including electric facility construction, and then we explain a new procurement equation based on WBS(Work Breakdown Structure).

Analysis of Factors for Improvement of Economic Feasibility of Construction Cost to Spread Application of OSC Construction Method for Apartment Housing (공동주택 OSC공법 적용 확산을 위한 공사비 분야 경제성 개선 요인 분석 - PC 부재 설계, 제작, 운송, 시공을 중심으로 -)

  • Yun, WonGun;Shin, Eun-Young;Kang, Tai-Kyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.55-63
    • /
    • 2021
  • Recently, as the problem of the traditional on-site labor-intensive construction production method has been raised due to changes in construction work labor and site conditions, the OSC method is gradually spreading as an alternative to this. Even in apartment houses, the application of the PC method is expanding centered on the underground parking lot, but the high cost structure is a problem compared to the conventional formwork method. In this study, factors affecting the calculation of construction cost in the economic evaluation, which are the core of determining the construction method for apartment buildings, are derived through domestic and foreign literature review and expert advice, the importance was analyzed through an opinion survey targeting industry experts. The measures to reduce construction cost were mainly derived from the improvement of the design and manufacturing process. It is expected that the factors affecting the construction cost and improvement measures of the PC method derived from this study will serve as a direction for technology development to spread the application of the PC method for apartment houses in the future.

A Case Study on the Calculation of Delay Damages for Contractors according to the Extension of Contract Period (계약기간 연장에 따른 시공자의 손실비용 산정에 관한 사례 연구.)

  • Lee Gi-Han;Kim Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.305-310
    • /
    • 2001
  • The purpose of this study is to calculate delay damages for contractors. The study has been performed by investigation of delay cost occurrence status and the analysis of subway construction cases. The results of this study are as follows: 1. Delay cost( 1day) equivalent to $0.005\%$ of total construction cost by analysis case studies. 2. Including bank interest, dealy cost is analysed as the following; $1.1\~9.2\%$ of total construction cost in part extension period, $3.3\~11.0\%$ of total construction cost in total extension period. 3. In comparison between liquidated damages and delay cost, liquidated damages account for average 20.1 times of delay costs. 4. Acceleration cost will be calculate on the basis of delay cost calculation method. In the result of this method, acceleration cost is equal to delay cost at least or must be large than delay cost

  • PDF

Information System for Managing Cost Reimbursable Construction Projects (실비정산 비용지불 방식에 적용 가능한 건설 프로젝트 정보관리 시스템)

  • Kang, Namhee;Song, Hojeong;Kim, Hyunjung;Choi, Jaehyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.2
    • /
    • pp.237-247
    • /
    • 2015
  • The project management information system (PMIS) has recently been developed by using the information technology(IT) in order to implement advanced information management technology to construction industry in Korea. The PMIS has been applied not only to domestic construction projects, but also to some overseas projects executed by Korean construction companies. This study was performed to develop the PMIS that is tailored to the US construction IT market. It has been monopolized by the US-based IT companies, but other companies are recently emerging with competitive technology and market strategy. As a preceding study, existing commercially available systems were analyzed, and the required features of the PMIS were identified by analyzing the core elements of contract, process and cost management about construction projects in the US. Then, the PMIS was developed based on the aforementioned analysis results. The system includes the document management module with an internal electronic approval system, the cost-plus-based automatic labor cost calculation module, and the progress management module to support the integrated project cost management. In addition, the functionality of the developed system was verified by experts about construction management in the US via questionnaire survey. The developed PMIS, in this study, is expected to be applied not only to the US construction IT market as a system specialized for the US construction industry, but also to other oversea markets in the future.

A Liquidated Damages Calculation Method Based on Owner's Substantial Loss (발주자 손실기반 지체상금 산정 개선방안)

  • Jang, Bong-Jo;Shim, Jae-Young;Koo, Jeong-San;Jung, Dae-Won;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.150-158
    • /
    • 2007
  • The delay of construction is one of the most frequent and complicated elements of the claim. And the liquidated damages cause many disputes during the judgement. The liquidated damages should be a compensation for owner's substantial loss, but actually be applied as a damage for breach of contract. These damages are different from owner's loss and give constructors a excessive burden. So we need a more reasonable system than a lump application system. In this study, we make a Improvement System, that based on owner's substantial loss, and suggest the new liquidated damages calculation method.

A Study on Material Requirement Planning by Integrating Schedule and Cost (비용$\cdot$일정 통합관리를 이용한 자원소요계획에 관한 연구)

  • Song Young-Woong;Choi Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.1 s.13
    • /
    • pp.106-113
    • /
    • 2003
  • In this study, The matrix method was used with common category concept according to the construction project control system. For the purpose of systematic resource management planning, it should be established on accomplished EVM data for clearing the ordering point according to the attribute procurement analysis. Resource management was presented by connecting the material requirement calculation method and the attribute of procurement method based on the EVM, suggested through analyzing process-data modeling using integrated schedule, cost and material.

