• Title/Summary/Keyword: construction works

Search Result 1,807, Processing Time 0.028 seconds

A Study on the Derivation of Key Management Works by Construction Progress through the Analysis of Construction Supervision Data (건설감리 검측데이터 분석을 통한 공사 진행도별 중점관리공종 도출)

  • Yoo, Na-yeong;Kim, Ha-neul;Kim, Ha-rim;Cho, Hun-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.131-132
    • /
    • 2022
  • The type and proportion of construction work varies depending on the stage of progress, and the frequency of inspection and defect occurrences are different. If it is determined to be defective after the inspection, a delay may occur, and additional manpower and resources are required. Therefore, it is necessary to prevent these risks by classifying, deriving, and managing key management woks according to the progress. This study aims to contribute to the efficiency of the supervisor's inspection work by identifying the types of construction that should be managed intensively for each construction progress and deriving the time when defects occur frequently in each construction type.

  • PDF

How Much Discrepancy Can Happen from BIM-based Quantity Take?

  • Kim, Seong-Ah;Chin, Sangyoon
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.263-267
    • /
    • 2015
  • Stakeholders of a construction project expect cost savings through fast and accurate cost analysis by performing BIM-based quantity take-off (BQT). However, authors have observed that there can be discrepancies in the results of BQT depending on the level of development (LOD) and modeling methods. In addition, since quantity take-off methods are different depending on the construction work items, the combination of LOD, modeling methods of BIM, features of construction work items can cause serious overestimate or underestimate in BQT results. It is necessary to identify what kind of problems can happen and how those problems can be avoided in various construction work items, since the discrepancy of quantity take-off results has great impact on not only cost analysis but also the determination of contract amount and it can cause claims, poor construction quality, cost overruns, and many others later in the construction project. Therefore, this paper focuses the identification of issues and problems of BQT at each construction work item level based on two categorizations of structural works and interior works.

  • PDF

A Suggestion on the Improvement of the Business Classification System Considering the Specialty of the Painting Work, Landscaping Construction Industry (전문건설업 대업종화 적용에 있어 도장, 조경공사의 특수성을 고려한 업종분류체계의 제안)

  • Kim, Jeong-wook;Kim, Gyu-yong;Choi, Min-soo;Nam, Jeong-soo;Lee, Sang-soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.5
    • /
    • pp.497-506
    • /
    • 2022
  • In recent years, the specialized construction industry has undergone major construction and major industries, and without considering the technical expertise of construction works, the construction industry is promoting the integration and establishment of specialized construction industries according to convenience and abolition of their own industries. As the reorganization plan causes confusion in the production structure and lacks persuasive power by aiming only for industry simplification, it is judged to be desirable to review it according to the detailed characteristics of the specialized construction industry. In this study, -to review the reorganization of a rational classification system that considers the specific nature of the specialization of specialized construction projects, the classification of construction works, major work contents and characteristics, technical expertise, and problems of largescale industry in the case of painting construction and landscaping construction was analyzed. Based on this, aspects to be considered when reorganizing the current professional construction industry classification system are identified and reasonable improvement plans for each industry are suggested.

Construction Works at the Busan New Port on the Activity of Otters (부산신항 공사가 수달의 활동 변화에 미치는 영향)

  • Han, Chang-Wook;Yoon, Myung-Hee
    • Korean Journal of Environment and Ecology
    • /
    • v.26 no.5
    • /
    • pp.654-667
    • /
    • 2012
  • To know the effect of construction works at the Busan New Port on the activity of otters, changes in the distribution of spraints were investigated at 5 areas(I-V) composed of 16 locations in 12 islands from 2003 to 2011. There were significant differences among the density of spraints at each area(P=0.0502), at each year(P=0.0040) and at each area during the study period(P=0.0005). The densities of spraints in the areas II (P=0.000) and IV (P=0.012) were significantly different according to whether the construction work was carried out or not at each area. It was found that the density of spraints in each area was affected by the disturbance with construction works or other factors inside and/or outside the area. The average density of spraints of the 5 areas had changed according to the process of the construction works as follows. In 2003-2005 when the construction work was proceeded mainly at the area IV, the average density of spraints of the 5 areas as well as the density in the area II increased annually, whereas the densities in the other 4 areas were low and relatively constant. This fact suggests that otters might have moved into the area II from outside the study area. In 2006-2009 when the construction works were carried out on a larger scale at the areas I, II and III, there was a little decrease in the average density of spraints during the latter two years, suggesting a little decrease in the activity of otters in the study area. As regards the density of spraints at each area, it decreased considerably in the area II, but increased fairly in the areas III and IV. Accordingly it was indicated that otters in the area II where the construction work was carried out since 2006 might have moved into the area IV with no work, and otters inhabiting the Jeodo, Geoje city, where the construction work was carried out at that time, might have moved into the area III with no work at the sea shore. In 2010-2011 when the construction works were conducted at all the areas on a fairly large scale, the average density of spraints of the 5 areas as well as the densities in the areas II, III and IV, decreased considerably compared to the those in the year 2009. This fact clearly indicates that the number of otters decreased owing to the multiple simultaneous works in this period. In conclusion, otters must be affected by the construction works at the study area, and their numbers might be decreased mainly due to the multiple simultaneous works, as well as by the long-term works resulting in the decrease of seashore, marine pollution, and reducing prey available.

