• Title/Summary/Keyword: construction works

Search Result 1,807, Processing Time 0.027 seconds

Selection process of the optimal structural-reinforcement method in remodeling construction works (리모델링 프로젝트의 최적 구조보강방법 선정 프로세스)

  • Kim, Dong-Pil;Cho, Kyu-Man
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.298-299
    • /
    • 2014
  • As a governmental plan for real estate revitalization, remodeling vertical extension has been permitted. Thus, the Ministry of Land, Infrastructure and Transport preannounced proclaiming the revised Housing Act and establishing the remodeling basic plan, and it is anticipated that the remodeling market will be revitalized in earnest after the enforcement of remodeling vertical extension(April 25th. 2014). As vertical extension is applicable up to 3 stories, the safety of building for remodeling is becoming important, so most remodeling construction works use various methods for structural reinforcement. In this process, the selection of structural reinforcement method has depended on structural engineer's experience and knowledge and there has been a limitation in selecting the optimum structural reinforcement method which considers remodeling project characteristics. Therefore, this study analyzed the factors to determine the kinds of structural reinforcement method in a remodeling project and suggested a process to select the best structural reinforcement method of remodeling construction.

  • PDF

Productivity Measurement and Analysis on Factors in Steel Erection (철골세우기의 현장생산성 측정 및 영향요인 분석)

  • Lee, Ji-Yong;Huh, Young Ki;Ahn, Bang Ryul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.123-127
    • /
    • 2008
  • As buildings becoming higher and more enormous the portion of steel works has been increased, which makes the schedule planning and management more significant. However, in actual construction sites, management is more based on a manager's construction experience than productivity data accumulated in previous projects. Moreover, most of the existing studies also featured a theoretical approach rather than an analysis of data straightforwardly collected in sites. In this study, a steel-erection site was visited to collect productivity data. The study found that there were significant disparities between aboveground work productivity and underground work. However, the productivities of 'first node on ground' and 'second node on ground' were estimated similar. The productivity data collected and factors affecting the productivity will help managers to plan and control their similar steel-erection works. This study will also be beneficial for those performing related studies.

  • PDF

CONSTRUCTION COST CLAIMS, OR ENTITLEMENTS?

  • Tan Hock Soon Adrias
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.150-159
    • /
    • 2007
  • More often than not, cost claims which are legitimately due and entitled to the contractor for works done, or for loss and expense incurred arising from disruption, prolongation and delay, are surprising not successfully recovered, whether in whole or in part, or none at all. One of the main reasons attributing to such scenario, is due to either the contractor, employer or the consultants and their poor understanding of and adherence to established and proper contractual rubric that is embodied in the building construction contract for the works. This paper explores some such pitfalls that could very well spell the ultimate financial disaster for many contractors, and highlights salient and essential intimations that contractors and consultants should watch out for.

  • PDF

Examining Change Order Reasons for Non-Structural Utility Support Projects in Healthcare Facilities

  • Genota, Naomi P.;Kim, Joseph J.
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.188-195
    • /
    • 2022
  • Although issuing change orders is a common practice in the construction phase of any project, non-structural utility subcontractors are struggling and seek to find a way to reduce change orders. Therefore, this paper presents the analysis results on change orders to cultivate possible suggestions and solutions on how to reduce or minimize change orders in mechanical, electrical, and plumbing (MEP) works. Change orders in non-structural utility works are analyzed based on six categories such as rerouting and change of location, changes in weight, rejected design by Office of Statewide Health Planning and Development, District Structural Engineer, or the Structural Engineer of Record, unforeseen conditions, changed equipment, and owner-initiated change. The analysis findings showed that rerouting and changing location is the most significant cause, followed by unforeseen conditions. The results not only contribute to the existing body of knowledge on change order research area, but also help MEP contractors reduce the time and cost of change orders.

  • PDF

Reinforced-Concrete Works Productivity Analysis on Nuclear-Power-Plant Project

  • Lim, Jin-Ho;Huh, Young-Ki;Oh, Jae-Hun;Seo, Hyeon-Taek
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.600-601
    • /
    • 2015
  • Both the importance and process of estimating Nuclear-power plant construction time and cost have increased in significance as energy user costs themselves have become more significant. In estimating construction time, few parameters are more significant than work item production rates and factors significantly affecting the rates. A standardized data collection tool was used to acquire a total of 401 data points from a S Nuclear-power plant project, for selected critical works: form-work, rebar-work, and concrete-pouring. With the data, several hypothesized drivers of the man-hour production rates and crew-day production rates were also analyzed. Findings from this study will enable industry professionals to enhance accuracy of time and cost estimation for nuclear power plant construction.

  • PDF

Analysis of Death Accidents of Hazardous and Dangerous Works defined in Regulation for Employment Restriction and Special Education for Safety and Health (유해·위험작업의 취업제한에 관한 규칙 및 특별안전보건교육 대상작업의 사망재해 분석에 관한 연구)

