A Study on the Supply and Demand of Technical Manpower in Construction (건설기술인력의 수급효율화 방안 연구)

  • Park Hwan-Pyo;Ji Sang-Wuk;Lee Kyo-Sun;Park Sang-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.3 s.11
    • /
    • pp.58-65
    • /
    • 2002
  • University graduates from construction-related departments are undergoing serious difficulties in getting a job as construction companies are reluctant to employ new personnel due to the depression in the construction industry which has been downscaled in both domestic and overseas markets. In the situation is like this, statistics show that the percentage of employment among the university graduates is less than $25\%$, the unemployment problem in the construction sector has started to demand urgent countermeasures. This report anticipated demand and supply for technical man power in the field of construction in between 2002-2008. For preparation of an effectiveness of supply and demand plan on over-supplied in construction technical man power, this suggested expansion of SOC investment, induced into IT field of unemployed construction manpower, enlargement of overseas construction manpower And this considered an elastic operation of curriculum related to construction, and arranged an excess supply and demand of construction technical manpower, which has been considered to education that will meet with demand of enterprise, etc. on both side of quantity and quality simultaneously.

Developing the Accurate Method of Test Data Assessment with Changing Reliability Growth Rate and the Effect Evaluation for Complex and Repairable Products

  • So, Young-Kug;Ryu, Byeong-Jin
    • Journal of Applied Reliability
    • /
    • v.15 no.2
    • /
    • pp.90-100
    • /
    • 2015
  • Reliability growth rate (or reliability growth curve slope) have the two cases of trend as a constant or changing one during the reliability growth testing. The changing case is very common situation. The reasons of reliability growth rate changing are that the failures to follow the NHPP (None-Homogeneous Poisson Process), and the solutions implemented during test to break out other problems or not to take out all of the root cause permanently. If the changing were big, the "Goodness of Fit (GOF)" of reliability growth curve to test data would be very low and then reduce the accuracy of assessing result with test data. In this research, we are using Duane model and AMSAA model for assessing test data and projecting the reliability level of complex and repairable system as like construction equipment and vehicle. In case of no changing in reliability growth rate, it is reasonable for reliability engineer to implement the original Duane model (1964) and Crow-AMSAA model (1975) for the assessment and projection activity. However, in case of reliability growth rate changing, it is necessary to find the method to increase the "GOF" of reliability growth curves to test data. To increase GOF of reliability growth curves, it is necessary to find the proper parameter calculation method of interesting reliability growth models that are applicable to the situation of reliability growth rate changing. Since the Duane and AMSAA models have a characteristic to get more strong influence from the initial test (or failure) data than the latest one, the both models have a limitation to contain the latest test data information that is more important and better to assess test data in view of accuracy, especially when the reliability growth rate changing. The main objective of this research is to find the parameter calculation method to reflect the latest test data in the case of reliability growth rate changing. According to my experience in vehicle and construction equipment developments over 18 years, over the 90% in the total development cases are with such changing during the developing test. The objective of this research was to develop the newly assessing method and the process for GOF level increasing in case of reliability growth rate changing that would contribute to achieve more accurate assessing and projecting result. We also developed the new evaluation method for GOF that are applicable to the both models as Duane and AMSAA, so it is possible to compare it between models and check the effectiveness of new parameter calculation methods in any interesting situation. These research results can reduce the decision error for development process and business control with the accurately assessing and projecting result.

A Study on the Application of Information Classification for Integration of Construction Information in Construction Phase (시공단계의 건설정보 통합을 위한 분류체계 적용에 관한 연구)

  • Kim Jin-Young;Kim Yong-Gu;Han Choong-Hee;Kim Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.450-455
    • /
    • 2002
  • Construction market situation has been changed quickly in the 21st century. One is a large variety of information, the other is the development of IT technology among the rest of the change. Accordingly, it is very important that information is managed systematically and made good use of broadly in proportion to the increase of information volume. Therefore, the purpose of this study is to propose a applicable classification system in the construction phase. First of all, the Construction Information Classification proposed by the government is studied to apply the actual work and to build a applicable construction information classification for construction project. A base of the applicable classification system is the Construction Information Classification, SMM and Materials classification(Public Procurement Service). The applicable classification system to control and manage the construction information is consist of the 4 types : Facility classification, Element classification, Work classification, Resource classification (Materials, Equipment, Labor).

  • PDF

Study on a Applicability of the Low Noise Labeling System for a Construction Machinery (건설기계 저소음표시제도 도입에 관한 연구)

  • Gu, Jinhoi;Lee, Wooseok;Seo, Chungyoul;Lee, Jaewon
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.23 no.11
    • /
    • pp.982-986
    • /
    • 2013
  • The noise emitted from construction machinery has long been a cause of environmental disputes, especially to the nearby residents. In 2008, the Ministry of Environment adopted the construction machinery noise labeling system to encourage the development of the low noise construction machinery. After the implementation of the noise labeling system of the construction machinery, the noise emitted from the construction machinery has been decreased over the six years. But, as the quality of life improves, a growing number of people desire more comfortable and quite living environment. Under the situation, new systems like the low noise labeling system are considered to encourage the development of the low noise construction machinery. In accordance with the low noise labeling system, the construction machinery satisfying the standard of low noise are qualified to attach the low noise label in front of the products. Thus, the product qualified the low noise certification will be incentivized by the choice of the consumer. In this paper, we have studied the necessity of the low noise labeling system for the construction machinery and the considerations to adopt the low noise labeling system of construction machinery. And we have studied appropriate criterion to judge the low noise construction machinery. The considerations studied in this paper will be helpful to adopt the low noise labeling system of construction machinery in the future.

