• 제목/요약/키워드: construction project success

검색결과 359건 처리시간 0.025초

SUCCESS FACTORS FOR URBAN REGENERATION PROJECT

  • Hae-Rim Kwon;Seul-Ki Lee;Jung-Ho Yu
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1515-1520
    • /
    • 2009
  • Objective of Urban regeneration project is a recovery of urban utilities through a physical, environmental, cultural, industrial and economic regeneration. The current paradigm of urban regeneration is not a simple redevelopment as physical redevelopment or improvement. Urban regeneration project is an overall development including a central commercial capacity and business capacity for administration and management, cultural facilities, sightseeing, a residential area. So Urban regeneration project include a various project. Project management of Urban Regeneration project is widely different with general project management. For that purpose, this research would offer to contribute the success factors of urban regeneration project for successful project. For offering these, this research analyzed the properties of urban regeneration project and success factors of construction project by reviewing a literature. The principal characteristics are variety objectives of each district of urban regeneration project, a diversity of stakeholder's objectives and complex structure of stakeholders, an unstructured decision-making system, a lack of plan for business cooperation. We abstracted factors for urban regeneration from brainstorming and verification by experienced experts. We suggest 2 factors related to achieving a goal effectively and 10 factors related to progress of urban regeneration project efficiently.

  • PDF

A Review of Safety and Quality Issues in the Construction Industry

  • Ogwueleka, Amaka Chinweude
    • Journal of Construction Engineering and Project Management
    • /
    • 제3권3호
    • /
    • pp.42-48
    • /
    • 2013
  • Construction industry is considered as the most hazardous industry due to its unique nature. Safety and quality management are essential to control hazards and improve success in project implementation. This paper focuses on evaluating the crucial factors influencing safety and quality management in construction projects. In order to achieve this, the qualitative and quantitative approaches were used for data collection. The findings of this study reveal the crucial safety factors as management commitment, safety awareness of top management practices/ procedures/ reviews, and errors in judgement or carelessness. Project supervision, employee involvement/ altitude, and expertise knowledge/ training were considered as the crucial quality factors influencing safety and quality management. The study shows that safety and quality issues cannot be overlooked therefore proper implementation is paramount to achieve project success.

A QUALITATIVE SURVEY ON SUCCESS FOR MAINTENANCE PROJECTS

  • Albert P C Chan;Daniel W M Chan;Edmond W M Lam
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.186-195
    • /
    • 2007
  • Key Performance Indicators (KPIs) are the criteria of measuring project performance in order to attain construction excellence. Previous researchers have examined the abstract concept of success for general new construction and identified its relationship with the factors of success. In fact, most buildings exist to satisfy the needs of people. With the passing of time and change in technology, buildings have to be maintained and renovated in order to continue functioning properly for the benefits of users. Therefore, criteria and factors of success have increasingly attracted the attention of both researchers and practitioners, especially in cities where buildings become ageing. However, the topic of project success for maintenance projects is less discussed in previous research, and project participants, including maintenance surveyors should be able to identify the success measurement and its associated factors for performance improvement. This study fills the research gap by investigating the criteria and factors of success for maintenance projects. It first provides a summary of the literature review on the criteria and factors of success for construction projects. An empirical study has also been carried out with ten practitioners in Hong Kong to further identify the criteria and factors critical for the success of maintenance projects in practice. While most criteria and factors of success for new construction projects are also applicable to maintenance projects, participants in maintenance projects believe that effective communication is in particular important to provide quality service to the end-users.

