• 제목/요약/키워드: construction specification

검색결과 571건 처리시간 0.027초

외벽청소로봇의 가이드레일 시공기준체계 구축에 관한 연구 (Development of the construction specification framework for skyscraper outer wall cleaning robot)

  • 박수열;김균태;한재구
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.292-294
    • /
    • 2013
  • When the number of skyscrapers are increased in the domestic, it has increased the need of the outer wall cleaning robot. However, it does not exist the construction specification of the outer wall cleaning robot in the domestic. it is difficult to apply in the domestic that the outer wall cleaning robot. For this reason, it raised the need of the construction specification. And it is urgent that the construction specification of the outer wall cleaning robot is needed to develop in the domestic. Therefore, this study aims to propose the construction specification framework of the outer wall cleaning robot. In the future, this study will be based on the development of the construction specification on the outer wall cleaning robot.

  • PDF

전자매뉴얼에 의한 건설공사 시방서 구성방안 (Framework of Electronic Construction Specification by Using IETM)

  • 문현석;강인석;정성윤;곽중민;정원명
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 춘계학술대회 논문집
    • /
    • pp.1114-1117
    • /
    • 2004
  • Application of information technology for the construction area has been processed actively with the development of information technology. In this study, a framework of the Construction Specification IETM(Interactive Electronic Technical Manual) was suggested through the analysis of the Department of Defense(DoD)'s standards and the trend of techniques related to the IETM. As the Framework, the DFD(Data Flow Diagram) of the construction specification IETM's organizing and using procedure was suggested. And a Model of construction specification IETM was organized on the basis of DFD. Finally, a scenario was constructed by the pilot system which is based on the model. The application of the construction specification IETM would make efficient and effect task implementations possible. By that, in addition to the reduction of the cost and time, the quality enhancement from information missing protect effectiveness could be expected.

  • PDF

모듈러 공사시방서 개선방안에 관한 연구 - 방수 및 기계설비공사의 기술방안 개선을 중심으로 - (A Study on Improvement of Modular Specifications - Focused on technical specifying method in waterproof and mechanical works -)

  • 윤종식;신동우;차희성;김경래
    • 한국건설관리학회논문집
    • /
    • 제18권3호
    • /
    • pp.33-41
    • /
    • 2017
  • 모듈러 시방서는 모듈제작, 운송, 설치에 필요한 요구사항을 기술하는 계약문서이다. 그러나 기존 모듈러 시방서의 문제점은 모듈러 공사에서 요구하는 성능수준을 보장해주지 못하고 공사별 특성을 배제한 채 건축공사 표준시방서의 내용을 그대로 차용하고 있다는 것이다. 본 연구에서는 모듈러 건축의 품질개선 방안으로 모듈러 특성에 적합한 공사시방서를 제안하였다. 연구의 범위는 하자발생이 높은 방수공사 및 기계설비공사에 한하여 진행하였다. 본 연구에서 제안하는 모듈러 시방서 개선방안은, 1) 마스터 포맷에 따른 descriptive형식의 서술, 2)누수점검 및 검사 항목 반영, 3) 모듈러 특성을 고려한 시방서 내용 작성이다. 개선안을 전문가 면담을 통해 검증하였으며 이와 같은 개선방안이 모듈러 공사시방서를 보완하여 향후 모듈러 건축의 품질향상을 가져올 수 있을 것으로 평가하였다. 본 연구에서 제안하는 시방서 개선안은 전체 공사시방서 작성의 가이드가 될 수 있으며, 이를 통해 모듈러 건축의 하자발생률을 낮추는데 큰 영향을 미칠 수 있을 것이다.

QUALITY ASSURANCE IN ROADWAY PAVEMENT CONSTRUCTION

  • Myung Goo Jeong;Younghan Jung
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.596-601
    • /
    • 2013
  • In the current pavement construction practice, the state agencies traditionally determine the quality of the as-constructed pavement mix based on individual mixture material parameters (e.g., air voids, cement or asphalt content, aggregate gradation, etc.) and consider these parameters as key variables to influence payment schedule to the contractors and the present and future quality of the as-constructed mixture. A set of empirically pre-determined pay adjustment schedule for each parameter that was differently developed and being used by the individual agencies is then applied to a given project, in order to judge whether each parameter conforms to the designated specifications and consequently the contractor may either be rewarded or penalized in accordance with the payment schedule. With an improved quality assurance system, the Performance Related Specification, the individual parameters are not utilized as a direct judgment factor; rather, they become independent variables within a performance prediction function which is directly used to predict the performance. The quantified performance based on the prediction model is then applied to evaluate the pavement quality. This paper presents the brief history of the quality assurance in asphalt pavement construction including the Performance Related Specifications, statistical performance models in terms of fatigue and rutting distresses, as an example of the performance prediction models, and envisions the possibilities as to how this Performance Related Specification could be utilized in other infrastructures construction quality assurance.

  • PDF

미장공사의 품기준 변화 요인에 관한 연구 (A Study on Factors Affecting Changes in Estimating Standards in Plaster Work)

  • 오재훈;안방율
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.232-233
    • /
    • 2019
  • The plater work in the standard of estimate presents a variety of construction types. However, there is a part that does not fit the change of specification standards and on-site construction status, and it was revised in 2019's standard of estimate. In this study, we analyzed in detail the factors affecting the changes in estimating standards in the plater work. There were changes in the specification standards previously presented as primary coat, secondary coat, and formal coat as well as changes in on-site construction status such as thickness according to the number of plastering. Therefore, it is analyzed that the estimating standards can be classified by the number of finishes according to the site conditions by reflecting the analysis of the specification standards and site application status, and suggesting the finishing standards according to the number of plastering.

