• Title/Summary/Keyword: construction supervision

Search Result 246, Processing Time 0.022 seconds

Preliminary Study for Vision A.I-based Automated Quality Supervision Technique of Exterior Insulation and Finishing System - Focusing on Form Bonding Method - (인공지능 영상인식 기반 외단열 공법 품질감리 자동화 기술 기초연구 - 단열재 습식 부착방법을 중심으로 -)

  • Yoon, Sebeen;Lee, Byoungmin;Lee, Changsu;Kim, Taehoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.133-134
    • /
    • 2022
  • This study proposed vision artificial intelligence-based automated supervision technology for external insulation and finishing system, and basic research was conducted for it. The automated supervision technology proposed in this study consists of the object detection model (YOLOv5) and the part that derives necessary information based on the object detection result and then determines whether the external insulation-related adhesion regulations are complied with. As a result of a test, the judgement accuracy of the proposed model showed about 70%. The results of this study are expected to contribute to securing the external insulation quality and further contributing to the realization of energy-saving eco-friendly buildings. As further research, it is necessary to develop a technology that can improve the accuracy of the object detection model by supplementing the number of data for model training and determine additional related regulations such as the adhesive area ratio.

  • PDF

A STUDY ON THE PROCESS OF LARGE-SCALE REPAIR OF A CONDOMINIUM

  • Seki, Eiji;Akiyama, Tetukazu
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2002.11a
    • /
    • pp.295-300
    • /
    • 2002
  • Since the contents of large-scale repair of a condominium were various, a plan document was not prepared. The owners association of the condominium has given priority to decision-making of price priority over quality. Examination is not performed about the contents of the construction supervision business, which checks whether suitable construction is performed, either. On the other hand, the know-how for builders, such as decision of the process plan under which the repair work lessens influence to the safety and life as much as possible since the place where the resident is living turns into a construction site, and selection of a method of construction, is just going to ask. It is an important subject how the structure of the construction contractor selection, which considered quality, is built. Then, this research focuses on large-scale repair construction of the condominium, and arranges the actual condition of a series of processes from plan document creation to construction supervision. The method of research collects the construction documents of the condominium that carried out Barge-scale repair construction. Next, collection arrangement of the data of construction builder selection is carried out. The method of the construction builder selection of those other than a construction price is examined. The method of quality control of large-scale repair construction is examined.

  • PDF

Legislative Policy Assignments in Construction Project Management by Strengthening Safety-Related Laws - Focusing on the CM/supervision-related system - (안전관련 법제 강화에 따른 건설사업관리 분야의 입법정책적 과제 - CM/감리관련제도를 중심으로 -)

  • Lee, Jeonghwan;Jung, Youngchul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.76-88
    • /
    • 2022
  • The death toll in the Korean construction industry accounts for more than 50% of all business deaths. This is the highest level among OECD countries, and the government has proposed various solutions to this, but has not seen any significant effect. In order to strengthen safety responsibilities and obligations to CEOs of companies in the blind spot of punishment, including those who have the greatest authority and influence in the construction industry, the Moon Jae In government strengthened various laws, including legislation of the Serious Accidents Punishment Act. However, at this point in time, half a year later, it is still questionable whether such punishment has been strengthened and the effectiveness of fragmentary measures has been exerted. This paper attempted to present legislative policy directions for the problems of the current system and future improvement measures to contribute to reducing significant accidents in the CM/supervision industry among the various subjects of the construction industry.

A study on aeroelastic forces due to vortex-shedding by reduced frequency response function

  • Zhang, Xin;Qian, Zhanying;Chen, Zhen;Zeng, Fanna
    • Wind and Structures
    • /
    • v.12 no.1
    • /
    • pp.63-76
    • /
    • 2009
  • The vortex-induced vibration of an ${\sqcap}$-shaped bridge deck sectional model is studied in this paper via the wind tunnel experiment. The vibratory behavior of the model shows that there is a transition of the predominant vibration mode from the vertical to the rotational degree of freedom as the wind speed increases gradually or vice versa as the wind speed decreases gradually. The vertical vibration is, however, much weaker in the latter case than in the former. This is a phenomenon which is difficult to model by existing parametric models for vortex-induced vibrations. In order to characterize the aeroelastic property of the ${\sqcap}$-shaped sectional model, a time domain force identification scheme is proposed to identify the time history of the aeroelastic forces. After the application of the proposed method, the resultant fluid forces are re-sampled in dimensionless time domain so that reduced frequency response function (RFRF) can be obtained to explore the properties of the vortex-induced wind forces in reduced frequency domain. The RFRF model is proven effective to characterize the correlation between the wind forces and bridge deck motions, thus can explain the aeroelastic behavior of the ${\sqcap}$-shaped sectional model.

Study on the Quality Improvement through Analysis of the Cause of the Structure Design Drawing in the Internal Reinforced Concrete Structures

  • Kim, Byung-Yun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.1
    • /
    • pp.76-86
    • /
    • 2014
  • The cause of crack on reinforced concrete structures is varied, while the studies, which have intended to analyze this in the material side, have been the mainstream so far. Therefore, in this study, we intended to suggest the proposals for enhancement of the system to reduce crack and to improve the quality of the reinforced concrete structures, by reviewing the cause of crack mainly in the structural aspect and analyzing the practices and the system. The result has been shown as following. (1) As one of the measures for improving the constructional system related to the structure, it is to enhance the relevant system so that design on construction, structure, and equipment, can be separately ordered or jointly ventured, and the owner or the agent of the owner can discuss and mediate the business in each specialized field. (2) Importance on construction supervision and new establishment of regulations related to structure supervision.