  • Jung, Seung Rae;Chang, Seong Rok
    • Journal of the Korean Society of Safety
    • /
    • v.31 no.3
    • /
    • pp.116-122
    • /
    • 2016
  • With the changes of industrial structure, contents and types in hazardous and dangerous works have been changed considerably. However, the hazardous and dangerous works by defined "Regulation for the hazardous and dangerous work employment restriction" and "Special education for safety and health"have not been amended over twenty years. This study aimed to identify the recent trends of the works by analyzing the death accidents cases from 2004 to 2013 and to present the management methods about future hazardous and dangerous works. The results showed that amount of 1,972 cases among 11,513 death accidents were equivalent to the works presented by "Regulation for the hazardous and dangerous work employment restriction". The amount of death accidents in 'Work of using construction equipment following construction machinery management act' was biggest among the death accidents cases and that of 'Work of handling pressure vessels following high-pressure gas safety control act' didn't show up. For the works in "Special education for safety and health"amount of 1,650 death accidents cases were equivalent. The amount of death accidents in 'Work involving a crane with a capacity of 1 ton or more or work which is carried out with a crane or hoist with a capacity of less than 1 ton in a workplace having at least 5 such machines' presented by "Special education for safety and health"was biggest. Also, death accidents case didn't occurred in three works presented by "Special education for safety and health". It was analyzed that works with low death accidents cases should be needed to study thoroughly the whole disaster research involving nonfatal accidents. Through this study, it was expected that regulation can be operated practically in the industrial field. Also, it is considered to increase

Damage Detection and Damage Quantification of Temporary works Equipment based on Explainable Artificial Intelligence (XAI)

  • Cheolhee Lee;Taehoe Koo;Namwook Park;Nakhoon Lim
    • Journal of Internet Computing and Services
    • /
    • v.25 no.2
    • /
    • pp.11-19
    • /
    • 2024
  • This paper was studied abouta technology for detecting damage to temporary works equipment used in construction sites with explainable artificial intelligence (XAI). Temporary works equipment is mostly composed of steel or aluminum, and it is reused several times due to the characters of the materials in temporary works equipment. However, it sometimes causes accidents at construction sites by using low or decreased quality of temporary works equipment because the regulation and restriction of reuse in them is not strict. Currently, safety rules such as related government laws, standards, and regulations for quality control of temporary works equipment have not been established. Additionally, the inspection results were often different according to the inspector's level of training. To overcome these limitations, a method based with AI and image processing technology was developed. In addition, it was devised by applying explainableartificial intelligence (XAI) technology so that the inspector makes more exact decision with resultsin damage detect with image analysis by the XAI which is a developed AI model for analysis of temporary works equipment. In the experiments, temporary works equipment was photographed with a 4k-quality camera, and the learned artificial intelligence model was trained with 610 labelingdata, and the accuracy was tested by analyzing the image recording data of temporary works equipment. As a result, the accuracy of damage detect by the XAI was 95.0% for the training dataset, 92.0% for the validation dataset, and 90.0% for the test dataset. This was shown aboutthe reliability of the performance of the developed artificial intelligence. It was verified for usability of explainable artificial intelligence to detect damage in temporary works equipment by the experiments. However, to improve the level of commercial software, the XAI need to be trained more by real data set and the ability to detect damage has to be kept or increased when the real data set is applied.

A study on the construction of government office in Dongnaebu at 19c (19세기 동래부(東萊府)의 관사영선(官舍營繕)에 관한 연구(硏究))

  • Kim, Sookyung;Kim, Soon il
    • Journal of architectural history
    • /
    • v.12 no.3
    • /
    • pp.87-100
    • /
    • 2003
  • This study is on the construction of government office of Dongnaebu through researching the construction reports and historical documents in 19century. Especially it focuses on the local construction system and operation for the government office. Main contents of the study are 1) Scope and process of construction, 2) Architectural administration and official notes, 3) Organization of participants and the feature, 4) Felling trees and transport, 5) Monetary of construction The results are summarized as follows. 1) Repair office customary were the courtesy new provincial man. Government building were inspected and repaired periodically. 2) Administrative system of construction have been operated. There are official notes which are about application, permition and order, concerned works such as logging at the bongsan, means of transport, paying wages and progressing works. 3) Organization of construction was made up of an officer and sangnee to supervise and supply. 4) Due to financial difficulty, local government reserved and appropriated funds with moneylending for building office.

  • PDF

Resource and Sequence Optimization Using Constraint Programming in Construction Projects

  • Kim, Junyoung;Park, Moonseo;Ahn, Changbum;Jung, Minhyuk;Joo, Seonu;Yoon, Inseok
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.608-615
    • /
    • 2022
  • Construction projects are large-scale projects that require extensive construction costs and resources. Especially, scheduling is considered as one of the essential issues for project success. However, the schedule and resource management are challenging to conduct in high-tech construction projects including complex design of MEP and architectural finishing which has to be constructed within a limited workspace and duration. In order to deal with such a problem, this study suggests resource and sequence optimization using constraint programming in construction projects. The optimization model consists of two modules. The first module is the data structure of the schedule model, which consists of parameters for optimization such as labor, task, workspace, and the work interference rate. The second module is the optimization module, which is for optimizing resources and sequences based on Constraint Programming (CP) methodology. For model validation, actual data of plumbing works were collected from a construction project using a five-minute rate (FMR) method. By comparing actual data and optimized results, this study shows the possibility of reducing the duration of plumbing works in construction projects. This study shows decreased overall project duration by eliminating work interference by optimizing resources and sequences within limited workspaces.

  • PDF

Project Informations Classification System for Civil Works (토목공사용 정보분류 코드체계의 개발)

  • Lee, Bae Ho;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.14 no.4
    • /
    • pp.897-905
    • /
    • 1994
  • Project Informations Classification System (PICS) can be utilized as a springboard for advanced construction management techniques because it marries informations to networks and maintains a disciplined cost control. The present study attempts to develop a PICS which can be applied in construction management techniques. The frame work largely consists of the three parts such as: (i) development of the tentative Work Breakdown Structure with three divisions, facility calssifications, functional classifications and work classifications, covering the whole areas of civil works, (ii) development of the integrated informations system including the other informations in cost estimating and network scheduling, (iii) construction of relational database system for computer application. The system suggested in the study is found useful for the systematic and uniform management of construction works in the various stages.

  • PDF