• 제목/요약/키워드: construction welding

검색결과 403건 처리시간 0.049초

웹싸이클론을 이용한 가스압접공사의 생산성 분석에 관한 연구 (Productivity Analysis of Gas Pressure Welding Work Using Web-CYCLONE)

  • 구신혁;김용우;이동은;허영기;손창백
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.273-275
    • /
    • 2012
  • In apartment building with column structure, reinforcing bar of the column is constructed mainly using gas pressure welding job. Therefore, gas pressure welding job in very critical process is construction apartment building with column structure. The purpose of this study is to analyze productivity of gas pressure welding work in column structure apartment using Web-CYCLONE. In this study, a CYCLONE model was developed for the productivity analysis of gas pressure welding work. Through this model, the optimal combination of the resources was obtained. This study will be utilized in the future as a useful tool of productivity analysis and the determination of an optimal combination of resources for gas pressure welding in apartment with column structure.

  • PDF

EFFECT OF WELDING SEQUENCE ON THE RESIDUAL STRESSES OF PLATE WITH LONGITUDINAL STIFFENERS

  • Kim, Namin;Lee, Jeongsoo;Woohyeon Choe
    • 대한용접접합학회:학술대회논문집
    • /
    • 대한용접접합학회 2002년도 Proceedings of the International Welding/Joining Conference-Korea
    • /
    • pp.657-660
    • /
    • 2002
  • In this paper, a study on the residual stress of plate with longitudinal stiffeners is explained in terms of the welding sequences. In order to verify the results of numerical analysis, the hole drilling method (HDM) is performed, to measuring the residual stresses of the test plates in $CO_2$ Flux Cored Arc Welding (FCAW) under various welding conditions. The non-linear transient analysis technique for the numerical analysis in a large and complicate structure is considered. The residual stress of plate in consideration of the welding sequences and directions is evaluated by some numerical simulations and also by experiments. Comparison of numerical analysis results with experimental data shows the accuracy and validity of the proposed method.

  • PDF

건설기계 조립 라인 투입 순서를 고려한 제관 공정 생산 스케줄링에 관한 연구 (A Study on the Body Welding Operation Scheduling Considering the Assembly Line's Input Sequence in Construction Equipment Manufacturing)

  • 김기동;최호식
    • 산업기술연구
    • /
    • 제27권A호
    • /
    • pp.69-76
    • /
    • 2007
  • The body of an excavator, one sort of the construction equipment, consists of mainframe part, track frame part, boom part and arm part. The all parts are manufactured in the body welding operation. The scheduling in the body welding operation of a construction equipment manufacturing is to take all the various constraints into consideration. The offset time, due date, daily capacity of operations, daily jig's capacity, precedence relation, outsourcing, alternative resource and all of the shop floor environment should be considered. An APS(Advanced Planning & Scheduling) system is a proper and efficient system in such circumstance. In this paper, we present an APS system, the optimal scheduling system for the construction equipment manufacturing specifically for the body welding operation, using ILOG Solver/Scheduler. ILOG Solver/Scheduler is a general purposed commercial software which supports to find a feasible or optimal solution using object oriented technique and constraints satisfaction programming, given constraints and objectives.

  • PDF

선체외판부 3.2T 박판에 대한 SAW 용접 적용에 관한 연구 (A Study on the Application of SAW Process for Thin Plate of 3.2 Thickness in Ship Structure)