Analysis of Applicability of Supervisory Data for Performance Evaluation of Apartment Housing Construction Projects (공동주택 건설 프로젝트의 성과관리를 위한 감리업무 데이터 적용성 분석)

  • Sung, Yookyung;Hur, Youn Kyoung;Kim, Sung Hwan;Lee, Seung Woo;Kang, Seongmi;Park, Chan Hyuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.359-360
    • /
    • 2023
  • As data management and analysis technology advances, there is active discussion on how to utilize data generated in construction projects. Among them, the materials produced during the supervision work are highly useful because their generation cycle and format are regulated according to relevant laws. In this study, we analyzed whether the data produced during the supervision work in the construction phase of apartment housing can be utilized for project performance management. First, this study identified key data necessary for performance management through FGI with experts in the field of apartment housing. Next, we collected supervisory data from the case project and identified whether the data was generated, its cycle, and storage format. As a result of the analysis, the supervisory data contained various information that could measure the performance of construction projects and had the advantage of standardized data. In the future, utilizing supervisory data is expected to enable effective performance management of apartment housing construction projects.

  • PDF

A Study on the Development of the Guidelines for Supervision and Inspection of Earthworks Quantity Using 3D Scanning Technology (3D 스캐닝 기술을 이용한 토공사 기성관리 감독 및 검사 가이드라인 개발)

  • Lee, Young-ho;Yun, Won Gun;Park, Jae-woo
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.23 no.5
    • /
    • pp.735-746
    • /
    • 2020
  • Recently, in Korea, various technology developments have been made to utilize 3D space and facility data such as unmanned aerial vehicles (UAV) and laser scanners with the goal of improving productivity at construction sites. However, the lack of related regulations for 3D laser scanner surveying has been a barrier to using the technology across the surveying industry. As a result, owners, contractors, and construction supervisors are reluctant to introduce and apply technology to the site. In this study, the guidelines (drafting and inspection work to be supervised by construction supervisors when constructing earthworks using laser scanners) was developed and presented so that the earth surveying and quantity calculation technology using a laser scanner could be applied and diffused in a construction site. Through the development of this guideline (proposal), it is judged that the supervision and inspection of earthworks quantity using a laser scanner will be activated in the field.

A Study on the Recognition of Fire Construction Surveillance System : Focused on the Stakeholders (소방공사감리제도의 인식에 관한 연구 : 이해당사자를 중심으로)

  • Lee, Ranny;Jeong, Kyeon-Sik;Kong, Ha-Sung
    • Journal of the Korea Safety Management & Science
    • /
    • v.16 no.3
    • /
    • pp.133-143
    • /
    • 2014
  • The purpose of this article is to search stakeholders' recognition related to Fire Construction Surveillance system; a client(order), fire fighting officer, supervision company, construction company, design company, other. The paper provides 4 important things. Firstly, a client(order) suggested the lowest recognition in the needs about the need of separation order, that of contract for any construction work limited registered companies, and that of standard price for engineering.. Secondly, the design company is lowest recognition in guidance and control participating in construction-design phase. Thirdly, the design company is lowest in adjustment about manpower-allocation according to allocation criteria of technical manpower. Fourthly, a client(order) and supervision company are relatively lower than other stakeholder in necessity on special education and training system for auditor in fire protection construction. Almost all related matters are related to more or less stakeholders' interest.

A Development on Deep Learning-based Detecting Technology of Rebar Placement for Improving Building Supervision Efficiency (감리업무 효율성 향상을 위한 딥러닝 기반 철근배근 디텍팅 기술 개발)

  • Park, Jin-Hui;Kim, Tae-Hoon;Choo, Seung-Yeon
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.36 no.5
    • /
    • pp.93-103
    • /
    • 2020
  • The purpose of this study is to suggest a supervisory way to improve the efficiency of Building Supervision using Deep Learning, especially object detecting technology. Since the establishment of the Building Supervision system in Korea, it has been changed and improved many times systematically, but it is hard to find any improvement in terms of implementing methods. Therefore, the Supervision is until now the area where a lot of money, time and manpower are needed. This might give a room for superficial, formal and documentary supervision that could lead to faulty construction. This study suggests a way of Building Supervision which is more automatic and effective so that it can lead to save the time, effort and money. And the way is to detect the hoop-bars of a column and count the number of it automatically. For this study, we made a hoop-bar detecting network by transfor learnning of YOLOv2 network through MATLAB. Among many training experiments, relatively most accurate network was selected, and this network was able to detect rebar placement in building site pictures with the accuracy of 92.85% for similar images to those used in trainings, and 90% or more for new images at specific distance. It was also able to count the number of hoop-bars. The result showed the possibility of automatic Building Supervision and its efficiency improvement.

A Study of the Administrative Tribunal Cases about Violation of Law of Housing Projects (주거건축과 관련된 건축위법행위 행정심판판례 연구)

  • 김진욱;성기용
    • Journal of the Korean housing association
    • /
    • v.14 no.6
    • /
    • pp.33-40
    • /
    • 2003
  • The purpose of this study was to analyze the architect's Administrative Tribunal cases related to housing projects. We collected the 271 decisions of Administrative Tribunal cases from 1985 to 2001 through the Ministry of Legislation data base. As a conclusion of research, most of cases are caused during design process and supervision of construction which are major roles of architects. We can find out that the number of cases of Administrative Tribunal about housing is 10% more than other types of building. And this situation is more serious in supervision building phase. It proves that housing project has more possibility of violation of law than other types. Because it belong to an economic problems. In Korea, clients of housing project tend to take more profits by taking an illegal acts; like enlargement of a building, construction border violation. illegal construction balcony and so on. And architect who roles to be a supervisor is liable to these problems but he has not much authority and economical benefits. Through this research we can analyze this situation and make know what is problem.