• 제목/요약/키워드: construction-based

검색결과 14,360건 처리시간 0.042초

ENHANCEMENT OF AVAILABILITY OF 4D SIMULATION BASED ON BUILDING INFORMATION MODEL TECHNOLOGY

  • Jong Jin Park;Eon Yong Kim;Hyun Cho;Han Jong Jun
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.579-586
    • /
    • 2009
  • 4D simulation integrates the 3 dimensional model of a building with the construction schedule, and it leads to the possibility of virtually checking the construction process and the building itself in advance. However, the existing problem of 4D simulation is the difference between the demands of architects, engineers, and construction site workers in 4D simulation. This study suggests the possible way to enhance the availability of 4D simulation, considering more the practical demands from the construction site. In order to conduct this study, we build a 3D BIM model of a business-residential complex and link the model with the pre-defined construction schedule in order to make a 4D simulation. This study concludes with the optimized 4D simulation methodology based on BIM model considering the demands in perspective of the construction site. It would contribute to the harmonic collaboration among architects, engineers, and labors in the construction site when using 4D simulation based on BIM model.

  • PDF

IoT 기반의 건설현장 미세먼지 모니터링 시스템 개발에 관한 연구 (Particulate Matter Monitoring System Based on IoT for Construction Sites)

  • 김현식;태성호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 가을 학술논문 발표대회
    • /
    • pp.40-41
    • /
    • 2021
  • Recently, particulate matter(PM) caused by internal factors such as industrialization and urbanization as well as external factors such as Asian dust is a serious problem in Korea. In particular, while the emission due to construction appears to be very serious among the internal factors, it is necessary to manage PM in consideration of the characteristics of construction sites. Accordingly, in this study, a PM management system suitable for construction sites was developed to reduce civil complaints caused by PM and to minimize damage to field workers and nearby residents by supporting the fine dust management system of the state and local governments. The factors to be considered when measuring PM due to the specificity of construction sites were considered, and the system components were developed based on the considerations. As a result, an IoT based construction site PM monitoring system (CPMS) that integrates each component was established.

  • PDF

Robust Real-time Object Detection on Construction Sites Using Integral Channel Features

  • Kim, Jinwoo;Chi, Seokho
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.304-309
    • /
    • 2015
  • On construction sites, it is important to monitor the performance of construction equipment and workers to achieve successful construction project management; especially, vision-based detection methods have advantages for the real-time site data collection for safety and productivity analyses. Although many researchers developed vision-based detection methods with acceptable performance, there are still limitations to be addressed: 1) sensitiveness to the shape and appearance changes of moving objects in difference working postures, and 2) high computation time. To deal with the limitations, this paper proposes a detection algorithm of construction equipment based on Integral Channel Features. For validation, 16,850 frames of video streams were recorded and analyzed. The results showed that the proposed method worked in high performance in terms of accuracy and processing time. In conclusion, the developed method can help to understand useful site information including working pattern, working time and input manpower analyses.

  • PDF

How Much Discrepancy Can Happen from BIM-based Quantity Take?

  • Kim, Seong-Ah;Chin, Sangyoon
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.263-267
    • /
    • 2015
  • Stakeholders of a construction project expect cost savings through fast and accurate cost analysis by performing BIM-based quantity take-off (BQT). However, authors have observed that there can be discrepancies in the results of BQT depending on the level of development (LOD) and modeling methods. In addition, since quantity take-off methods are different depending on the construction work items, the combination of LOD, modeling methods of BIM, features of construction work items can cause serious overestimate or underestimate in BQT results. It is necessary to identify what kind of problems can happen and how those problems can be avoided in various construction work items, since the discrepancy of quantity take-off results has great impact on not only cost analysis but also the determination of contract amount and it can cause claims, poor construction quality, cost overruns, and many others later in the construction project. Therefore, this paper focuses the identification of issues and problems of BQT at each construction work item level based on two categorizations of structural works and interior works.

  • PDF

Optimal Implementation Strategies of Building Information Modeling for Construction Projects of LH

  • Lee, Ji-Eun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.60-62
    • /
    • 2015
  • The BIM-based architectural design can be the optimal method to improve all sectors of construction industry and reduce environmental impact through digital technologies. The goals and effects of BIM needs in LH to be newly planned based on the experience of public sectors, which will ultimately contribute to maximization of effectiveness. Referring the excellent case in the UK, the current BIM standards according to maturity level 2 handle the contents related to modeling, collaborative data production, data management and assure BIM data have to be used from building construction to operation and maintenance of buildings. Therefore the strategy for the utilization of BIM for construction projects in LH consisted of three steps; first, the minimization of defects via BIM: second, strengthening the competitiveness of construction and asset management: third, upgrading the system of building production and maintenance control. After this trial, LH can accumulate know-how for building construction to be more costeffective and competitive.

