Earned Value based Construction Project Control System (EV기반 공사관리시스템 기능의 비교분석 연구)

  • Lee Yoo-Seob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.168-174
    • /
    • 2004
  • Project plan and control is a highly skilled task which is vital for business success, and Project control systems are important for successful project execution. To support construction process management effectively, an integrated cost and schedule control function is required to collect quality data in a timely manner and to provide quality historical data for future planning of new projects. In Korea construction industry, the development and implementation cases of a project control system which to efficiently support construction project planning and controlling processes, have been increased to ensure a project success and the profitability of a construction company. To contribute to improving practical effectiveness of a project control system, the paper reviewed and analyzed the current trends and functional features of current project control systems. And it also described the pending issues and their solutions faced on previous project control systems.

Predicting Project Performance by Analyzing Key Success Factors on Project Fiancing(PF) Development (건설 프로젝트 파이낸스(PF) 사업의 성공영향요인(KSF) 분석을 통한 사업성과 예측 모델)

  • Lee, Dong-Gun;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.5
    • /
    • pp.127-137
    • /
    • 2014
  • Project Financing (PF) development project is the type which influences national economy and building industry largely because it is exerted by using borrowed money from many kinds of investors and huge amount of financial raising. Many domestic PF projects are focused mainly on the profit maximization lacking in a sufficient feasibility study. Nowadays many projects are suspending due to the global finance debacle and stagnation of real estate industry. Therefore, in this paper, risk factors of PF project are deducted and Key Success Factors (KSFs) are derived through Factor-Analysis and qualified using Fuzzy-AHP method. And through the evaluation of the derived success factors in real projects, a strong correlationship has been identified between the score of each PF success factor and the level of success and/or expected rate of return (ROR). So, the result of this paper can help decision makers of the PF projects make a better decision and give a meaningful guidance in achieving successful PF projects.

Factors That Affect Project Time and Cost Performance during Highway Construction Using Incentive/Disincentive Provisions

  • Pyeon, Jae-Ho;Park, Moonseo;Jung, Sangsun;Park, Taeho
    • Land and Housing Review
    • /
    • v.11 no.4
    • /
    • pp.115-124
    • /
    • 2020
  • Incentive/Disincentive (I/D) contract is designed for minimizing any disruption of traffic flow in road construction projects. I/D contracting projects have been evaluated with regard to time and cost performance in various states, more than 35 states. However, construction project managers and planners have little understanding of the project factors that affect the project time and cost performance of highway construction projects using I/D regulations. Therefore, the purpose of this research is to find factors that affect I/D project success or failure to improve the decision-making process for the implementation of I/D projects. In order to achieve the objectives of this research, the researchers collected I/D road construction project data from FDOT and performed evaluation for each collected project. Then, project data analysis to identify key factors that affect I/D project performance was performed. In conclusion, five significant factors for project time performance and six significant factors for project cost perfornace were identified and summarized.

STRATEGIC ALLIANCE IMPLEMENTATION STATUS AND IMPACT ON PROJECT PERFORMANCE

  • Bon-Gang Hwang;Young-Ki Huh
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.212-217
    • /
    • 2009
  • Strategic alliance is a proactive management process that integrates and optimizes value-added services of each party to best achieve business objectives of all parties within the relationship. Under the current competitive global environment, strategic alliance can produce a "Win-Win" situation and thus change paradigm that has resided in the construction industry. While many studies revealed the significance of alliance relationship in the industry, its impact on project performance has rarely been analyzed. Using the data obtained from 661 construction projects in the Construction Industry Institute database (359 projects from 38 owners and 302 projects from 29 contractors), this study first diagnoses the implementation status of strategic alliance at both project and company levels. Then, its impact on project performance is quantified and discussed. The descriptive analysis performed in this study revealed that an average of 79% of owner companies and 69% of contractor companies have ever implemented strategic alliance into at least one of their projects. However, both owner and contractor companies did not always use the strategy for all or their projects. Only 33% and 30% of projects reported by owners and contractors have been completed under alliance relationship, respectively. Analyzing the alliance impact on project performance, this study also establishes that strategic alliance positively affects project performance of both owners and contractors while owners should consider and control the level of its use for their projects. Recognizing and understanding the benefits from strategic alliance will be a starting point to produce mutual success among project participants, ultimately allowing the construction industry to go forward to a sustainable industry that transfers success from one project to the other.

  • PDF

Analyzing the Priority of Leadership Elements for Project Manager of Building Construction Project

  • Kim, Jin-Dong;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.1
    • /
    • pp.31-41
    • /
    • 2012
  • In construction, the outcome of work depends on the leadership of the project manager, and as a result this has been emerging as an important factor. The purpose of this study is to analyze the main elements of leadership that are essential for project managers, and to rank these elements in order of importance. In this study, leadership and its elements are reviewed through reviewing the literature, and the main elements and their relative importance for project managers were analyzed through questionnaire survey of project managers, contractor engineers, and subcontractor engineers. Through this survey, it was found that the project manager's leadership had a significant influence on the success of a construction project, and this study revealed that the key elements of leadership for project manager could be ranked in the order of resolution, responsibility, and reliance.

