A Case Study on the New Administrative Capital Construction Records Management: Focusing on the Arquivo Publico do Distrito Federal of Brazil (신행정수도건설기록물 관리 사례 연구: 브라질의 ArPDF를 중심으로)

  • Gyeonghyeon, Park;Soonhee, Kim
    • Journal of Korean Society of Archives and Records Management
    • /
    • v.22 no.4
    • /
    • pp.109-128
    • /
    • 2022
  • The new administrative capital construction project is an important national project implemented to relocate the national administrative capital, and the records produced during the construction have high historical value. However, Korea's management of these records related to the construction of the new administrative capital is insufficient; thus, finding a management plan is necessary. In contrast, Brazil is a country that collects, builds, and maintains both public and private records produced during the construction of Brasilia, the new administrative capital. Thus, Arquivo Publico do Distrito Federal (ArPDF), the Brazilian records management organization established to manage Brasilia's construction records, was selected as the case analysis subject in this study. By analyzing ArPDF's website and official publications, this study investigated the overall matters related to the management of new administrative capital construction records and derived implications applicable to the management of new administrative capital construction records in Korea.

BIM for Construction Quality Record

  • Son, Sang-Hyuk;Lee, Dong-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.252-254
    • /
    • 2015
  • Building Information Modeling (BIM) encourages effective information share and utilization among project participants during entire life cycle of facility. This paper presents a method that keeps track of the historical quality records involved in construction operations and facilitates using BIM. The method is coded into BIM based Quality Record Traceability (BIM-QRT) System that makes use of historical records obtained from database administrating construction operations. This study is of value to practitioners because the method makes clear the project participants' responsibility relative to the quality of each and every element of the facility. The main objective of this research is to develop an accurate, fully automated method for construction Quality Record Tracking by using a BIM along with construction operations data obtained by information technology. Test cases verify the usability and validity of the methods implemented in the system.

  • PDF

A Study on the Classification System of National Construction Project based on WBS (WBS 기반의 국책 건설사업 기록물 분류체계에 대한 연구)

  • Jeong, Ki-Ae;Jung, Kuk-Hwan;Kim, Chang-Ha
    • Journal of Information Management
    • /
    • v.41 no.1
    • /
    • pp.173-200
    • /
    • 2010
  • National construction project for SOC(Social Overhead Capital) is led by the government and invested high cost and all capabilities for long times. In general case the life times of SOC facilities are permanently. According to the long life time of the facilities documents and records of national projects are also retained permanently. Consistent classification systems are required to operation and maintenance of the facilities efficiently and to support the organic co-works for several Stakeholders. Therefore the classification of national construction projects are based on WBS of the project. WBS is the hierarchy structure that established and developed in project management project management methodology to produce deliverables of the projects. As a result, this study provides a prospect of project records classification systems in the 21st Century.

MEASURING AND COMPARING PROFIT PATTERNS OF TRADITIONAL CONSTRUCTION COMPANIES EXTENDING TO HIGH-TECH CONSTRUCTION

  • Jieh-Haur Chen;Chung-Fah Huang;S. C. Hsu
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.360-365
    • /
    • 2005
  • The need of constructing high-tech facilities is one of the important issues concerning the competitiveness by the high-tech companies. It, simultaneously, offers a magnificent opportunity for construction participants. Nevertheless, the high-tech construction is experience-based, resulting in little related construction knowledge that has been statistically analyzed and documented. This study measures and confers with the profit patterns causing the disparity between the traditional and high-tech construction. The database was the result of collecting detailed information of 65 construction projects from eight construction companies, including detailed records of over 20 main construction operations in each project. All of these were performed during the recent 10 years and encompassed in the project types of the high-tech construction, residential building, and commercial building. Rendering suggestions regarding profit management and expecting to economize cost of learning from inexperience while extending to the high-tech construction were both presented.

  • PDF

A Study on Optimal Duration Estimation for Construction Activity

  • Cho, Bit Na;Kim, Young Hwan;Kim, Min Seo;Jeong, Tae Woon;Kim, Chang Hak;Kang, Leen Seok
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.612-613
    • /
    • 2015
  • As a construction project is recently becoming large-scaled and complex, construction process plan and management for successful performance of a construction project has become more important. Especially a reasonable estimation plan of activity duration is required because the activity duration is directly related to the determination of the entire project duration and budget. However, the activity duration is used to estimate by the experience of a construction manager and past construction records. Furthermore, the prediction of activity duration is more difficult because there is some uncertainty caused by various influencing factors in a construction project. This study suggests an estimation model of construction activity duration using neural network theory for a more systematic and objective estimation of each activity duration. Because suggested model estimates the activity duration by a reasonable schedule plan, it is expected to reduce the error between planning duration and actual duration in a construction project. And it can be a more systematic estimation method of activity duration comparing to the estimation method by experience of project manager.