Cost and Schedule Analysis of Highway Projects based on Project Types

  • Shrestha, Bandana;Shrestha, Pramen P.
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.50-56
    • /
    • 2022
  • Change Orders generally impact cost and schedule performance of highway projects. However, highway projects that do not have any change orders also face cost growth and schedule delays. This study seeks to determine the cost and schedule performance of Texas DOT projects by collecting project data for 120 highway projects completed between 2016 to 2020. For the study, we selected project data that has zero or negative change orders which were then grouped and analyzed based on their Project Types i.e., maintenance works; structural works; restoration and rehabilitation works; and safety works. The study found that performance of Maintenance and Safety type projects had less cost and schedule growth among the data analyzed. Statistical tests also found that even though the projects have no change orders, Rehabilitation and Restoration type projects experienced significant schedule growth compared to others. However, the data did not show any significant cost and schedule growth for the projects when statistical tests were performed on overall data. The study concluded that highway projects are experiencing schedule growth even though the projects had no change orders. Results from the study can help planners, engineers, and administrators to gain better insight on how different types of highway projects are performing in terms of cost and schedule and eventually derive appropriate solutions to minimize cost and schedule growth in such projects.

  • PDF

건설근로자의 체계적인 안전보건교육 제도 도입방안

  • Jeong, Seong-Hun
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2010.11a
    • /
    • pp.81-91
    • /
    • 2010
  • Daily workers in construction sites rarely receive the benefit of systematic safety and health training as they are required to move from one construction site to another in response to the start, completion, and repetition of construction works. Also, small- to medium-sized construction sites often lack the capacity to train their workers. Therefore, as in the advanced countries, basic safety training system for construction workers should be conducted in the industrial-level, rather than in individual workplace-level, to make the training more effective. By doing so, only workers with the basic safety training will be able to engage in construction works. Consequently, accidents in the construction industry will decrease, as workers themselves who are at the forefront of the construction worksites are empowered to play the central role in accident prevention activities.

  • PDF

A Study on the Prediction of SIP Piling Noise by Computer Simulation (Computer Simulation을 이용한 SIP 항타소음의 예측에 관한 연구)

  • 이병윤;윤해동;김재수
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2001.11a
    • /
    • pp.14-21
    • /
    • 2001
  • Recently, with the increasing of construction works, large construction equipment are used to reduce the term of work and labor cost in construction field. Therefore, construction equipment noise has caused much annoyance for a number of dweller in nearby construction field and it has become a very serious problem in our living environment. Nevertheless, in our country, adequite guidelines for the construction equipment noise are very deficiency because of the lack of basic data and insufficient research works. From this point of view, this study attempts to survey the characteristics and prediction of SIP piling noise. On the basis of measurement value, we analysed about prediction possibility of SIP piling noise by computer simulation.

  • PDF

A Study on the Characteristics of Propagation and Attenuation of Piling Noise by SIP Method with Casing (Casing 부착 SIP공법에 의해 발생하는 항타소음의 전달 및 감쇠특성에 관한 연구)

  • 이병윤;윤해동;조원희;김재수
    • Journal of KSNVE
    • /
    • v.9 no.5
    • /
    • pp.899-905
    • /
    • 1999
  • Construction equipment noise has caused much annoyance for a number of dwellers in nearby construction field and has become a very serious issure in our living environment. Therefore, in our country, a practical solution and a better method of reducing construction equipment noise are highly required in construction field. Practical solutions for the construction equipment noise, however, are very difficult because of the poorness of basic data and insufficiency of the existing research. Especially, in order to establish the sound insulation plan about pilling works noise with high sound pressure level and impactive, a real situation of sound characteristics about the noise of pilling works in foundation work demands more detail investigation. In this point, this study attempts to survey the characteristics of attenuation and propagation of construction equipment noise in pilling work using SIP(soil-cement injected precast pile) method with casing. And this study intends to get the basic data for establishment of a standard about construction noise.

  • PDF

Process Analysis & Evaluation for Steel Frame Fabrication Automation (철골조립공사 자동화를 위한 프로세스 분석 및 평가)

  • Kim, Baek-Joong;Cho, Hun-Hee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.04a
    • /
    • pp.155-158
    • /
    • 2007
  • The construction industry kept lower level of the technology and productivity improvement than any other kinds of industry. But in most analysis of previous construction work which promoted the productivity of construction, the analysis process has only developed by the economical efficiency or the time studies through work sampling in construction field, So We suggest motion analysis as a tool to solve these problems. Spacially, this study find out productivity improvement method of steel frame fabrication works with using motion analysis. If the result of this study were to be applied to the actual construction field, it will be of great help for Building Construction Automation.

  • PDF

A Study on the Stability of Rope Guying of Tower Cranes. (타워크레인 로프가잉 안정성 검토에 관한 연구)

  • Lee, Won-Suk;Ho, Jong-Kwan;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.247-252
    • /
    • 2009
  • With the increasing use of tower cranes higher than free standing height, the importance of lateral support is also growing. Since the fall of 43 tower cranes hit by the last typhoon 'Mami' in 2003, regulations and concerns about safety of construction equipment have increased and construction laws regarding lateral support have been strengthened. In Korea, where there are many large-scale apartment housing construction works with the development of new towns, Rope Guying is a more economical construction method than Wall Brace which fixes building structure like building wall and slab. The safety of this Rope Guying is not verified and many construction works are still carried out based on the experience of site managers. There has been no case of construction work where frame and measurements are applied. The objective of this study is to examine the safety of Rope Guying method and ensure the effective implementation of equipment and prevention of disasters.

  • PDF