• 제목/요약/키워드: construction project management system

검색결과 1,505건 처리시간 0.027초

IMPLEMENTATION OF PRODUCT DATA MANAGEMENT SYSTEM FOR DESIGN OF BRIDGE STRUCTURES

  • Jin-Suk Kang;Seung-Ho Jung;Yoon-Bum Lee;Kwang-Myong Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1318-1323
    • /
    • 2009
  • In recent years, dramatic advances in information technology have motivated the construction industry to improve its productivity. Computer-based information technology includes Computer-Aided Design (CAD), Computer-Aided Engineering (CAE), Computer-Aided Manufacturing (CAM), Enterprise Resource Planning (ERP), Digital Mock-Up (DMU) and Product Data Management (PDM). Most construction industries are trying to apply these technologies for quality improvement, reduction of construction time and cost. PDM is very useful for managing data and process related to product design and manufacturing. PDM system has various functions such as drawing and engineering document management, product structure and structure modification management, part classification management, workflow management, and project management. In this paper, PDM system was applied to the design of steel-concrete composite girder bridge. To make a practical guidance for PDM implementation to bridge design, the procedure for its implementation was presented. Consequently, this paper could be useful to enhance the efficiency of bridge design.

  • PDF

A STUDY ON THE FEASIBILITY OF IPD METHOD IN CONSTRUCTION PROJECT IN CHINA

  • Teng Li;Jae-Jun Kim;Ju-Hyung Kim
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.493-497
    • /
    • 2011
  • Project delivery systems have evolved over the years. Continuous changes in technology and the increasing sophistication in buildings required specialization of design and construction services. IPD as a delivery method has been used in the USA and other countries. With the development of BIM, lots of construction companies have been realizing this method since BIM came out in China. However IPD are not considered with BIM, IPD will be an important role in management system of construction. This study introduced the definition of IPD and based on the flow process of IPD, compared the process in china and other countries. Through the real project and the condition in China this paper analyzed the feasibility of IPD in China.

  • PDF

An Integrated Expert Model for Delay Management in Construction Projects

  • jalal, Majid Parchami;Yousefi, Elham
    • Journal of Construction Engineering and Project Management
    • /
    • 제7권3호
    • /
    • pp.1-14
    • /
    • 2017
  • Delay claim should actually be supported by a set of proper information so that the contractors could prove their validity. The so-called information should be able to clarify the relationship between delay events and how they impact on the whole project. Therefore, exploiting an integrated system by people who are involved in construction business would certainly prove helpful. In the present study, delay analysis methods have been investigated along with selecting a relatively comprehensive method which has been modified, and eventually, a novel model and its required modules have been proposed for evaluating delay claims. The suggested integrated model is formed to identify delayed events, to classify delays, to measure the impacts of delays on the project scheduling, and finally to estimate the damages which were caused by those so-called delays. A decision support system (DSS) model which is related to the integrated system is actually extracted from Iran's general contract conditions, that is, 4311 magazine (equivalent to red FIDIC book). It is then programmed and coded by C# program. This DSS model can be used as an input of Easy Plan program. In addition, at the end of this research, the coded DSS has been used along with the so-called program so that a modified and developed model could be generated.

건설 프로젝트 공정표 생성을 위한 사례기반 전문가시스템의 설계

  • 김현우;이경전;이재규
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 1996년도 춘계공동학술대회논문집; 공군사관학교, 청주; 26-27 Apr. 1996
    • /
    • pp.709-712
    • /
    • 1996
  • Generating a project network of a specific construction project is very time consuming and difficult task in the field. To effectiviely automate and support the planning process, we design a case-based project planning expert system inspired by the fact a human expert project planner uses previous cases for planning a new project. A construction project case consist of its specific characteristics and the corresponding project network (i.e. project plan). Using frame based representation. we represent the project features affecting the progress network and the entities composing the project plan such as the buildings, construction methods, WBS (work breakdown structure), activities, and resources. The project planning process runs through most similar case retrieval, case adaptation, and user requirement satisfaction. We represent the construction domain knowledge for each procedure using constraints and rules. We develop the methodology for constraint-based case adaption. Case adaptation process mainly consist of activity generation/deletion and predecence constraint satisfaction, for which we develop the dynamic constraint generation method and connect user-level requirement representation the system-level network modification knowledge. The methodology is being applied to the prototype for apartment construction project planning.

  • PDF

Action to Improve the Reliability of Production Planning

  • Kim Daeyoung
    • 한국건설관리학회논문집
    • /
    • 제3권4호
    • /
    • pp.139-144
    • /
    • 2002
  • Management of today's dynamic projects requires a shift of focus from product to process. The purpose of traditional project controls is to conform performance to plan. The purpose of lean project controls is to make the best possible choices at each point in time during the course of the project, as well as contributing knowledge to the parent organizations so they can learn from project experience. The Lean Construction Institute(LCI) proposed the Last Planner System(LPS) capable of accomplishing that purpose, principally through controlling the quality of planning and of management processes themselves, as distinct from concentrating exclusively on project performance. The case project was a pilot project for the implementation of the Last Planner. Consequently, the coordination of the work on this project was extremely successful. The project had its share of challenges. The coordination did not prevent design problems, or supplier errors, but helped the team deal with the problems effectively while maintaining the work flow. The last planner helped the contractors know: a) who will be doing what and where, b) what each one needs from the others, and c) what are the project priorities. The system itself created a more collaborative environment, because it 'demands' that the subcontractors address these issues.

