• Title/Summary/Keyword: construction situation

Search Result 1,224, Processing Time 0.028 seconds

Long-Life Demonstration Housing Infill Construction : Theory and Practical Limits (장수명 실증주택 인필 시공: 이론과 현실적 한계)

  • Kim, Soo-Am;Yang, Hyeon-Jeong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.89-90
    • /
    • 2019
  • The purpose of this study is to clarify the difference between design and construction conditions based on theory for support (S) and infill (I) distinction and separation in long-life housing, and to search for future direction. To do this, the SI theory is summarized and the construction situation is examined in the demonstration house and the differences and limitations are analyzed. In order to realize SI separation in Korea, it is necessary to set the position of pipe shafts for sewage and drainage, buried in the structure and Ondol layer of the private pipes, buried various wires in the inner wall, and fixing the position of the inner wall.

  • PDF

A Preliminary Study for Reformation(or Improvement) of Construction Safety Inspection Systems (건설현장 안전점검체계 개선을 위한 기초연구)

  • Han, Jae-Goo;Lee, Soo-Kyong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.104-105
    • /
    • 2014
  • Construction safety inspections come in a wide variety of types. The types of inspection are, 1) a self-checking and a periodical-checking by contractors, 2) a site inspection by Ministry of Land, Infrastructure and Transprt (MOLIT) or licensing organizations and 3) others. In this situation, there are needs to determine fuction of the safty inspection and roll of stakeholders for the inspection to avoid unnecessary duplication and serious omission. The result of this study indicates a guide line for improving of consturcion safety inspection systems as a fundamental research.

  • PDF

Application of BIM in Public Construction Project : Focused on Delivery System (공공 건설프로젝트 BIM 적용 효율적인 발주방안에 관한 연구)

  • Cho, Sung;Cho, Yong;Lee, Kyung-Ha;Paek, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.203-207
    • /
    • 2009
  • These days Construction Industry is one of the major industry in public project and it has many problems. And Construction Industry highly respond to a chage of IT, politics, economy, domestic and international situation. And it causes an uncertainty in Korea economy. The goal of this paper is showing the efficiency application of BIM in Public Project. And this paper follow three steps. First, these day's trend of BIM and delivery method are researched. Second, major factors are thrived to appreciating BIM Third, delivery method based on BIM is proposed. Major factors of delivery method are researched to make guide line of delivery method in public project in the future.

  • PDF

A Study on the Change of Urban Spatial Structure and Transformation of circumjacent Lot by Course of the Construction of Railroads and the Dismantlement of Eupseong in the Early 20th Century (20세기 초 철도부설과 읍성해체에 따른 도시공간구조와 주변 필지 변화에 관한 연구)

  • Kim, Dae-Jung;Cho, Jae-Mo
    • Journal of architectural history
    • /
    • v.28 no.2
    • /
    • pp.31-40
    • /
    • 2019
  • Considering the situation in the early 20th century when the existing urban system centered on urban areas began to change, the biggest factors causing urban structural changes in urban areas are construction of railroad and urban dismantling. The change process of Eupseong, in the microscopic viewpoint, can be understood as a process of change in the course of dismantlement of town's demarcation, improvement of accessibility and urban expansion due to the construction of railroads, process of urban expansion following the crumbling boundaries and structural changes. This study aimed to look at the transformation process of the Eupseong in the early 20th century, focusing on the demolition of the castle and the railway construction from a microscopic point of view of city.

Design Direction of a Big Data based Performance Monitoring System using Quality Function Deployment (QFD를 이용한 빅 데이터 기반 성과 모니터링 시스템의 설계방향 도출)

  • Kim, Chang-Won;Kim, Taehoon;Seo, Junghoon;Lim, Hyunsu
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.255-256
    • /
    • 2021
  • The performance measurement of construction projects has traditionally been evaluated as a prerequisite for successful project completion. Considering this importance, the UK and the US are operating quantitative performance measurement systems for construction projects. However, in the case of Korea, there is a limit to the use of existing methods due to the limitation of data collection. Recently, in consideration of the domestic situation, research is being conducted to measure the quantitative performance of a project by using big data including progress and project attribute information. Therefore, this study aims to present the design direction of a performance monitoring system using Quality Function Deployment.

