• 제목/요약/키워드: construction technology development

검색결과 3,158건 처리시간 0.027초

BIM과 RFID 기술을 활용한 건설 폐기물 관리 방안 (Building waste management plan using BIM and RFID technology)

  • 단신;안이슬;함남혁;김재준
    • 한국BIM학회 논문집
    • /
    • 제12권2호
    • /
    • pp.26-39
    • /
    • 2022
  • The purpose of this study is to establish a novel system for on-site management of construction and demolition waste. Construction waste has always been one of largest waste in the world and has long lacked an effective management system. Although various countries have planned the disposal of waste at the political level, the real-time and effective management of construction sites has not been mentioned. Especially in China, the continuous development of the construction industry also generates a large amount of waste, and China is not prepared for a large amount of construction waste. In order to alleviate the huge impact of construction waste on society and the environment, this study proposes a waste management method that combines Building Information Modeling technology and Radio Frequency Identification technology. Through this research, by using information technology to manage the generation and discharge of construction waste, and record the amount and information of waste generation, also improve the management method of construction waste.

Development of Tunnel Asset Management (TAM) Program

  • Hamed Zamenian;Dae-Hyun (Dan) Koo
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.576-582
    • /
    • 2013
  • Typical highway infrastructure systems include roadway pavement, drainage systems, tunneling, and other hardware components such as guardrails, traffic signs, and lighting. Tunnels in a highway system have provided significant advantages to overcoming various natural challenges including crossing underneath bodies of water or through mountainous areas. While only a few tunnel failure cases have been reported, the failure rate is likely to increase as these assets age and because agencies have not emphasized tunneling asset management. A tunnel system undergoes a deterioration life cycle pattern that is similar to other infrastructure systems. There are very few agencies in the United States implementing comprehensive tunnel asset management programs. While current tunnel asset management programs focus on inspection, maintenance, and operation safety, there is an increasing need for the development of a comprehensive life cycle tunnel asset management program. This paper describes a conceptual framework for a comprehensive tunnel asset management program. The framework consists of three basic phases including a strategic plan, a tactical plan, and an operational plan to provide better information to the decision makers. The strategic plan is a basic long term approach of tunnel asset management. The tactical plan determines specific objectives and the operational plan actually applies asset management objectives in practice. The information includes operational condition, structural condition, efficiency of the system, emergency response, and life cycle cost analysis for tunnel capital improvement project planning.

  • PDF

건설신기술의 현장활용 저해요인 분석 및 활성화 방안 (Examination of Obstacles Impeding the Deployment of New Construction Technologies On-Site and Development of an Activation Strategy)

  • 박환표;배병윤
    • 한국건축시공학회지
    • /
    • 제23권4호
    • /
    • pp.369-380
    • /
    • 2023
  • 국내 건설신기술제도는 건설업계의 자발적인 기술개발을 유도하여 국내 건설기술 수준 향상 및 경쟁력 강화에 기여하였다. 특히 건설신기술의 현장적용으로 공사비 절감 및 공기단축의 성과를 달성하였다. 그러나 건설신기술제도가 도입된 지 33년이 지났지만, 건설신기술의 매년 지정건수와 건설현장 활용실적은 정체 수준이다. 따라서 본 연구는 건설신기술의 현장활용 저해요인을 다각적으로 분석하고, 현장활용 활성화 방안을 제안하였다. 주요 결과는 건설신기술 활용실적 모니터링 제도 도입, 특정공법심의 기술위주의 평가, 건설신기술 사후평가시스템 개선, 건설신기술의 기술마켓시스템 등록체계 구축, 건설신기술의 활용실적 관리방안을 제안하였다. 이러한 제도개선은 건설신기술의 현장활용을 촉진할 것으로 기대된다.

비정형 패널 분할 시 영향요인 분석 (Analysis of influence factors on panelizing of free-form buildings)

  • 이동훈;임지영;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.126-127
    • /
    • 2015
  • New technologies using a CNC machine to reduce the production cost of free-form buildings are being developed. To produce free-form members with such technologies, a vast free form building should be first divided into multiple panels that can be produced. Considering the curved surface of free-form buildings, the shape and size of divided freeform panels vary, which will lead to a great deal of errors. Currently, the engineers and designers complete the panelizing work through trials and errors even in large-scale projects, which results in increased construction duration and cost. Thus, it is necessary to develop a freeform panelizing technology to maximize the economic effects of free-form concrete member production technology. The purpose of the study is to analyze influence factors on panelizing of free-form buildings, which is a preceding research for development of a panelizing technology. The influence factors drawn will provide a core basis for development of panelizing technologies for free-form buildings.

  • PDF

원심모형 실험기의 실시간 무선데이터 측정시스템 구축 (Development of real-time wireless data measurement technique on Centrifugal experiment)

  • 이종필;김유석;박진우
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 추계 학술발표회
    • /
    • pp.1289-1293
    • /
    • 2010
  • A slipring or FORJ are usually adopted in order for power supply of Geo-centrifuge and input/output data acquisition. Since using slipring causes quite a lot electrical noise, an optical communication using FORJ becomes more general for data acquisition. Such data acquisition devices, however, require frequent maintenance and replacement due to deterioration by long term usage. DICT has set up a real-time wireless date acquisition system using wireless communication technology instead of FORJ. The system enables a remote measurement at any inertial acceleration field up to 100g level and provides as same performance as FORJ. The priority of this system is to use a normal modem substituting a special FORJ.