Optimal location of Batcher Plant using Modified Steiner point (수정된 Steiner Point를 이용한 Batcher Plant의 최적 위치 선정)

  • Ha, Kwon-Yeol;Lee, Sang-Joong
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.10
    • /
    • pp.39-46
    • /
    • 2015
  • REMICON(Ready Mixed Concrete), the most essential material of construction work, is produced from facility called "Batcher plant." In order to produce Remicon, Batcher Plant needs to be supplied with basic raw material such as ballast, sand, cement, admixture and water. In remicon industry, overland transport vehicles are used during the whole manufacturing process from producing to infilling at the construction site. Thus, the transportation cost sums up be to 20 percent of whole manufacturing cost and transport capacity and distance travelled have direct and major effect on manufacturing costs. This paper suggests a method to find optimal location of batcher plant using modified Steiner point, suggesting the most effective and flexible connection through among construction site, aggregate, cement and remicon producing plant. This paper also proposes reducing of transport cost at maximum 60% by calculation through optimized plant location. The modified Steiner point theory proposed in this paper also can be applied to optimal location of a $2^{ry}$ substation or MCC panel for minimizing of power loss, voltage drop, line distance and etc.

An Awareness Analysis on the Design for Safety of Construction Project and Its Improvement Measures (건설프로젝트의 설계안전성 검토에 대한 인식 분석 및 개선방안)

  • Shin, Won-Sang;Son, Chang-Baek
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.4
    • /
    • pp.351-359
    • /
    • 2019
  • Recognizing that the fundamental cause of construction safety accidents was a lack of safety management activities in the planning and design phases, the government made the Design for Safety (DFS) system mandatory in May 2016. However, awareness among ordering parties and designers regarding this system is significantly low, and the system has not been properly established due to reasons such as the need for additional work and a lack of professional manpower. In this study, the awareness of ordering parties and designers of the DFS system was analyzed through a survey, various problems in DFS work execution were identified and measures for improvement were presented. Measures to improve the efficiency in DFS work execution involve the discovery of risk factors and establishment of countermeasures, and here the establishment of a DFS work support system that enables the sharing of information between institutions is the most urgent priority. In addition, it is also urgently necessary to establish a dedicated organization in charge of DFS work, cultivate professional manpower, develop the relevant education programs and establish a proper cost calculation standard for DFS work execution by design offices.

A Measure for Improving the Systematic Evaluation of the Life Cycle Cost in Technical Proposal Tendering (기술제안입찰에서의 계적인 생애주기비용 평가를 위한 개선방안)

  • Son, Myung-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.71-83
    • /
    • 2012
  • The use of technical proposal tendering has been expanding recently with the aim of effecting cost reduction, quality enhancement, technological development and value realization centered on multifunctional administrative cities, innovation cities, and the Yongsan relocation project. In line with the increasing interest towards life cycle cost improvement measures as an important evaluation category concerning technical proposal tendering, efforts in preparing measures that can execute the security of credibility and objective evaluation concerning architectural life cycle cost are being made. However, problems such as lack of applicable cases of design development and detail design, distortion of initial construction costs concerning the original plan, combination of constant price and current price, the ambiguity of the calculation standards between tendering corporations, inaccuracy of terms, and insufficient compositional formats concerning life cycle improvement measures are being cited. Accordingly, this study sought to propose a measure to improve the compositional guidelines, format, and standards so that a systematic life cycle cost evaluation can be executed for the reliable distinction of each participating corporation, enhanced credibility and objective evaluation of the life cycle cost improvement measure for technical proposals.

Analysis of Excavation Speed and Direct Construction Cost Based on the Operating Productivities of TBM Method Site - Diameter 5.0m Target (수로터널공사의 효율성 분석을 통한 굴진속도 및 직접공사비 분석 - 구경 5.0m 중심으로)

  • Park, Hong Tae;Lee, Yang Kyu
    • Journal of the Society of Disaster Information
    • /
    • v.8 no.4
    • /
    • pp.328-335
    • /
    • 2012
  • The resource-based estimating based on standard unit price of construction work was estimated by multiplying the price per standard unit of work on the amount of labor, material, equipment use time. However, limitation of the resource-based estimating way does not adequately reflect the actual transactions prices. On the subject of water tunnel excavation as a new attempt to overcome these limitations, this study analyzed productivity by work type into cutter inspection/ exchange, TBM maintenance, TBM inspection/refueling, subsequent installations, tramcar, operating change, a cave-underground reinforcement / rock reinforcement, safety / meetings and analyzed actual cost estimating and the net advance rate based on this analysis result. Actual cost estimating calculation approach presented in this study can be utilized as a useful tool to predict the actual cost estimating in the TBM water tunnels field.