  • PDF

BENCHMARKING THE PREPROJECT PLANNING PRACTICE FOR THE BUILDING CONSTRUCTION INDUSTRY IN TAIWAN

  • Yu-Ren Wang;Yi-Jao Chen;Chun-Yin Yu;Shin-Si Jang
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.324-329
    • /
    • 2011
  • Significant decisions are made by the project team during the early planning phase of capital facility project developments. The preproject planning phase begins after a decision is made to proceed with a project concept and continues until the detail design stage. Many of the industry practitioners and researchers have recognized the importance of preproject planning and that inadequate early planning is one of the key factors affecting project success. Nevertheless, the preproject planning practices vary significantly for the construction industry in Taiwan and the quality of preproject planning relies heavily on individual project team's experience. This research sets out to benchmark the preproject planning practice for the building construction industry in Taiwan. From late 2007 to early 2010, the researchers collected information from a total of 92 building construction projects using questionnaire survey. The analysis results show that the surveyed projects with better preproject planning have better cost and schedule performances on average. It is recommended that project team spend more efforts in the preproject planning stage to have a better chance of achieving project success.

  • PDF

BEST PRACTICES FOR JOINT VENTURES: ISSUES AND CRITICAL SUCCESS FACTORS

  • Rizwan U. Farooqui;Syed M. Ahmed;Dilshad Umer
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.369-374
    • /
    • 2009
  • Project-based joint ventures are often used in the construction industry to assemble an organization that meets a client's project needs and matches or exceeds the capacities of competitors. The joint venture / partnerships provides the means for a firm to quickly add resource, political, technical, or other required strengths that will increase project acquisition. This paper sets out to study the types of joint ventures, different issues or problems while having joint ventures and the critical factors that contribute to successful joint ventures. A questionnaire was designed and administered to survey the issues and present practices of joint ventures in the South Florida construction industry. Along with the questionnaire, personnel interviews were also conducted to get first hand knowledge about the subject matter. The results are presented in the paper. These results specifically identify the overall practice of joint ventures in South Florida as well as indicate the most significant factors leading to failure or success of these ventures.

  • PDF

CM의 핵심석공요인 체크리스트 개발을 통한 CM적용효과 평가기법 개발 기초연구 (The Basis research Developing Assessment tool for Construction Management through Check List of Critical Success Factor)

  • 이태식;최재호;김영현;박장희
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.337-340
    • /
    • 2003
  • 최근 건설사업관리(Construction Management : 이하 CM) 발주방식이 늘어 나고 있다. 해외 선진국에서는 건설 산업 전반에 걸쳐 핵심 성공요인과 모범사례를 활용을 극대화 하여 다양한 건설산업의 핵심 성과지표 향상에 기여하고 있고 표준지표를 제시하여 산업계의 벤치마킹 자료로 활용하고 있는 반면 국내에서의 연구개발은 개념 정립 단계이다. 그래서 본 연구는 CM적용 모범사례 및 핵심성공요인 체크리스트 개발을 통한 산업계 수행능력 향상 및 CM적용효과 평가 기법을 개발해 CM사업의 성공적인 국내 도임에 일조하고자 한다.

  • PDF

건설프로젝트 성과에 영향을 미치는 ABC 성공요인 분석 (Analysis of ABC Success Factors Affecting Construction Project Performance)

  • 신영수;조진호;김병수
    • 한국건설관리학회논문집
    • /
    • 제23권3호
    • /
    • pp.56-65
    • /
    • 2022
  • 본 연구는 활동기반 재무관리기법인 ABC의 성공요인과 관련한 사례연구를 통해 건설프로젝트에 적용 가능한 요인을 추출한 다음 ABC의 성공요인이 프로젝트성과에 미치는 영향력을 파악하고, 커뮤니케이션의 조절효과를 분석하여 ABC의 핵심 성공요인을 밝혀내고자 하였다. 설문조사 방법은 델파이 기법을 활용하여 온라인 설문방식으로 진행하였다. 통계 분석방법은 SPSS Statistic 20으로 빈도분석과 요인분석을 수행하고 SmartPLS 2.0으로 가설검증을 수행하였다. 분석결과, 품질 이니셔티브와의 연계가 프로젝트성과에 미치는 ABC의 성공요인뿐 아니라 커뮤니케이션 조절효과에도 영향을 미치는 것으로 나타났다. ABC 성공을 위해서는 품질 이니셔티브와의 연계와 커뮤니케이션이 가장 중요한 핵심 성공요인임을 확인할 수 있었다. 본 연구의 결과를 바탕으로 ABC와 품질경영을 잘 연계시킨다면 프로젝트의 성과를 향상하는데 효과를 볼 수 있을 것으로 기대한다.