Prioritization of Price Volatility Management Strategies in Construction Projects

  • Joukar, Alireza;Nahmens, Isabelina;Harvey, Craig
    • Journal of Construction Engineering and Project Management
    • /
    • 제7권3호
    • /
    • pp.15-25
    • /
    • 2017
  • The existence of material price volatility in construction projects puts forward substantial risks for all parties involved. Depending on the parties involved in the project, type of contracts, and state of the market various risk management strategies are practiced by contracting parties to manage project risks related to price volatility. Unfortunately, in many cases companies fail to select an adequate approach to better manage volatilities of material prices due to the lack of a decision support system to aid in the selection of an appropriate strategy based on the project characteristics. The aim of this study is to identify critical project factors and align them to documented strategies to manage price volatility based on an extensive literature review and industry interviews. This study found Integrated Project Delivery (IPD) as the ideal strategy with respect to project duration; quantitative risk management methods with respect to the cost; and Price Adjustment Clauses (PAC) with respect to the risk allocation, as the top price volatility management strategies.

REVOLUTIONS OF CONSTRUCTION ORGANIZATIONS TOWARDS GREEN BUILDING PRJECTS

  • Po-Han Chen;Yuan-Yuan Li
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.558-565
    • /
    • 2009
  • In recent years, the demand for green buildings is growing fast due to legislative and social pressures. Construction organizations, which play an important role in promoting building industry growth, are facing with challenges on how to adapt themselves to enhance sustainability of the buildings. In this paper, the green value chain and system frameworks, an extend application of Porter's value chain and system models, are introduced. Based on deep analysis of the green value chain and system frameworks, a revolution model for construction organizations towards green building is created. Management factors critical for a successful green building project, at the firm and project organization level, are extracted. Furthermore, external critical relationships are also identified. Fully understanding of these management factors and the model can help and enable practitioner to know what new capabilities should be deployed and developed in the long run for maximizing sustainability.

  • PDF

Action Research: the Use of Enterprise Resource Planning System in Construction Engineering and Project Management

  • Chan, Eric W.L.
    • Journal of Construction Engineering and Project Management
    • /
    • 제1권3호
    • /
    • pp.18-27
    • /
    • 2011
  • Although information communication technology (ICT) is long regard as very useful tool in today's construction engineering and project management environment, organizations must not only operate based upon its original setting, but also requires on-going observation, additional features and fine-tuning actions before the desirable outcome can be achieved. However, it is a very common phenomenon that organizations purchase the licensed "off-the-shelf-software" package and customize it to suit their own business need. Due to the incapability of such software and inefficient customization, the possible result is making that ICT tool not user-friendly and sometimes the whole system becomes obsolete. The purpose of this paper is to review and report those actions taken (between February 2006 and December 2010) by a construction organization to enhance the performance of its Enterprise Resource Planning (ERP) system launched in December 2002. Such actions include: improving data inputting method; removing the transition bottleneck; introducing crystallization function; revising the organization's "Delegation and Limits of Authority"; publishing the "League Table" amongst users; integrating the 3D Mode into the system and upgrading hardware. Whilst the ultimate goals of such system are well beyond the time limit of this research study, an obvious interim result, achieved by this case studied organization, was winning a landmark project worth US$500 million after the ERP system was functioned properly and effectively. Their experience and success becomes an exemplar which can be borrowed by those companies, from managerial perspectives and as a roadmap, planning to adopt information technology (IT) strategy and use ICT tool in the construction engineering and project management framework. Singapore, where public housing provisions have been a major concern of their citizens as the building stock gets older.

지열발전 시추공 구축 프로젝트관리시스템 개발 (Development of Project Management System for Geothermal Well Construction)

  • 김광염;이승수
    • 신재생에너지
    • /
    • 제8권3호
    • /
    • pp.38-46
    • /
    • 2012
  • Enhanced Geothermal System (EGS) among geothermal system types enables to produce sustainable energy even in non-volcanic region while conventional geothermal energy has been restricted to obtain only from hot and permeable formation such as in volcanic regions. Successful EGS project in terms of economy, however, can be expected only when the project is managed effectively considering most of influencing factors (e.g., tangible and intangible resources, cost, time, risks, etc.). In particular, well construction is of the utmost importance in geothermal project as it dominantly influences on time and cost in the whole project. Therefore, when it comes to viable geothermal project without abundant experience, managing drilling economically and efficiently is inevitable. In this study, a project management system for well construction in geothermal project based on project control system including work breakdown structure and cost account was developed to predict and assess the performance of drilling and to visualize the progress.

Virtual Design and Construction (VDC)-Aided System for Logistics Monitoring: Supply Chains in Liquefied Natural Gas (LNG) Plant Construction

  • Moon, Sungkon;Chi, Hung-Lin;Forlani, John;Wang, Xiangyu
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.195-199
    • /
    • 2015
  • Many conventional management methods have emphasized the minimization of required resources along the supply chain. Accordingly, this paper presents a proposed method called the Virtual Design and Construction (VDC)-aided system. It is based on object-oriented resource control, in order to accomplish a feed-forward control monitoring supply chain logistics. The system is supported by two main parts: (1) IT-based Technologies; and (2) VDC Models. They enable the system to convey proactive information from the detection technology to its linked visualization. The paper includes a field study as the system's pre-test: the Scaffolding Works in a LNG Mega Project. The study demonstrates a system of real-time productivity monitoring by use of the RFIDbased Mobile Information Hub. The on-line 'productivity dashboard' provides an opportunity to display the continuing processes for each work-package. This research project offers the observed opportunities created by the developed system. Future work will entail research experiments aimed towards system validation.

  • PDF