Developing an Owner's Project Evaluation Framework for Construction Management (프로젝트 관리자로서의 발주자 사업수행평가 프레임워크 개발)

  • Kim, Jonghoon;Lee, Hyun-Soo;Park, Moonseo;Park, Sanghyuk;Lee, Inbeom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.130-137
    • /
    • 2016
  • Owner's participation on a construction project can alter the success of a construction project. In general, success of a construction project is measured by project schedule and cost decrease without considering the role an owner has in a project. As a result, this research developed a framework for the project evaluation form and after extracting a total of 9 project critical success factors (CSF) and 27 sub-CSF. AHP method was utilized to evaluate the importance factor of each CSFs. Setting a goal for each CSFs at the beginning of a project and comparing the values at the completion of the project utilizing the project evaluation form will allow a systematic evaluation and management of a project. Solution Map was introduced and Solution Tool was suggested in order to utlize the evaluation results effectively. In the future studies, various project cases needs to be supplemented for further verification and a solution based on the evaluation result needs to be developed that can be applied to construction projects.

Estimating Maintenance Cost by Actual Database Based on Operation in Sewage Treatment Plant (하수처리장 실적데이터베이스를 활용한 유지관리비용 예측)

  • Lee, Tai-Sik;Kwak, Dong-Koo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.10
    • /
    • pp.2803-2809
    • /
    • 2009
  • For a successful construction project not only construction engineering and project management technology but also economic evaluation technique is required. Design and construction technologies are necessary to receive a project order. However, construction management technology which can be apply from the project initial phase to the project operation and management phase is required to create a benefit from the project. Construction management technology is one of the effective factors for project success. Economical and efficient cost management from the planning phase influences the project success. This study investigated cost flow and cost factors of domestic Sewage Treatment Plant project for systematic analysis of cost items following the entire project phase. Particularly, data modeling based on domestic Sewage Treatment Equipment maintenance cost DB was performed, and maintenance cost estimation trend line is suggested using Monte carlo Simulation Method to decrease uncertainty of actual results DB and for feasibility study. Korea Academia-Industrial cooperation Society. The Korea Academia-Industrial cooperation Society. The Korea Academia-Industrial cooperation Society. The Korea Academia-Industrial cooperation Society.

A Study of Success Factors Influencing Each Phase of ERP System Implementation (전사적 자원관리 시스템 구현의 성공요인: Markus의 단계별 성공요인에 관한 실증분석)

  • Lee Jae-Jung
    • The Journal of Information Systems
    • /
    • v.15 no.2
    • /
    • pp.153-171
    • /
    • 2006
  • The objective of this research project is empirically investigating factors influencing EPP system implementation based on the degree of volatility of business environment. The results show that computes with low volatility have successfully implement ERP system compared to companies with high volatility. This research project also identified success factors of each phased chartering phase, executive participation sound assessment of business condition, good understanding of ERP system and carefully constructed case are identified as success factors. During project expenditures, participation of various groups, technical resources, prefect and change management are found to be important for successful construction. Trained users, integration of systems, well-designed process and technical and human resource are found to be success factors during shakedown phase. Managers commitment technical infrastructure, system flexibility, and adequate resource for maintenance and renewing system are identified as success factors of onward and upward phase.

  • PDF

Success Factors for Partnering Implementation in Construction: a Survey from Vietnam

  • Kim, Soo Yong;Le-Hoai, Long;Dang, Chau Ngoc
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.568-572
    • /
    • 2015
  • Traditional procurement methods have revealed many disadvantages in construction fields such as the adversarial relationships between stakeholders. After several decades of application, partnering has shown to be an innovative arrangement that helped to reduce many problems existing in the traditional arrangement. In Vietnam, partnering has been applied for construction projects since the construction industry was facing many new challenges emanated from the global integration and economic booming. Partnering is rather new, so it needs to gain a better understanding of the new concept. This paper has identified twenty eight success factors for partnering in the Vietnamese construction industry. Five factors are considered critical to partnering success including financial security, commitment from top management, mutual trust between parties, adequate resources and effective communication. The findings could help construction practitioners to deploy the innovative procurement type and would also contribute to the global knowledge.

  • PDF

Measuring of the Performance of a Construction Management Project from Viewpoints of Project Participants -Focusing on Owner, Construction Manager, Designer and Constructor- (건설사업 참여주체(발주자, CMr, 설계자, 시공자) 관점에서 건설사업관리 성과측정에 관한 연구)

  • Ahn, Eun-Jin;Yoo, Byeong-Gi;Lee, Yoon-Sun;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.194-205
    • /
    • 2008
  • The production process of construction industry is different from thing of the general manufacturing, likewise various participants make temporary teamwork for success of the project through sharing of information. But, the each role of participants is Individually changed to step in construction process stage and moreover it has complicated, entangled interests. The CM(so it called Construction Management as an abbreviation word) system was inducted for the effective management and operation of construction project. The key of the CM success depends on the cooperative relationship relation to major participants. There are lots of studies and efforts for the performance measures of the CM, however existing performance index is only measured as the viewpoint of project owner. Therefore it needs to make up for balanced view through combination of the four-way view of participants. In this study, we should search for cooperative relationship of project participants, and then we should suggest to define the difference of project in their viewpoints.