Study for Architectural Standard Details Based On BIM Information Framework (BIM 표준프레임워크 기반의 건축 표준상세도면 구축방안)

  • Kwon, Soon-Ho;Lee, Woon-Jae;Jo, Chan Won
    • Korean Journal of Computational Design and Engineering
    • /
    • v.18 no.2
    • /
    • pp.93-103
    • /
    • 2013
  • In the situation where there should be a gap between the design environments of 2D drawing and 3D BIM modeling, it is unavoidable aspect to face confusion caused by parallel usage of both technologies unless the project delivery systems are entirely upgraded to 3D. Therefore, it is critical to make efforts to minimize this confusion. Meanwhile, detailed drawings have very important roles in the construction process because they do not only concretely express construction methods for a given design plan but also provide basis for quantity takeoff and construction cost estimation etc. This paper suggests a plan to standardize detailed information based on BIM standard framework in order to make BIM realize the information. In the short term, this plan provides improved environment where both BIM and CAD technologies can be applied and, in the long term, it provides bases for BIM to replace CAD technology.

A Experimental Study of Mechanical properties in mud flat mortar mixed with High-range Water reducer (고성능감수제를 혼입한 갯벌모르타르의 역학적 특성에 대한 실험적 연구)

  • Lee, Heung Yeol;Kim, Hui Doo;Lee, Ji Sun;Yang, Seong Hwan
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.115-116
    • /
    • 2015
  • Since concrete has evolved to the development of the quality and performance there currently being used civil engineering, as the most important material in the construction sector. But the discovery of alternative building materials and indiscriminate use is negligible. So that is the situation facing the shortage of natural aggregate. Accordingly, this study reviewed the mechanical properties by replacing the aggregate through the mud flat of eco-friendly materials and analyze the usability by adding a high-performance water reducer for promoting workability.

  • PDF

A Study on the Properties of Mix Design for Cementitious Material used in Modern Architecture (근대 건축에 사용된 시멘트계 재료의 배합 특성)

  • Lee, Chan-Young;Ahn, Jae-Cheol;Song, Jong-Mok;Kang, Byeung-Hee;Kim, Ki-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.215-216
    • /
    • 2012
  • The purpose of this study is to analyze the situation and feature of construction technology by analysis properties and the mixture proportion of a reinforced concrete building from the modern domestic and to leave technological records for the optimal maintenance of the cultural heritage. The study says, the case of the 1:3:6 mix concrete has been standard regardless of the kind of structures after the concrete has being used in earnest, However, The strength range is big from Water-Cement ratio difference according to the concrete casting site.

  • PDF

Labor Productivity Model on Construction Industry Using System Thinking (기술사 마당 - 기술자료 - 시스템 사고(思考)를 활용한 건설 산업의 노동생산성 모델)

  • Jang, Ho-Myun
    • Journal of the Korean Professional Engineers Association
    • /
    • v.42 no.4
    • /
    • pp.62-67
    • /
    • 2009
  • Labor productivity issues within the construction industry are receiving increasing attention. With the improvement in the standard of living, domestic laborers are avoiding 3D (Difficult, Dirty, and Dangerous) jobs by degrees. Because of this situation, the problem of insufficient labor is exacerbating in several basic industries. In particular, insufficient labor is a serious problem in the construction sector, where the workers are ageing and labor costs are increasing. In this study, we adopt a systematic approach to identify factors that influence labor productivity and analyze the causality between the factors and their ripple effects with the aim that the results of the study will help improve labor productivity and ensure its effective management.

  • PDF

Development of Cost Data Prototype in Reinforced Concrete work based on Productivity Analysis (생산성 분석을 통한 철근콘크리트공사의 Cost Data Prototype 개발)

  • An, Soo-Bae;Ji, Seong-Min;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.135-136
    • /
    • 2011
  • A standard of estimation is used as a basis for estimating the predetermined amount of public construction. However, they raise several points of reasonable labor to be presented to a standard of estimation. For this reason, it is difficult to make a reasonable and efficient estimation of the costs, and this situation presents an urgent need for an accurate way of making such a calculation.This study analyzed the productivity of reinforced concrete work by the CYCLONE model, and the estimated optimal labor through sensitivity analysis, and presented the model on the number of optimal labor through sensitivity analysis.

  • PDF

On-Site Manpower Increasing Impact on Labor Productivity

  • Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.5 s.27
    • /
    • pp.139-147
    • /
    • 2005
  • During a typical construction project, a contractor nay often find that the time originally available or normally expected to perform its work has been severely reduced. To finish the project by the completion date, the contractor is forced to find a way to speed up the progress of its work to compensate for the reduction in available time. The most frequent initial reaction of contractors to this situation is to increase on-site manpower by working longer time (overtime), adding more workers (overmanning), or implementing shift work (shift work) to increase the rate of progress. The goals of this study were to investigate how these three methods affect labor productivity and to quantify their impact on labor productivity by analyzing real project data collected from sheet metal contractors and mechanical contractors in the US.