• Title/Summary/Keyword: construction project records

Search Result 55, Processing Time 0.027 seconds

OPTIMISATION OF ASSET MANAGEMENT METHODOLOGY FOR A SMALL BRIDGE NETWORK

  • Jaeho Lee;Kamalarasa Sanmugarasa
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.597-602
    • /
    • 2011
  • A robust asset management methodology is essential for effective decision-making of maintenance, repair and rehabilitation of a bridge network. It can be achieved by a computer-based bridge management system (BMS). Successful BMS development requires a reliable bridge deterioration model, which is the most crucial component in a BMS, and an optimal management philosophy. The maintenance optimization methodology proposed in this paper is developed for a small bridge network with limited structural condition rating records. . The methodology is organized in three major components: (1) bridge health index (BHI); (2) maintenance and budget optimization; and (3) reliable Artificial Intelligence (AI) based bridge deterioration model. The outcomes of the paper will help to identify BMS implementation problems and to provide appropriate solutions for managing small bridge networks.

  • PDF

Efficacy of Development Control as a Tool for Monitoring Building Developments in Kenya

  • Omollo, Wilfred Ochieng
    • Journal of Construction Engineering and Project Management
    • /
    • v.9 no.1
    • /
    • pp.1-17
    • /
    • 2019
  • This study examined the efficacy of development control in the monitoring of building developments in Kenya, a case study of Kisii Town. It focused on the extent to which the 1968 Building Code was enforced by the County Government of Kisii in an attempt to promote quality assurance. The target population comprised 7,430 residential developments from where a sample size of 364 was proportionately and randomly drawn. Research findings indicated that 39% of developers were unaware that their developments should have been inspected during construction. Similarly, awareness of building inspection significantly predicted if developers issued Notices of Inspection to the planning authority to facilitate inspections. Consequently, developers who were unaware that their building constructions required inspection were 99.9% less likely to issue such notices. Moreover, developers who did not obtain development permission were correspondingly 99.9% less likely to issue Inspection Notices. As a result, those who did not issue Notices of Inspection were 99.8% less likely to have their buildings inspected during construction due to lack of records indicating when such constructions had commenced. The study concludes that although the County Government of Kisii is lawfully mandated to monitor building developments in Kisii Town, the function is not well executed. This gap affords developers with an opportunity of not conforming to the approved building plans.

A research on the Construction and Sharing of Authority Record-focusing on the Case of Social Networks and Archival Context Project (전거레코드 구축 및 공유에 관한 연구 SNAC 프로젝트 사례를 중심으로)

  • Lee, Eun Yeong
    • The Korean Journal of Archival Studies
    • /
    • no.71
    • /
    • pp.49-89
    • /
    • 2022
  • This study suggests the necessity and domestic application plan a national authority database that promotes an integrated access, richer search, and understanding of historical information sources and archival resources distributed among cultural heritage institutions through the "Social Networks and Archive Context" project case. As the SNAC project was transformed into an international cooperative organization led by NARA, it was possible to secure a sustainable operating system and realize cooperative authority control. In addition, SNAC authority records have the characteristics of providing richer contextual information about life and history and social and intellectual network information compared to libraries. Through case analysis, First, like SNAC, a cooperative body led by the National Archives and having joint ownership of the National Library of Korea should lead the development and expand the scope of participating institutions. Second, in the cooperative method, take a structure in which divisions are made for each field with special strengths, but the main decision-making is made through the administrative team in which the two organizations participate. Third, development of scalable open source software that can collect technical information in various formats when constructing authority data, designing with the structure and elements of archival authority records, designing functions to control the quality of authority records, and building user-friendly interfaces and the need for a platform design reflecting content elements.

Analysis of Perception Difference between Domestic and International Engineering Firms -Focusing on the Competitiveness of International PMC Market- (해외 PMC 시장 경쟁력에 대한 국내외의 인식차이 분석 - 한국 엔지니어링 기업을 중심으로 -)

  • Jang, Woosik;Lee, Baul;Kim, Yeonsoo;Han, Seung Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.6
    • /
    • pp.3-12
    • /
    • 2017
  • In recent years, Project Management Consultant(PMC) project has been emerging as a high-value-added engineering project. However, domestic engineering firms have difficulties in entering the overseas PMC market because of poor project performance and lack of PMC capabilities. To overcome these limitations, this study analyzes the key competitiveness factors for successfully performing the global PMC projects. PMC competency factors based on Porter's double diamond theory were extracted, and a questionnaire survey was conducted on domestic and overseas engineering firms. In addition, the important PMC competency factors were derived through paired t-test and IPA matrix analysis. As a result, the PMC competitiveness of domestic engineering firms was analyzed as around 60% compared to that of global engineering firms. Furthermore, 'PMC track records' and 'project management/owner response skills' were identified as top priority competency factors which are the most necessary factors for present domestic engineering firms. This study is expected to support to establish the international PMC market entry strategies by providing priorities of key competitiveness factors.