  • PDF

Web기반 공사시방서 작성 시스템 개발 방안 (A Development of a Web Based Supporting System for Writing Construction Project Specification)

  • 김균태;김태송;구재동
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.501-506
    • /
    • 2001
  • 건설공사의 계약문서에는 설계도면, 공사시방서 등이 포함되나, 국제적인 수준의 계약문서로서 다소 미흡하게 작성되었던 것이 사실이다. 이러한 문제점을 해결하기 위하여 '98년 1월부터는 설계도서 작성시 공사시방서를 작성하도록 하였다. 그러나 제도의 도입초기이므로 참고할 만한 자료도 충분하지 않으며, 작성경험 및 능력도 부족한 실정이다. 이러한 점을 보완하기 위하여 개발된 기존 시스템은 네트워크를 고려하지 않아 시스템 활용과 유지관리 및 갱신에 한계가 있다. 본 연구에서는 기존 시스템을 개선하여, 전문시방서, 설계기준, 하위기술기준 둥 건설공사기준 DB를 구축하고, Web을 통해 구축된 DB를 검색·활용하여 공사시방서를 실시간으로 작성하는 시스템 개발 방안을 제시하였다. 이러한 시스템은 공사시방서 작성시, 표준시방서, 전문시방서 등 다양한 정보를 조회하여 수준높은 공사시방서를 작성하는데 일조할 것으로 기대된다.

  • PDF

유닛모듈러 공법의 시공매뉴얼 체계 개발 (Development of manual framework for unit modular construction method)

  • 김균태;김태영;전영훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 추계 학술논문 발표대회
    • /
    • pp.198-199
    • /
    • 2015
  • In Korea, it raised the need of the specification of unit modular construction, because there are no standard or manual. And it is urgent that the specification of unit modular construction is needed to develop in the domestic. Therefore, this study aims to propose the manual framework of the construction method. In the future, this framework will be based on the development of the manual on the unit modular construction method.

  • PDF

건설사업관리 분야에서 BIM적용을 통한 도서의 적합성 검토 사례 (A Case Study On The Suitability Of Drawings Through Application Of BIM In Construction Management)

  • 박영진;송경철
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 춘계 학술논문 발표대회
    • /
    • pp.33-34
    • /
    • 2017
  • The purpose of this case study is to reduce the flaw and reconstruction occur at the level of construction by determining the propriety of estimate and error on a drawing and specification at working design level through case studies of BIM application at the level of design review. As a preliminary to apply BIM technology, it is needed to review the drawing, and then it is required to define BIM range by selecting the section in which construction error occurs frequently except for the type of part that is constructed repeatedly. At the execution level, the drawing is reviewed vertically, horizontally and spatially by proceeding structure and finish modeling on the defined BIM range, and also the propriety of estimate and error on the drawing and specification are examined. We aim to raise the completion rate, improve quality of construction, reduce the cost for construction and shorten period of construction by preparing for the error on the drawing and specification in advance through this review procedures.

  • PDF

A Case Study of Asphalt Pavement Construction Quality Assurance Using the Quality Related Specification Software

  • Jeong, M. Myung;Jung, Younghan
    • Journal of Construction Engineering and Project Management
    • /
    • 제6권3호
    • /
    • pp.14-21
    • /
    • 2016
  • One of the major issues in the material-based or acceptance quality characteristics asphalt pavement Quality Assurance (QA) is that the method does not have rationality to link between the individual materials and the projected performance of the pavement. A new asphalt mix QA method has been recently developed under a national research project using the probabilistic Performance Related Specification (PRS). This advanced PRS QA methodology integrates the AASHTOWare Pavement ME Design$^{(R)}$ technology with the simple performance test concept that bridges the material characteristics with the pavement performance. This paper presents a case study of asphalt pavement performance using the developed PRS QA computer program, named Quality Related Specification Software (QRSS), with an actual pavement project, to demonstrate the developed PRS procedure and to assess the robustness of QRSS in terms of the rationality of the distress predictions. The results of this limited case study show that the new PRS QA method reasonably predicts the pavement performance, properly applied the probabilistic methods, and produced rational pay adjustment.

커튼월 공사의 성능·사양 연계 시방서 프로토타입 (Hybrid Prototype of Performance and Prescriptive Specifications in Curtain Wall Construction)

  • 이준호;조동현;구교진
    • 한국건축시공학회지
    • /
    • 제14권5호
    • /
    • pp.433-442
    • /
    • 2014
  • 건축공사 시 적정 품질 확보를 위해 활용되고 있는 대부분의 국내 설계기준 및 시방서는 절차를 중요시 하며 재료 치수 등을 규정하는 사양 기반이다. 공사업체의 창의성 저해 및 이로 인한 경쟁력 약화 등 사양시방서의 다양한 문제점에 기인하여 최근 최종 결과물을 중요시 하는 성능 기반의 시방서가 제시되고 있지만 건축 분야 적용에 한계가 있다. 본 연구에서는 국내외 시방서 사례의 성능 및 사양항목 기반의 커튼월 공사 성능 사양 연계 시방서 프로토타입을 제시하였다. 설문조사를 통해 중요 성능점검 시점을 도출하였으며, 각 시점별 관련 참여주체 역할을 반영한 성능점검 프로세스와 샘플시방서를 제시하였다. 전문가면담기반 검증 결과 현장적용성이 높고 공사 진행단계에서의 성능 확보를 적극적으로 지원할 수 있는 효과적인 도구로 평가되었다.