  • PDF

팀기반학습 기반 건축시공 하이브리드 교육과정 도입방안 (Introduction of Team-Based Learning Based Building Construction Hybrid Curriculum)

  • 김재엽
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.351-352
    • /
    • 2023
  • In order to respond to changes in the industrial environment such as the 4th industrial revolution, university education also needs active educational innovation efforts. This study proposed a construction construction hybrid curriculum that can actively utilize online education in the direction of educational innovation in domestic universities. The hybrid curriculum was based on online learning through lecture videos used in team-based learning. The hybrid curriculum additionally allows learners to choose their learning methods. In a hybrid class, learners can choose the class participation method they want from offline classroom or online real-time. Hybrid classes are considered to strengthen learners' options and take a step forward in learner-centered education.

  • PDF

Enhancing Occlusion Robustness for Vision-based Construction Worker Detection Using Data Augmentation

  • Kim, Yoojun;Kim, Hyunjun;Sim, Sunghan;Ham, Youngjib
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.904-911
    • /
    • 2022
  • Occlusion is one of the most challenging problems for computer vision-based construction monitoring. Due to the intrinsic dynamics of construction scenes, vision-based technologies inevitably suffer from occlusions. Previous researchers have proposed the occlusion handling methods by leveraging the prior information from the sequential images. However, these methods cannot be employed for construction object detection in non-sequential images. As an alternative occlusion handling method, this study proposes a data augmentation-based framework that can enhance the detection performance under occlusions. The proposed approach is specially designed for rebar occlusions, the distinctive type of occlusions frequently happen during construction worker detection. In the proposed method, the artificial rebars are synthetically generated to emulate possible rebar occlusions in construction sites. In this regard, the proposed method enables the model to train a variety of occluded images, thereby improving the detection performance without requiring sequential information. The effectiveness of the proposed method is validated by showing that the proposed method outperforms the baseline model without augmentation. The outcomes demonstrate the great potential of the data augmentation techniques for occlusion handling that can be readily applied to typical object detectors without changing their model architecture.

  • PDF

An Agent-Based Framework for Investigating Safety-Productivity Tradeoff of Construction Laborers Considering Risk-taking Behavioral Heterogeneity

  • Khodabandelu, Ali;Park, JeeWoong;Kheyrandish, Seyedmohsen
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.1114-1121
    • /
    • 2022
  • Construction laborers and crews play a critical role in achieving a safe and productive construction site. Many past research studies used top-down approaches/perspectives for studying the impact of laborers' performance on overall construction site outputs with limited flexibility in accounting for laborers' various characteristics. However, the recent reap in computational advances allowed applications of bottom-up architectures, which can potentially incorporate heterogeneous characteristics of laborers' individual behavioral and decision-making features effectively. Accordingly, agent-based modeling (ABM), as a tool to leverage a bottom-up methodological approach, has been widely adopted by recent research. Existing literature investigated the influence of changes in laborers' behaviors and interactions on either construction sites' safety performance or productivity performance individually, leaving the tradeoff between safety and productivity in this context relatively unexplored. Accordingly, this study aims to develop an agent-based framework to study the tradeoff between project safety and productivity performances resulting from changes in laborers' behaviors after attending safety trainings. Our findings via simulations indicate that proper safety trainings can improve safety performance without negatively impacting productivity performance.

  • PDF

실적공사비가 적용된 제주도 도로공사의 물가변동률 영향 분석 (Analysis of Road Construction Projects' Escalation under Historical Data-Based Estimate System in Jeju)

  • 홍정호;이동욱
    • 대한토목학회논문집
    • /
    • 제34권2호
    • /
    • pp.667-676
    • /
    • 2014
  • 본 연구는 제주특별자치도 내 실적공사비가 적용된 도로현장을 중심으로 물가변동에 따른 실적공사비 등락률 산정의 문제점을 분석하기 위하여 실시되었다. 본 연구를 위하여 제주특별자치도 내 9개 도로공사 현장을 중심으로 실적공사비방식, 표준품셈방식, 건설공사비지수방식에 따른 등락률을 비교 분석하였다. 분석결과 9개 현장 중 약 56%인 5개 현장에서 실적공사비의 지수조정률이 표준품셈과 건설공사비지수의 지수조정률에 비해 낮게 산정되었다. 이는 실적공사비가 적용됨에 따라 물가변동으로 인한 계약금액 조정 성립요건이 지연되고 있다는 것을 알 수 있으며, 이에 따라 공사 준공 전 물가변동으로 인한 계약금액 조정횟수의 감소와 함께 물가변동금액 역시 차이를 보일 수 있음을 의미한다. 또한, 건설공사비지수 사례분석 결과, 도로부문에 대한 지수를 적용하여 지수조정률을 산출하였으나 지수조정률이 2.0%~9.4%까지 산정되어 이는 공사금액 및 물가변동 적용시기에 따라 상당한 영향을 미치는 문제점이 나타났다.

Database Program for Managing Management Resources: General Contractor's Perspectives

  • Yong-Woo Kim;Sungwon Shin
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1100-1106
    • /
    • 2009
  • General contractors' overhead costs are increasing relative to direct costs. However, it is difficult to apply the traditional activity-based costing directly to the construction site overhead costing because the resource consumption rate per each activity is varied depending on the attributes of activities. The research develops a methodology of hybrid cost allocation system when resources are assigned to cost objects unlike the traditional activity-based costing. The study also develops a database program and demonstrates how it can be applied to the construction projects using a case study.

  • PDF