  • PDF

FACTORS ACOUNTING FOR ACTIVITY-TIME AND PROJECT-TIME UNCERTAINITIES IN BORED PILES CONSTRUCTION PLANNING: CASE STUDY ON A BUIDLING PROJECT IN HONG KONG

  • Stephen K.K. Cheng;Ming Lu;Hongqin Fan
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.747-753
    • /
    • 2009
  • Planning the construction for a system of bored piles in building foundation engineering is (1) to predict the time duration required to complete all the bored piles with due consideration of relevant engineering factors and site constraints; then (2) to predict the total project time generally by aggregating the predicted working duration for construction of each bored pile. The duration for construction of an individual bored pile results from analyzing various working sequences and different activity duration (such as predrilling, excavation, steelfixing, air-lifting, and concreting, etc.), which is informed by experiences and site records of previous projects. However, determining the project duration for constructing many bored piles on one site is much more complicated than adding up the time duration for individual piles. In practice, project schedules are often found to be unrealistic and incorrect during the construction stage. This is because construction planning is not based on a exhaustive and comprehensive evaluation of site factors, such as site layout plan, site constraints, quality control, environmental control, safety control and logical relationships between different trades. In this paper, we identify those factors based on a foundation engineering site in Hong Kong with ninety-seven bored piles and address their effects on uncertainties in activity time and project time.

  • PDF

A Study of Construction Quality Management System using QR code (QR코드를 활용한 품질경영시스템에 관한 연구)

  • Park, Sang-Min;Lim, Tae-Kyung;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.137-139
    • /
    • 2012
  • This paper presents a system architecture and database of construction quality management system which encourages real time information tracking and monitoring. It improves the real time quality record tracking by using QR code technology in the project delivery. The advantages and issues relative to QR code and the database structures of the tracking system are presented. Conventional project scheduling system, operation modeling and analysis system, and quality management system are hybridized using QR code technology. The system improves project quality management by tracking the atomic tasks which consists of a construction process at the lowest level of construction hierarchy. It analyzes the quality records to determine the causes of abnormality and/or nonconformity. Using QR code technology, the construction quality management system may be more effective than the conventional one. It was confirmed that the quality management processes in construction project delivery can be more visible and controllable by integrating QR code technology, project scheduling system, and quality management system.

  • PDF

A Study on the Architectural Characteristics of Jogeongdan Examined through Construction-Related Records (영건(營建) 관련 자료를 통해 본 조경단(肇慶壇)의 건축특성)

  • Ahn, Seon-Ho
    • Journal of architectural history
    • /
    • v.32 no.5
    • /
    • pp.59-68
    • /
    • 2023
  • Jogyeongdan is an altar built by the Korean Empire within the burial grounds of Sijomyo(始祖墓), the Jeonju Lee clan, as a part of their posthumous respecting project. This site adheres to strict rules and formalities that are comparable to those of the royal tombs of the Joseon Dynasty, with its altars and monument House demonstrating construction techniques that hold high value in architectural history. This study compares and analyzes construction-related records such as Uigwe, Statements, and Figure, along with their historical context. Through this effort, the study explores in detail the original form of Jogyeongdan at the time of its construction and subsequent transformations in later periods. Findings showed that the Figure was drawed by Chae Yongsin and was only a blueprint prior to the construction; it was modified during the actual construction process. A part of Jogyeongdan project was carried out by demolishing four government office buildings that were closed because of the Gabo Reform in order to secure wood and roof tiles, among other materials. Additionally, concluded the Jaesil was by relocated Deokryudang from Samryeyeokcham. Further, instances of distinctive terminology usage were found related to construction materials in the Jogyeongdan Uigwe, which were not used in another Uigwe. These terms were distinguished in detail according to the locations in which the materials were used.

A Study on the Model for Construction Records Classification System (건설기록물 분류체계 모형에 관한 연구)

  • Park, Yong-Boo;Kim, Tae-Soo
    • Journal of the Korean Society for information Management
    • /
    • v.28 no.3
    • /
    • pp.83-101
    • /
    • 2011
  • The international standards, ISO 15489 and Family Code, recommend using functional classification method both in public and private organizations. In this study made a comparative analysis of the details of classification systems through case studies on records classification systems of a total of seven comprehensive construction companies in Korea including three large corporations and four small and medium-size businesses. Findings of this study suggester the direction of developing construction records classification system and its methodology. By summarizing classification standards derived from these case studies, key construction records classification standards were presented.

THE PRICE OF RISK IN CONSTRUCTION PROJECTS: CONTINGENCY APPROXIMATION MODEL (CAM)

  • S. Laryea;E. Badu;I. K. Dontwi
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.106-118
    • /
    • 2007
  • Little attention has been focussed on a precise definition and evaluation mechanism for project management risk specifically related to contractors. When bidding, contractors traditionally price risks using unsystematic approaches. The high business failure rate our industry records may indicate that the current unsystematic mechanisms contractors use for building up contingencies may be inadequate. The reluctance of some contractors to include a price for risk in their tenders when bidding for work competitively may also not be a useful approach. Here, instead, we first define the meaning of contractor contingency, and then we develop a facile quantitative technique that contractors can use to estimate a price for project risk. This model will help contractors analyse their exposure to project risks; and also help them express the risk in monetary terms for management action. When bidding for work, they can decide how to allocate contingencies strategically in a way that balances risk and reward.