Impact of Construction Safety Managers and Project Characteristics on Air Conditioning Installation Safety Scores (건설 안전관리자의 특성 및 프로젝트 특성이 에어컨 설치 공사의 안전 점수에 미치는 영향)

  • Uhm, Miyoung;Kim, Jinyoung;Kim, Hongjo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.3
    • /
    • pp.381-391
    • /
    • 2024
  • This study examined the factors influencing safety scores in air conditioning installation projects, with a specific focus on the characteristics of safety managers and project-specific details. Given the increase in industrial accidents within this sector and the lack of research on smaller-scale operations, this analysis of 7,046 safety data records from Company A aimed to address this gap. The results indicate that the month of project commencement has the most significant impact on safety scores(correlation coefficient of 0.21), followed by the age of the safety manager(correlation coefficient of 0.06). Interestingly, the educational background of the managers did not appear to influence safety outcomes. Furthermore, project cost was found to have a negative correlation with safety scores(-0.1), suggesting that lower-cost projects may be associated with higher risk levels. These findings underscore the importance of developing tailored safety checklists that take into account the specific timing and scale of air conditioning installation projects. Additionally, the results suggest that incorporating both experienced(older) and less experienced(younger) safety managers into safety strategies may be beneficial for achieving optimal safety outcomes. This balanced approach could leverage the strengths of both groups, potentially enhancing overall risk assessment and mitigation efforts.

The Acquisition, Construction and Common Use of Modern and Post-modern Document DB in the NAK, NIKH, and AKS (근·현대 지역사료 수집, DB 구축 및 공동 활용 - 국가기록원, 국사편찬위원회, 한국학중앙연구원을 중심으로 -)

  • Kang, Soon-Ae
    • Journal of Korean Society of Archives and Records Management
    • /
    • v.8 no.2
    • /
    • pp.39-60
    • /
    • 2008
  • This paper deals with the four aspects of the acquisition, construction and common use of modern and post-modern document DB in the NAK, NIKH, and AKS. First, The concept of Korean regional history includes provincial history, local history and regional history and as far as modern and post-modern history is concerned, the concept of regional history is on expansion. Second, National Archives of Korea has been systematically collecting and managing modern and post-modern regional history records in compliance to Public Institutes Records Management Law, enacted in 1999 and currently is in charge of handling public records of 373 central government administration offices, 514 regional government offices, Office of Education, universities and of other public agencies. National Institute of Korean History is working on a ten year project from 2004 to collect the scattered modern and post-modern regional history records and to classify them regionally and thematically. The Academy of Korean Studies has been collecting modern and post-modern regional history records and collection was initiated by Modern History Research. Those records that are collected from 1997 and 2005 are mainly from the liberation period. Third, characteristics of Central Archives Management System and Nara Records Portal System of NAK, Korean History Database System of NIKH and of The AKS' Korean Provincial Culture Electronic Encyclopedia are elaborated. Fourth, establishing 'Modern and Post-modern Regional History Records Council' as an affiliated organization of National Archives Management Committee is recommended, NAK leading the council and promoting further cooperation. In this section, an emphasis on allotted tasks of three institutes in order to achieve technology development for digitalized resource sharing, to improve on contents and to promote public and international use is placed as well.

The Characteristics of Gwanghwamun reconstruction in the 1960's (1960년대 광화문 중건과정의 특성)

  • Kang, Nan-hyoung;Song, In-Ho
    • Journal of architectural history
    • /
    • v.24 no.6
    • /
    • pp.45-55
    • /
    • 2015
  • After the Korean war, two major attempts were made to reconstruct Gwanghwamun Gate as an important part of Korea's lost cultural heritage. In December 2006, the Korean government replaced the concrete gate with a wooden one, yet traces of the attempts made in the 1960s to transform Gwanghwamun Gate and the main road remain to this day. At the time, the Third Republic of Korea, sought to legitimize itself in the name of modernity, and went on to modernize the architecture and urban landscape of Seoul. The location and design selected for the rebuilt Gwanghwamun illustrated the symbolic relationship between historic heritage and urban development. The reconstruction of the gate began as part of the Third Republic's project to restore the Central Administration Building and culminated in the transformation of the main road in front of the gate. By reconstructing the traditional gate using concrete, the military government intended to convey the message that we could inherit our proud tradition using modern materials, and that we should actively adopt the new technologies of the modern era. This study begins with the premise that the Gwanghwamun reconstruction project of 1968 represents the application of new technological thinking to Korea's architectural style, and has two objectives. The first is to summarize the reconstruction process and method using the records and drawings from the 1968 project, which was then under the leadership of architect Kang Bong-jin. The second is to analyze the characteristics of the architectural style and structure of the reconstructed Gwanghwamun so as to reinterpret the relationship between Korean tradition and modern technology.

