• Title/Summary/Keyword: construction works

Search Result 1,804, Processing Time 0.039 seconds

A Study on the Revision of Construction Standard Unit Price for Concrete Pavement Works (콘크리트포장 시공실태 조사에 따른 표준시장단가 개정 연구)

  • Lee, Ju-hyun;Baek, Seung Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.196-197
    • /
    • 2022
  • This study aims to come up with the revision of construction standard unit price for concrete pavement works to improve its applicability and availability by a construction site survey. Construction site survey was conducted from March to November 2021 with 36 construction sites. This results of the revision are expected to support to public construction project owner or estimator in construction cost estimation works.

  • PDF

Safety Management Information System in Roads Construction Work (도로 건설공사의 안전관리정보시스템 개발)

  • Park, Jong-Keun
    • Journal of the Korean Society of Safety
    • /
    • v.27 no.2
    • /
    • pp.72-77
    • /
    • 2012
  • There are insufficient models that find problems and solutions for accident prevention through risk assessment and suggest safe work process and work instruction from foundation works to finish work for accident decrease. This paper presents a quantitative risk assessment model by analysis of risk factors in each process such as earth works, drainage works, pavement works, appurtenant works and etc based on accident examples and investigation on actual condition in roads construction work. In addition, the safety management system was developed to perform risk assessment of construction and use it for effective safety training for labor.

The Development of a Construction Project Collaboration System: eWorks21 (eWorks21: 건설프로젝트협업시스템의 개발)

  • 구상회;최성철
    • The Journal of Society for e-Business Studies
    • /
    • v.6 no.3
    • /
    • pp.149-161
    • /
    • 2001
  • Construction and engineering is one of the world largest industry. Yet, it Is one of the most inefficiently operated industry. Since buildings are not constructed by mass production, construction projects usually require intense communication and collaboration between participants, who are usually widely dispersed. That is the main reason for the inefficiency. eWorks21 that we developed in this research, is a project management system that can improve communication and collaboration among project participants using the Internet. eWorks21 can reduce project life-cycle, costs, and increase revenue, resource utilization, controls, transparency, and competitiveness, which will eventually provide infrastructure for knowledge management of construction projects. In this research, we classified currently available project collaboration systems, and analyzed the benefits gained by using project collaboration systems. Then we describe the implementation of eWorks21, and discuss employment and utilization strategies of project collaboration systems.

  • PDF

Development of Intelligent Hydraulic Excavator System with Crane Function (크레인 기능 부착 지능형 유압 굴삭기 시스템 개발)

  • Lee, Hong-Seon;Lee, Min-Hee;Lim, Tae-Hyeong;Chun, Se-Young;Yang, Soon-Yong
    • Transactions of the Korean Society of Machine Tool Engineers
    • /
    • v.15 no.5
    • /
    • pp.29-36
    • /
    • 2006
  • The hydraulic excavators are mainly applied for excavating, public works, quarrying, etc. In some of the construction site, however, they are used for crane works of relatively light materials, although the crane works by the hydraulic excavators are forbidden by law due to the safety reasons. The major construction equipment companies in forward countries have been developing the new systems, e.g. crane works by the hydraulic excavators, and they are working in the construction site. Therefore, the new system of crane works by the hydraulic excavators should be developed for the domestic construction site in order to prevent the accident. In this paper, the fundamental study and experiment are accomplished for the crane system application on the hydraulic excavators.

A Study on Changes in the Density of Eurasian Otter Spraints (2012-2016) - The Busan New Port - (수달배설물 밀도 변화에 대한 연구(2012-2016) -부산신항만-)

  • Cha, Hyoun-Gi;Kim, Ji-Hye;Yoon, Myung-Hee
    • Journal of Environmental Science International
    • /
    • v.26 no.4
    • /
    • pp.457-466
    • /
    • 2017
  • The extensive construction works of container terminals progressed since 2006 was converted to small scaled construction works or reclaiming works since 2012 in Busan New Port area. To investigate changes in activity of otters with the change of construction work scales, the linear densities of spraints at 15 localities of 5 areas (I-V) near the Busan New Port construction areas were surveyed during the period from 2012 to 2016. As the results, the average linear density of spraints has a tendency to increase since 2014. That is, the linear densities of spraints have increased at the area II and IV where the reclaiming works have been progressed, although have decreased or unchanged in the areas I, III and V where small scaled construction works have been progressed. Based on the fact that there were habitats at the Honamdo in the area II and the Yeondo in the area IV, otters seemed to restore their activities around the habitats as the center regardless of the reclaiming works.

