• 제목/요약/키워드: construction scale

검색결과 2,873건 처리시간 0.025초

소규모 건축공사 안전관리용 애플리케이션 프로토타입 개발 (Development of an Application Prototype for Small-Scale Construction Safety Management)

  • 김재엽;임형은;김은호
    • 대한건축학회연합논문집
    • /
    • 제21권6호
    • /
    • pp.65-71
    • /
    • 2019
  • In Korea, there is a lack of adequate safety management for small-scale construction work, particularly when compared to large-scale construction projects. The number of construction disasters is also higher on small-scale construction sites. In this regard, this study aimed to develop the application prototype to support the safety management of small-scale construction projects. The major findings of the research are as follows. 1) About 60% of construction disasters and death occurred on small-scale construction sites over the last two years. In addition, institutional support and costs for safety management were found to be insufficient. 2) The items of the application for the small-scale construction safety management were constructed on the basis of the safety management of large-scale construction work. The contents of the application were confirmed based on a survey of small-scale construction project managers. 3) The application algorithm was developed with a focus on the roles of management subjects and information exchange. For transition from the application prototype presented in this study to a commercial product, further research needs to be conducted regarding the reflection of user requirements and application management subjects.

소규모 시공현장 적정공사비 확보를 위한 원가기준 마련 연구 (A Study on Cost Standards for Securing Appropriate Construction Costs for Small-Scale Construction Sites)

  • 오재훈;안방율
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.347-348
    • /
    • 2023
  • In construction sites, small-scale construction quantities or limited work hours below the daily work volume may occur due to on-site conditions. For small-scale quantities, the input of equipment and labor is designed based on an hourly basis in the invoice, resulting in a difference from the actual cost. In this study, we aim to explore solutions from the perspective of construction cost standards to secure appropriate construction costs for small-scale and time-limited construction sites. Firstly, to preserve the basic construction costs on-site, we established standards where half the cost would be charged for construction quantities below four hours and a full day's cost would be designed for construction quantities between four to eight hours. Additionally, realistic construction cost calculation standards are expected to be provided by realizing a surcharge rate for work hour limitations to secure appropriate construction costs.

  • PDF

대공간 건축물 지붕공사의 시공기법선정을 위한 기초연구 (A preliminary Study on Selection of Construction Method for Roofing work in Large-Scale Structures)

  • 김대길;홍주영;이명도;엄진업;김대원
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.247-248
    • /
    • 2016
  • Globally the interest of large-scale structure has been increasing for the use in various social and cultural events. However various problems for building large-scale structure in South Korea are expected in terms of construction method and site management due to the lack of experience. Construction method and planning significantly affects on making decisions. There are only theoretical approach for constructing large-scale building in domestic with the limited experience of constructing constrained size structure. Through Analytic Hierarchy Process with experts, derived decision factors mostly used construction method in construction of large-scale structure. Derived factors from this study will support making decisions for field management in constructing large-scale structure.

  • PDF

국내 소규모 건설현장의 전기설비 및 작업환경 분석 (Analysis of Electrical Equipment and Work Environment for Domestic Small-Scale Construction Site)

  • 김두현;황동규;김성철;강신욱;최상원
    • 한국안전학회지
    • /
    • 제29권4호
    • /
    • pp.42-47
    • /
    • 2014
  • This paper is aimed to investigate and analyze of characteristic for electrical equipment and work environment for the small-scale site. In order to investigate and analyze electrical equipment and work environment for preventing electric shock disaster in construction sites, 50 small-scale construction sites and 12 large-scale construction sites are selected. This paper completed site investigations of low-voltage equipment and the portable electric machine and equipment in 12 large-scale construction sites and 50 small-scale construction sites. The findings were about the electric shock environment relevant to the ground-relevant equipment, the panel board, the protection tools, the sockets, the temporary wiring system, the portable and movable electric machines and equipments in small-scale construction sites. Finally, this study analyzed the domestic and foreign relevant standards and regulations and these findings can be utilized as educational data warning electric shock risk caused by electric equipment in small-scale construction site.

A STUDY ON THE PROCESS OF LARGE-SCALE REPAIR OF A CONDOMINIUM

  • Seki, Eiji;Akiyama, Tetukazu
    • 한국주거학회:학술대회논문집
    • /
    • 한국주거학회 2002년도 추계학술발표대회
    • /
    • pp.295-300
    • /
    • 2002
  • Since the contents of large-scale repair of a condominium were various, a plan document was not prepared. The owners association of the condominium has given priority to decision-making of price priority over quality. Examination is not performed about the contents of the construction supervision business, which checks whether suitable construction is performed, either. On the other hand, the know-how for builders, such as decision of the process plan under which the repair work lessens influence to the safety and life as much as possible since the place where the resident is living turns into a construction site, and selection of a method of construction, is just going to ask. It is an important subject how the structure of the construction contractor selection, which considered quality, is built. Then, this research focuses on large-scale repair construction of the condominium, and arranges the actual condition of a series of processes from plan document creation to construction supervision. The method of research collects the construction documents of the condominium that carried out Barge-scale repair construction. Next, collection arrangement of the data of construction builder selection is carried out. The method of the construction builder selection of those other than a construction price is examined. The method of quality control of large-scale repair construction is examined.