  • PDF

A Study on the Additional Properties Management Method for Building Code Automated Checking by BIM (건축인허가 법규에 따른 BIM 정보 관리 방안 연구 )

  • Kim, Byung-Joo;Kim, Gyu-Yong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.211-212
    • /
    • 2023
  • Building Information Modeling (BIM) design has been mandatory in Korea since 2016, and it has been gradually expanding in the industry, with a slow attempt to apply it in remodeling constructions. This is because Korea is facing a situation where many buildings are over 30 years old and require remodeling or reconstruction. The remodeling industry is also a growing market, as it saves construction time and cost compared to reconstruction. BIM is an ideal technology element for a competitive remodeling construction, as remodeling constructions face a complicated construction process from the start, including demolition, maintenance, and reinforcement to save the change process. However, there are still limitations in applying BIM to remodeling constructions, due to considerations of the existing building and the complicated requests of the inhabitants. BIM still has technical and environmental limitations for general use. In this study, I analyzed BIM application cases from existing studies and suggest what improvement points should be strengthened.

  • PDF

A Study on Current Housing Situation and Residents' Perception of Public Rental Housing and Private Rental Housing (민간 건설 공공임대아파트와 일반 임차아파트 거주자의 주거실태 및 주거의식에 관한 연구)

  • Kim, Young-Joo;Kim, Young-Tae
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2006.11a
    • /
    • pp.497-502
    • /
    • 2006
  • The main purpose of this study was to identify the problems and the effectiveness of public rental housing constructed by private construction company. To accomplish this, the current situation and the residents' perception were compared between public rental housing and private rental housing through the analysis of existing data collected in March 2005 by Gallup Korea and submitted to Korea Housing Corporate. The results showed that public rental housing contributed to the housing stability for the low income households. Most of the respondents were satisfied with their current housing. The burden of housing cost such as amount of Chunse deposit, however, still needs to be lessened

  • PDF

Current situation and possible management practice in future of rural water conservancy in Hai River Basin

  • He, Huining
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.191-191
    • /
    • 2016
  • Hai River Basin is one of China's major agricultural areas, with a huge rural population. Water conservancy is of great importance in this region. There are three integral elements in managing rural water resources: the consideration of current situation, the adoption of effective management measures, and the projection of future needs. In this study, we provide an in-depth investigation of current water resources situation of Hai River Basin. Five issues are analyzed: (1) the construction of conservancy projects; (2) the irrigation of farmland; (3)the safety of drinking water; (4)the protection of water environment; and (5)the model of management practice. Existing problems are diagnosed and possible solutions are discussed. Finally, a summary is made for managing water resources and meeting future needs.

  • PDF

A Study on the development of Construction Field Management Model based on BIM (BIM기반 건설현장 관리모델 개발에 관한 연구)

  • Jun, Young-Woong;Lee, Myoung-Sik
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.9 no.3
    • /
    • pp.69-76
    • /
    • 2009
  • The importance of efficient construction site management has been growing as the amount of construction information increases which is used in the growing construction site. Accordingly in this study, we are trying to find out the application situation and possibility of BIM through theoretical examination and domestic & overseas case study of BIM and we are trying to suggest the way of efficient construction site management formulation through implementation phase-oriented and cooperation entity-oriented analysis in the construction site. We found out that it was possible to minimize time loss and financial loss by visualizing 2D drawings through 3D modeling of target building by applying BIM and that it was possible to improve accuracy of budget planning with quantitative information of 3D model, to plan construction process with more confidence due to accurate architectural information of drawings and quantitative information, and to manage cost and quality through process management based on construction information acquired by BIM including object information by part. It is concluded that we can improve efficiency of construction management between field and each cooperating entity by integrating and linking BIM information through this process.

  • PDF

A Study on the Actual Condition Analysis and Improvement of Rebar Work in Korean Building Construction (국내 철근공사 실태분석 및 개선방안에 관한 연구)

  • Park, U-Yeol;Kim, Gwang-Hui;Gang, Gyeong-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.3
    • /
    • pp.83-91
    • /
    • 2004
  • With labor shortage and high-wage era, the construction cost is rising and the construction business is dull, demanding the construction environment of Korea to raise profitability through major cost savings and rationalization of construction management. However, although reinforcing bar(rebar) work, which greatly effects the building's safety, endurance, and construction time, is an important phase in construction, it holds serious problem of quality and productivity deterioration due to its characteristic of intensive-labor and maintaining of old work methods resulting in poor management, and costs increase. Therefor in this study to investigate current situation and problems of rebar work and to find methods of betterment, a survey was conducted to site engineers and individuals in division of cost estimate of domestic construction company. The survey questions were on the subjects of (1) calculating rebar quantity, (2) ordering and procurement, (3) rebar cutting and bending, and (4) rebar work management. Method of improvement was sought by analyzing the results of the survey