Critical Success Factors of Large Design-Build Projects in Vietnam

  • Dang, Chau Ngoc;Le-Hoai, Long;Lee, Young-Dai
    • Journal of Construction Engineering and Project Management
    • /
    • 제2권3호
    • /
    • pp.30-39
    • /
    • 2012
  • Design-build (D&B) has been broadly perceived as an effective project delivery method and become popular in the world. However, the implementation process of this innovative procurement method in Vietnam encounters difficulties due mainly to unfamiliarity and inexperience with the approach. Critical success factors (CSFs) which could be used to enhance the project execution are useful to practitioners in Vietnam if identified. A questionnaire survey was employed to identify CSFs of D&B projects in Vietnam. Parties' competence, especially financial capability, and contract documentation are the most important factors significantly affecting project success. It was also shown that the perspectives of two principal parties in D&B projects on the CSFs are statistically correlated. The identified CSFs were then validated with some various D&B projects. The execution results of CSFs' were compared with the projects' performance measured try key performance indicators (KPIs). The most important success factors of this study were also compared with other countries'. The validation and comparison results provide project participants with some useful information to perform D&B projects better. Practitioners should well perform the identified CSFs to enhance the chance of the success of D&B projects in Vietnam. The findings of this study are useful not only to Vietnamese practitioners but also to others who are concerned about D&B method and plan to employ it in Vietnam in future.

Progressive Design-Build: Its Functions as a Contracting Method and the Four Pillars of Project Success

  • Jeong, Euiseok;Anderson, Connor;Lin, Ken-Yu;Migliaccio, Giovanni C
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.25-32
    • /
    • 2022
  • As a project delivery method, Design-Build (DB) has provided owner, architect, and contractor groups with a process of early design and rapid construction for the past three decades. Although there are many benefits to using standard DB, dissatisfaction has arisen due to limitations to innovate, limited owner involvement during design, and often lengthy procurement. Progressive Design-Build (PDB) has become an appealing alternative providing benefits not seen with standard DB. This paper investigates how PDB impacts a project and how it compares against standard DB; it also presents a proposed framework for evaluating the owner's responsibility and assessment of a project, which we named the "Four Pillars of Project Success". The four pillars are defined with respect to an owner's responsibility and assessment of a project, including project predictability, project risk, project schedule, and project cost. We conducted a literature review, examined several public project case studies, analyzed PDB project information collected by the Design-Build Institute of America (DBIA), and held stakeholder interviews with owners, contractors, and architects who have used both PDB and standard DB. This paper offers insight into PDB's structure and outcomes so an owner group can make an informed decision when considering PDB as their next construction contracting method.

  • PDF

건설사업관리자(CMr) 측면에서 건설기술용역 평가의 CSFs 추출 및 AHP 중요도 분석 (CSFs Extraction and AHP Importance Analysis for Construction Technology Services Evaluation in terms of Construction Manager)

  • 양진국;홍성욱
    • 대한건축학회논문집:구조계
    • /
    • 제36권3호
    • /
    • pp.129-134
    • /
    • 2020
  • The current evaluation time period for the construction management service is the project completion or after project completion. Therefore, the construction manager has the following problems. First, it is difficult to prepare the evaluation due to the new field movement of the existing participating engineer. Next, the CM work is complex as well as extensive. Therefore, the critical success factors of the construction technology services evaluation are required as a systematic performance standard of CM work. In this study, we extracted the critical success factors that can systematically prepare the evaluation from the early stage of the project through in - depth interviews with experts. And, this study was analyze the priority of each factor by using AHP technique. As a result, the most important factors were related to the systemization of the preparation process, the construction manager work capabilities and practical construction management. And the priorities of all factors were analyzed high in the factors suggested by the owner groups. The results of this analysis are expected to provide the standards that construction management service performer carry out structured management of construction management throughout the project.