  • PDF

소규모 건설현장의 안전사고 예측을 위한 딥러닝 알고리즘 기반의 예측프레임워크 제안 (Proposal of a Prediction Framework Based on Deep Learning Algorithm to Predict Safety Accidents at Small-scale Construction Sites)

  • 김지명
    • 한국건축시공학회지
    • /
    • 제23권6호
    • /
    • pp.831-839
    • /
    • 2023
  • 건설산업의 재해율은 다른 산업에 비해 매우 높다. 그 이유로 다른 규모에 비해 상대적으로 더 사고에 취약한 소규모 건설현장의 높은 재해발생율을 꼽고 있다. 최근 난이도 높은 도심 건설공사의 증가, 악천후의 증가 등으로 앞으로 소규모 건설현장의 사고 발생 위험은 더 커질 것으로 예상된다. 따라서 소규모 건설현장의 사고를 사전에 예측하고 이를 통한 사고 예방 및 저감은 건설산업의 재해율을 낮추기 위해 반드시 필요하다. 따라서, 본 연구에서는 소규모 건설현장 사고를 예측하기 위한 Deep Neural Network Algorithm 기반의 사고 예측 모델 개발 프레임워크를 제안하였다. 본 연구의 프레임워크와 결과를 활용하여 소규모 건설현장 안전관리의 가이드 라인으로 활용이 가능하며, 궁극적으로 소규모 건설현장에서의 사고 위험을 줄임으로써 지속가능한 건설사업관리에 기여할 수 있을 것이다.

EVALUATING CRITICAL SUCCESS FACTORS FOR ACCURATE FIRST COST ESTIMATES OF LARGE-SCALE CONSTRUCTION PROJECTS

  • Jin-Lee Kim;Ok-Kyue Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.354-360
    • /
    • 2009
  • The demands for large-scale construction projects such as Mega-projects are largely increasing due to the rapid growth of increasing populations as well as the need to replace existing buildings and infrastructure. Increasing costs of materials, supplies, and labors require the first cost estimates at the preliminary planning stage to be as accurate as possible. This paper presents the results obtained from the survey on evaluating nine critical success factors that influence the accurate first cost estimates for large-scale projects from practical experiences. It then examines the current cost structures of construction companies for large-scale projects, followed by the causes for cost and schedule overrun. Twenty completed surveys were collected and the Analytic Hierarchy Process was applied to analyze the data. The results indicate that technology issues, the contract type, and social and environmental impacts are the significant leading factors for accurate first cost estimates of large-scale construction projects.

  • PDF

공사규모에 따른 공공건축물 공사비의 산정방법 (Cost Estimating Method of Public Building Construction through Construction Scale)

  • 임진호;박준모;김옥규
    • 한국건축시공학회지
    • /
    • 제15권3호
    • /
    • pp.307-316
    • /
    • 2015
  • 공공건축물공사의 실적공사비제도에서 공사규모에 대한 건축공사비 차이가 크게 나타나므로, 산정방식에서 많은 문제점으로 제기된다. 이에 공사규모에 따라서 선별적, 차등적으로 적용할 예측모형의 개발이 필요하다. 이에 본 연구는 조달청에서 2011~2012년에 발주한 이미 준공된 42개 현장의 실적자료에서 공사규모 $5,000m^2{\sim}20,000m^2$으로 선정하여, 회귀분석을 통해서 추정된 모형을 도출하였다. 이를 근거로 신규공사에 적용하여 검증함으로써 합리적인 건축공사비 예측모형을 제시하였다.

Comparative Performance Analysis of Robot-based Automated Construction System Using a Real Scale Test Project

  • Lee, Ung-Kyun
    • 한국건축시공학회지
    • /
    • 제15권3호
    • /
    • pp.339-349
    • /
    • 2015
  • A large-scale research project to develop a robot-based automated building construction system for steel structures was successfully conducted in South Korea. This paper discusses the results of the real-scale test and the key lessons gained from the testing process. The system was assessed in terms of system productivity, construction cost, quality control, and safety improvements. While the productivity of the automated system showed an improvement of about 9.5%, the construction cost was about six times higher than that of the conventional method. The field test also indicated that the automated system requires more on-site quality control measures. However, because the system can eliminate the causes of various safety accidents, safety levels might be expected to be improved significantly. It is expected that this paper will provide knowledge and insight for developing new systems, and the results of the real-scale test might be useful for other researchers and similar research projects in the future.

Prediction of City-Scale Building Energy and Emissions: Toward Sustainable Cities

  • KIM, Dong-Soo;Srinivasan, Ravi S.
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.723-727
    • /
    • 2015
  • Building energy use estimation relies on building characteristics, its energy systems, occupants, and weather. Energy estimation of new buildings is considerably an easy task when compared to modeling existing buildings as they require calibration with actual data. Particularly, when energy estimation of existing building stock is warranted at a city-scale, the problem is exacerbated owing to lack of construction drawings and other engineering specifications. However, as collection of buildings and other infrastructure constitute cities, such predictions are a necessary component of developing and maintaining sustainable cities. This paper uses Artificial Neural Network techniques to predict electricity consumption for residential buildings situated in the City of Gainesville, Florida. With the use of 32,813 samples of data vectors that comprise of building floor area, built year, number of stories, and range of monthly energy consumption, this paper extends the prediction to environmental impact assessment of electricity usage at the urban-scale. Among others, one of the applications of the proposed model discussed in this paper is the study of urban scale Life Cycle Assessment, and other decisions related to creating sustainable cities.

  • PDF