1 |
Sun, H. S., 2009, Study on Effective Noise Management Plan of Construction Site, Transactions of the Korean Society for Noise and Vibration Engineering. Vol. 19, No. 2, pp. 176-183.
과학기술학회마을
DOI
ScienceOn
|
2 |
Gu, J. H., 2012, Regression Analysis of an Excavator Sound Power Level, Transactions of the Korean Society for Noise and Vibration Engineering, Vol. 22, No. 3, pp. 203-207.
과학기술학회마을
DOI
ScienceOn
|
3 |
Noise and Vibration Management Act, 2013, The Ministry of Environment, p. 128.
|
4 |
Theil, H., 1961, Economic Forecasts and Policy, Holland, Amsterdam: North.
|
5 |
Ministry of Environment, 2009, Measurement Method of the Sound Power Level for Construction Machinery(Notification No 2009-222), Ministry of Environment.
|
6 |
KS I ISO 3744:2002 Acoustics-Determination of Sound Power Levels of Noise Sources Using Sound Pressure-Engineering Method in an Essentially Free Field Over a Reflecting Plane.
|
7 |
2002, Criteria of Low Noise Construction Machinery, Korea Environmental Industry & Technology Institute, EL653, p. 1.
|
8 |
Raymond, H. M., 2000, Classical and Modern Regression with Applications, Duxbury Press, Second Edition.
|