  • 오종인;윤진오;임동용;정상훈;이정수
    • 대한용접접합학회:학술대회논문집
    • /
    • 대한용접접합학회 2010년도 춘계학술발표대회 초록집
    • /
    • pp.51-51
    • /
    • 2010
  • Recently just as in the automobile industry, shipbuilders also try to reduce material consumption and weight in order to keep operating costs as low as possible and improve the speed of production. Naturally industry is ever searching for welding techniques offering higher power, higher productivity and a better quality. Therefore it is important to have a details research based on the various welding process applied to steel and other materials, and to have the ability both to counsel interested companies and to evaluate the feasibility of implementation of this process. Submerged-arc welding (SAW) process is usually used about 20% of shipbuilding. Similar to gas metal arc welding(GMAW), SAW involves formation of an arc between a continuously-fed bare wire electrode and the work-piece. The process uses a flux to generate protective gases and slag, and to add alloying elements to the weld pool and a shielding gas is not required. Prior to welding, a thin layer of flux powder is placed on the work-piece surface. The arc moves along the joint line and as it does so, excess flux is recycled via a hopper. Remaining fused slag layers can be easily removed after welding. As the arc is completely covered by the flux layer, heat loss is extremely low. This produces a thermal efficiency as high as 60% (compared with 25% for manual metal arc). SAW process offers many advantages compared to conventional CO2 welding process. The main advantages of SAW are higher welding speed, facility of workers, less deformation and better than bead shape & strength of welded joint because there is no visible arc light, welding is spatter-free, fully-mechanized or automatic process, high travel speed, and depth of penetration and chemical composition of the deposited weld metal. However it is difficult to application of thin plate according to high heat input. So this paper has been focused on application of the field according to SAW process for thin plate in ship-structures. For this purpose, It has been decided to optimized welding condition by experiments, relationship between welding parameters and bead shapes, mechanical test such as tensile and bending. Also finite element(FE) based numerical comparison of thermal history and welding residual stress in A-grade 3.2 thickness steel of SAW been made in this study. From the result of this study, It makes substantial saving of time and manufacturing cost and raises the quality of product.

  • PDF

자동 오비탈 TIG 용접기술을 이용한 배관 용접 (The Use of Orbital TIG Welding Process for the Construction and the Repair of Field Piping)

  • 정인철;심덕남
    • 대한용접접합학회:학술대회논문집
    • /
    • 대한용접접합학회 2004년도 춘계 학술발표대회 개요집
    • /
    • pp.27-29
    • /
    • 2004
  • Orbital TIG welding process being used fur the new construction, the repair of nuclear piping system ana other critical piping. When weld quality is important or there are a large number of similar weld to be made or when access is restricted with manual torch, Orbital TIG welding is most effective process because of practical for out-of-position and high weld quality. Furthermore, typically superior to manual TIG welding process where the pipe remains in place and the tungsten electrode orbits the weld. As smaller and more compact welding head is being developed, could operate in tight spaces and lend itself to this type of application better than any other welding process. Orbital TIG welding has become more and more field practical process.

  • PDF

신경 회로망을 이용한 아크 용접 프로세스 모델링 (A Modular Neural Network for The Construction of The ARC Welding Process Model)

  • 김경민;박중조;송명현
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2000년도 제15차 학술회의논문집
    • /
    • pp.166-166
    • /
    • 2000
  • This paper describes for applications of neural networks in the field of arc welding. Conventional, automated process generally involves sophisticated sensing and control techniques applied to various processing parameters. Welding parameters affecting quality include the arc voltage, the welding current and the torch travel speed. The relationship between the welding parameters and weld qualify is not a direct one, and in addition, the effect of the weld parameter variables are not independent of the each other - changing the welding current will affect the arc voltage, and so on. Finally, a suitable proposal to improve the construction of the model has also been presented in the paper.

  • PDF

Experimental Test on the Effect of Onsite Welding of Steel Plates for a Joint Between Concrete Columns and a Steel Belt Truss

  • Shim, Hak Bo;Yun, Da Yo;Park, Hyo Seon
    • 국제초고층학회논문집
    • /
    • 제9권2호
    • /
    • pp.155-166
    • /
    • 2020
  • To connect exterior reinforced concrete (RC) columns with the steel belt truss, the gusset plates are welded to the steel plates embedded in the RC column. Then, the concrete around an embedded plate is very likely to be damaged by the heat input from a long-time (6 to 48 hours) welding of the embedded and gusset plates at a joint between RC columns and steel belt truss. However, very few studies have assessed the concrete damage caused by the welding heat between embedded and gusset plates, and no clear onsite solution has been found. In this paper, experimental tests have been carried out on 4 full-scale specimen to analyze the effect of long-time (about 6 hours) onsite welding (1-side welding and 3-side welding) between a gusset plate and an embedded plate in high strength concrete with compressive strength of 55 MPa and 80 MPa on RC columns. The effect of the long-time welding heat of embedded and gusset plates, which are used in real high-rise building construction sites, on concrete is analyzed in terms of the following three items: 1) temperature distribution, 2) pattern and characteristics of cracks, and 3) effect of the cracks on the compressive strength of RC column. Based on the experimental results, even though the heat input up to about 150? from the long-time onsite welding on the high-strength concrete column for the joint could result in concrete cracks in a radial form, it is found that the welding cracks have no effect on the axial stiffness and strength of the concrete column.