• Title/Summary/Keyword: construction situation

Search Result 1,227, Processing Time 0.035 seconds

Improvement Strategy for Demolition Industry through a Analysis of Domestic Demolition Technique and Situation (국내해체기술 및 현황분석을 통한 해체산업의 발전방향)

  • Kim, Chang-Hak;Kim, Hyo-Jin;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.2D
    • /
    • pp.143-151
    • /
    • 2010
  • Currently, one of the most interested things at home and abroad country will be an eco-friendly construction. Among these, one of the most important elements will be the recycle and reuse of construction and demolition waste. Because construction waste is generated the most at the demolition phase, it is important to minimize the quantity of the demolition waste at the phase. And it is also important to develop a system to manage rightly the generated demolition waste. But in the domestic country, a research for this has hardly been carried out. In recent, the government has realized its importance and is making a research to improve demolition technique and is preparing a research to make a raw for deconstruction. Therefore, this study examined its application situation and importance by analyzing the trend of demolition technique used in the domestic industry. Also this study carried out a survey for situation analysis of the demolition industry. This study suggested items needed for the development of demolition technique, demolition design and reduction of C&D waste through a survey results and a situation analysis.

A Study on Construction Lifts (건설용 LIFT에 대한 연구)

  • 김상렬;이정호;김일종
    • Journal of the Korean Society of Safety
    • /
    • v.8 no.2
    • /
    • pp.78-86
    • /
    • 1993
  • This study was aimed at analyzing the mangment system and problem situation related to the lift operation. To this end, 61 construction sites of‘H’construction Co., througnout the nation were surveyed for March 1992-May 1992.

  • PDF

Research of Applicated Situation of Precast Concrete, Characteristics Comparision for Worldcup Soccer Stadium. (월드컵 축구 경기장 PC적용 현황 및 특징 비교 연구 (전주, 광주, 대전 경기장))

  • 김영수;신동진;오을랑;정현일
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2000.10b
    • /
    • pp.1069-1072
    • /
    • 2000
  • '2002 FIFA Worldcup will jointly open in Korea and Japan. So 10 Stadiums have to be constructed in Korea. In this Research the PC situation, characteristic and construction method of 3 stadiums(Jeonju, Kwangju, Taejeon) will be compared.

Subway Station's Seating Capacity of Temporary Evacuees from Disastrous Situation through Analyzing the Number of Toilets (위생기구(변기) 수 분석을 통한 지하철역의 임시 대피인원 수용 능력 산정)

  • Sohn, Byonghu;Hwang, Eun-Kyoung
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.25 no.7
    • /
    • pp.418-426
    • /
    • 2013
  • With advantages of open spaces and existing HVAC facilities, subway station, if unexpected disastrous situation happens on the ground, can be used as a temporary safe place for evacuees. The main objective of this study is to establish a guideline on estimating evacuation capacity of the subway station and evaluating levels of service of evacuation for officials to control the situation. This guideline includes available spaces of the station, capacity of sanitary fixtures, and total number of passengers, etc. In this paper, we first analyzed the number of passengers of SMRT (Line 5~Line 8) during AM peak hour and then evaluated the number of passengers using toilets at that time. In addition, we calculated the seating capacity of subway stations on SMRT using the difference between the actual number of toilets and the estimated number of ones from the occupancy time of each toilet.

A Study on the Delay Claim in Construction Projects (계약공사기간 연장에 의한 클레임 처리방안)

  • 노병옥;이상범;이호일
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2001.11a
    • /
    • pp.93-98
    • /
    • 2001
  • If the construction delays are occurred during the project execution, the contractual parties should inquire the delay causes and the contractual obligation. Due to the compensation of damages, the interested parties and the contractual parties are placed on the adverse situation. For reasonable of the claim and dispute, the contractual parties are needed the objective and systematic procedure method to analyze the delay. The purpose of this study is to propose a formal process model considering the case of construction delay-claims.

  • PDF

Improve waterproof methods of construction, materials and design to control leakage of underground structure in Singapore (싱가포르 지하구조물 누수에 따른 시공, 재료, 설계 개선방안에 관한 연구)

  • Kim, Dae-Geon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.10a
    • /
    • pp.9-10
    • /
    • 2016
  • The recent situation in the domestic construction companies with a presence in Singapore and pay a lot of money due to leaks underground structuredefects. Therefore, understanding these root causes and to prevent the construction, and to study the materials, design the improvement plan.