  • PDF

민간 건설기술 R&D 활성화 방안 (Promotion Directions for Construction R&D in Private Sector)

  • 유정호;류원희;김우영
    • 한국건설관리학회논문집
    • /
    • 제8권6호
    • /
    • pp.167-177
    • /
    • 2007
  • 건설산업의 지속적 성장과 위상의 제고 그리고 국제적인 기술경쟁력을 확보하기 위해서는 건설기술 연구개발이 필수적이다. 그러나 우리나라 정부차원에서의 건설기술 연구개발 예산 배정은 다른 나라에 비해 저조한 실정이며, 건설기술 연구개발을 촉진하기 위한 여러 제도적 내용도 개선의 필요성이 있다. 본 연구에서는 특히 건설기술 개발의 주요 주체임과 동시에 궁극적 사용자가 되는 민간기 업의 건설기술 연구개발을 촉진하기 위한 방안을 모색하고자 하였다 이를 위해 본 연구는 우선 민간기업 차원의 건설기술 연구개발 현황과 정부 차원의 건설기술 연구개발 투자 및 제도 현황을 각종 통계자료를 이동하여 문제점을 탐색하였다. 또한 20개 건설사의 연구개발 담당자를 대상으로 한 설문조사 결과를 현황 분석 및 대안 제시에 활용하였다. 본 연구에서는 민간기업 차원의 건설기술 연구개발 활성화 방안을 제시하기 위해 민간 건설기술 연구개발 활성화의 선순환 과정을 설정하고, 이에 따라 민간 건설기술 연구개발의 투자환경 조성 방안, 연구개발 투자 확대 방안, 그리고 연구개발 직접 촉진 방안을 제시하였다.

설계업무 프로세스 개선을 통한 설계관리의 발전 방향 (Design management's development direction through design process improvement)

  • 김한;김선규;이낙운
    • 산업기술연구
    • /
    • 제27권B호
    • /
    • pp.169-176
    • /
    • 2007
  • Recently, construction industry has been magnified while various cooperative relationship makes steady process. So importance of management during construction is gathering strength. Therefore, we need systematic management gradually. But almost management of construction industry that performs these day is focused on construction phase not design phase. The purpose of the present study is to find the effective way of design management with enhancing the process of design phase.

  • PDF

먹매김 시공 자동화 로봇 개선 우선순위 도출 연구 (A study on improvement priority of an automated layout robot)

  • 박규선;김태훈;임현수;조규만
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 가을학술발표대회논문집
    • /
    • pp.233-234
    • /
    • 2023
  • Construction robot-based automation can contribute to productivity and quality improvement by replacing manpower in tasks that have simple repetitive properties or require high precision. In this respect, layout work is one of the most effective tasks in introducing robot-based automation technology. The development of a robotic layout system for building structures has recently been promoted in Korea, and a prototype of a marking robot has been produced. However, for commercialization, the technology improvement is required through the analysis of major improvement directions. Therefore, this study aims to derive the improvement priorities of the marking robot based on the evaluation of researchers who participated in the development process. As a result, there was a high demand for improvement in factors such as the robot's precise positioning method and robot size and weight. The results of this study are expected to serve as guidelines for the efficient input of limited resources in the future technology development process.

  • PDF

건설 기능인력부족 문제해결을 위한 대응전략 벤치마킹 연구 - 영국 MMC와 싱가포르 Buildability 중심으로 - (A Study on Benchmarking the Countermeasures Strategy for Tackling the Construction Labor Shortage - Focusing UK's MMC & Singapore's Buildability -)

  • 유정호;손보식
    • 한국건설관리학회논문집
    • /
    • 제23권6호
    • /
    • pp.54-64
    • /
    • 2022
  • 국내 건설산업의 지속적인 노령화 및 인력부족 문제는 노동집약적 건설업의 특성과 지속되는 청년층의 건설업계를 향한 부정적 이미지가 증가하는 현실을 감안할 때 더 이상 미래의 문제가 아니라 국내 건설업의 생존을 위해 꼭 해결해야할 선결과제임에 틀림없다. 본 연구는 국내 건설산업이 직면한 건설 인력부족의 근원적인 문제점을 조명하고 인력부족문제를 해결하기 위해 최근 5년간 패스트트랙 성향의 신속한 대응책을 마련하고 있는 영국의 MMC 사례와 약 20년간의 중장기적인 대응방안을 모색하고 있는 싱가포르의 Buildability 사례를 비교분석함으로써 양국이 제시하는 전략적 대응방안의 시사점을 도출하고 유사한 전략을 구사하기 위한 방안을 제안하였다. 그리고 본 연구가 제시한 대응전략을 프로세스 다이어그램으로 제시하여, 향후 전략개발의 방향성을 명확히 하였다.

유비쿼터스 사회기반구축 및 관리를 위한 건설계측기술의 미래 (Future of Ubiquitous Structural Health Monitoring for Infrastructure Management)

  • 임홍철
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2006년도 정기 학술대회 논문집
    • /
    • pp.63-68
    • /
    • 2006
  • As a part of efforts to enhance construction technology, it is essential to obtain competitive technology which is future-oriented. In this paper, the current status of structural health monitoring techniques is reviewed. Also, ubiquitous system is expected in its use for further development and applications in construction.

  • PDF