PROPOSING MANAGEMENT OF WORK PRIORITY TO REDUCE CONSTRUCTION FAILURE CLAIMS

  • In-ho Kim;Moon-Seo Park;Hyun-Soo Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1171-1176
    • /
    • 2005
  • Dispute related to construction projects involving numerous persons is one of the biggest challenges faced by contractors today. It costs a substantial amount of money and time in resolving these kinds of claims. Recently, with the changes in the construction environment and thought of relation with owner, the number of construction claims has increased. But, a majority of these claims do not prevail, and in fact, frequently get dismissed in its entirety. The reasons for such dismissals include the ignorance about the claims, lack of clear and convincing evidence, and so on. But most of reasons are the claims are not managed well on construction process. This paper analyzes the failure causes by relying on past claim failure cases, and then drew works that have connection with failure causes through interview. It also presented importance degree of construction management works.

  • PDF

Development of Design Support System to Optimize the Temporary Work (강교량 설치 가설공사의 최적화설계 지원시스템 개발)

  • Cho, Hun-Hee;Park, Jae-Woo;Cho, Moon-Young;Kim, Jung-Yeol
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.115-123
    • /
    • 2005
  • Design of steel $bridge^{\circ}AEs$ temporary works has conducted relying on the experiences of engineers based on the previous similar projects. Consequently, there have been arguments against over-design of temporary bents to be required at the actual construction sites, and unnecessary design changes have been issued at the construction stage. In this study, we have developed an optimum design support system for temporary works of the steel bridge construction through establishing the database for the materials to be needed for implementation of temporary works. We've also improved the accuracy and efficiency of the works through the design optimization for temporary works, and contributed to reduce design changes as well as to utilize the design informations at the construction stage.

SUGGESTING IMPROVEMENT METHODS OF FORM WORK FOR COST REDUCTION IN THE MID-RISE APARTMENT HOUSING

  • Jeongseok Lee;Seunghee Kang;Gunhee Cho;Jeongrak Sohn;Jongdae Bang
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1608-1614
    • /
    • 2009
  • In recent days, the study of urban regeneration has been conducting with purposeful and sincere intent starting out with the residential environment improvement works. Within the range of urban regeneration, the low-cost housing technology means development of totally-integrated housing technology that may be applied to the regeneration project, especially for the rundown areas where infrastructure facilities in the urban zone have been degraded and obsoleted. In line with this, among many and varied methods in order for realization of the low-cost housing as a part of urban regeneration project, this study should like to propose an improvement methods of the key technologies in relation to the construction works by type of work with which construction costs (directing cost) would be reduced. And, in order to elicit the method for element technology that has been developed and improved in the most optimal manner centering on the selected construction work by the type of work, the researcher conducted comparative review of summary of element technologies related to the construction works concerned, characteristics, and construction method thereof. In particular, the researcher investigated the expenses (construction cost and labor cost), constructions (contractibility and productivity), safety, quality of works, and the technical status in environmental aspects, and the researcher also conducted analyses and evaluations thereof.

  • PDF

Study on the Maintenance and Management using DB Program of Inspection Data for Tunnel (터널의 진단자료 DB화에 의한 유지관리 연구)

  • Lee, Song;Shim, Min-Bo
    • Proceedings of the KSR Conference
    • /
    • 2000.05a
    • /
    • pp.503-510
    • /
    • 2000
  • Recently, many kinds of research has been actively developing for a standardization and information related to the construction works. These works include the general field of design, construction, supervision, maintenance and management on facilities. The works of database construction for a standardization and information were chiefly propelled centering around the present conditions related to the design, construction work. The field related to maintenance and management on facilities lags behind in the works of database construction. The establishment of standard classification system(SCS) on facilities and inspection data is most important among the things related to maintenance and management to have a efficiently maintenance and management. This paper suggests SCS on facilities and inspection data according to that of facilities. On the basis of SCS of facilities and inspection data, code work with classification system and input work for a data of maintenance and management was practised. The purpose of this paper is to suggest a kind of statistics data and investigate a characteristics of inspection using statistic data on tunnel structures

  • PDF

Study on the Necessity of Risk Assessment for The Live-Line working of Electrical Construction (전기공사업 활선작업의 위험성평가 필요성에 관한 고찰)

  • Choi, Seung-Dong;Hyun, So-Young;Han, Hyeong-Ju;Hong, Yong-Soo
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2011.04a
    • /
    • pp.719-730
    • /
    • 2011
  • The live-line works are very dangerous works on direct contacts or neighboring contacts with the distribution line. But most of domestic electrical construction companies that have performed live-line works are small-scale companies. Accordingly, safety management system and manuals to insure worker's safety haven't sufficiently had. In this paper, risk and status of accidents for the live-line works were analyzed and the necessity of introducting risk assessment for live-line works was identified by a questionnaire survey of electrical construction companies and education institutions.

  • PDF