  • PDF

A Study of the Administrative Tribunal Cases about Violation of Law of Housing Projects (주거건축과 관련된 건축위법행위 행정심판판례 연구)

  • 김진욱;성기용
    • Journal of the Korean housing association
    • /
    • v.14 no.6
    • /
    • pp.33-40
    • /
    • 2003
  • The purpose of this study was to analyze the architect's Administrative Tribunal cases related to housing projects. We collected the 271 decisions of Administrative Tribunal cases from 1985 to 2001 through the Ministry of Legislation data base. As a conclusion of research, most of cases are caused during design process and supervision of construction which are major roles of architects. We can find out that the number of cases of Administrative Tribunal about housing is 10% more than other types of building. And this situation is more serious in supervision building phase. It proves that housing project has more possibility of violation of law than other types. Because it belong to an economic problems. In Korea, clients of housing project tend to take more profits by taking an illegal acts; like enlargement of a building, construction border violation. illegal construction balcony and so on. And architect who roles to be a supervisor is liable to these problems but he has not much authority and economical benefits. Through this research we can analyze this situation and make know what is problem.

Possessor Agreement as Theta Feature Sharing

  • Cho, Sung-Eun;Lee, Won-Bin
    • Language and Information
    • /
    • v.7 no.2
    • /
    • pp.163-178
    • /
    • 2003
  • Korean displays an interesting construction (so-called possessor agreement construction), where a possessor nominal and its possessum nominal are marked with the same case as shown in the example Mary-ka John-ul tali-lul cha-ss-ta ‘Mary kicked John's leg’ More interestingly, not all possessors in possessive construction are marked the same case with its possessum as shorn in the ungrammatical sentence *Mary-ka John-ul cha-lul cha-ss-ta ‘Mary kicked John's car’. Hence, a simple but non-trivial question arises: In what situation are both possessors and possessums marked with the same case\ulcorner In this paper, we advance three claims: (i) Possessor agreement appears in the situation where entailment is satisfied as follows: If Mary kicked John's leg, it entails that Mary kicked John, (ii) entailment in possessor agreement results from theta-feature sharing; specifically, the whole DP and the possessor DP share the same theta role, and (iii) Possessor nominals are marked with accusative (or nominative) case when they are assigned internal theta role from the predicate directly.

  • PDF

Comparion of Korea-Japan Quality Standards for Grout Materials about PC Member assembly (PC부재 조립용 그라우트 재료 품질 기준의 한일 비교)

  • Kim, Yeon-Ho;Lee, Bum-Sik;Kim, Min-Jun;Kim, Ki-Ho;Jun, Myoung-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.127-128
    • /
    • 2023
  • Recently, OSC (off-site construction) construction has been revitalized as a response to the decline in building quality and productivity due to lack of skilled manpower at construction sites, and PC (precast concrete) construction, a representative OSC construction, is insufficiently applied to public housing.This is the situation.In addition, in the case of general contents appearing in standard specifications, the construction standards for quality assurance remain in the 1990s and do not correspond to the current construction environment.In order to improve the quality of PC member joints, we compared and analyzed Korean and Japanese specifications to establish appropriate standards for PC construction quality control, focusing on the quality of grout used in joints.

  • PDF

Formulation for Producing Risk Level of Each Construction Work (전문 건설업종별 위험도 산정 방법에 관한 연구)

  • Son, Ki-Sang;Gal, Won-Mo;Song, In-Yong;Choi, Jea-Nam
    • Journal of the Korea Safety Management & Science
    • /
    • v.12 no.3
    • /
    • pp.13-19
    • /
    • 2010
  • Risk level for each construction work can be very important factors to establish advanced prevention measures. But it is important how to produce it. There are three different methods to set it up for construction situation. They are as follows; 1) occurrence frequency = the number of accident workers of each work kind / yearly accident workers 2) occurrence frequency = the number of accident workers of each work kind / yearly workers 3) occurrence frequency = the number of accident workers of each work kind / the total workers All these three concepts(=averaged concept)are analyzed. Additionally frequency based on discrete curve, and severity based on continuous curve are also combined for producing risk level with more scientific approach. This risk level can be very useful to make prevention plan or take measures at construction sites. This is study result can change existing risk level concept to new concept of it, namely rail way work and in-water work showed be high risk level and RC work be low risk level, different from the situation which we have thought commonly, so far.