Estimation of probabilistic hazard for Bingol province, Turkey

  • Balun, Bilal;Nemutlu, Omer Faruk;Benli, Ahmet;Sari, Ali
    • Earthquakes and Structures
    • /
    • v.18 no.2
    • /
    • pp.223-231
    • /
    • 2020
  • Due to the fact that Bingöl province is at the intersection of the North Anatolian Fault and the Eastern Anatolian Fault, the seismicity of the region is important. In this study, probabilistic seismic hazard analyzes (PSHA) were conducted to cover the boundaries of Bingöl province. It occurred since 1900, the seismicity of the region was obtained statistically by considering the earthquake records with a magnitude greater than 4 and the Gutenberg-Richter correlation. In the study, magnitude-frequency relationship, seismic hazard and repetition periods were obtained for certain time periods (10, 20, 30, 40, 50, 75 and 100 years). Once a project area determined in this study, which may affect the peak ground acceleration according to various attenuation relationships are calculated and using the Turkey Earthquake Hazard Map, average acceleration value for Bingöl province were determined. As a result of the probabilistic seismic hazard analysis, the project earthquakes with a probability of exceeding 50 years indicate that the magnitude of the project earthquake is 7.4 and that the province is in a risky area in terms of seismicity. The repetition periods of earthquakes of 6.0, 6.5, 7.0 and 7.5 are 42, 105, 266 and 670 years respectively. Within the province of Bingöl; the probability of exceeding 50 years is 2%, 10% and 50%, while the peak ground acceleration values are 1.03 g, 0.58 g and 0.24 g. As a result, probabilistic seismic hazard analysis shows that the seismicity of the region is high and the importance of considering the earthquake effect during construction is emphasized for this region.

An Exploratory Study on the Construction of Retrospective Authority Data with National Authorities (국가전거를 활용한 단위 도서관의 전거데이터 소급 구축 연구)

  • Jee-Hyun Rho
    • Journal of the Korean Society for Library and Information Science
    • /
    • v.57 no.1
    • /
    • pp.161-182
    • /
    • 2023
  • In the recent cataloging environment, the function of authority data is becoming more important. In Korea, a pilot project for sharing and joint use of the national authority data has been promoted since 2019, and a plan to automatically construct retrospective authority data using national authorities is in progress. This study aims to (1) analyze the results of the pilot project for retrospective authority data jointly promoted by the National Library of Korea and KERIS in 2019, (2) explore methodological limitations and problems in the process, and (3) derive policy proposals for constructing authority data more efficiently. To this end, a university library participating in the pilot project was investigated as a case study. Based on it, the automatic generation rate and accuracy of authority data, and errors and omissions cases and causes were analyzed in detail. As a results of the study, it was found that the quality of union catalogs and bibliographic records had a great influence on automatically constructing authority data, and supplementary methods were needed to minimize these limitations.

Risk Analysis using Construction Insurance Claim Payouts (건설공사보험 피해 보상금 지급액을 활용한 리스크 분석)

  • Yu, Yeong-Jin;Son, Kiyoung;Kim, Ji-Myong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.4
    • /
    • pp.349-357
    • /
    • 2016
  • Recently, the quantity of risk in construction project has been inflated due to the fact that current construction projects have been large and complicated. Therefore, a study on the risk management methods is necessary that can predict and respond to the need in complicated modern construction projects. In this study, the objective is to analyze the cause of accident in actual construction sites and develop a risk assessment model based on insurance claims records. To reach the goal of this study, first, the frequency and severity of accidents are analyzed the causes of accidents based on the classification; progress rate, season, and total construction costs. Second, a risk assessment model is developed by utilizing a multiple regression analysis. The dependent variable is loss ratio of material damage and three categories; natural hazards, geographic information, and construction method & ability, are used as the independent variables. The model's adjusted R-square is 0.455. The contributions of this study will be used as a material for a quantitative risk analysis model development and review of the construction risk factors for future study.