Profitability Influence Factor Analysis by Apartment Remodeling Case Study (공동주택 리모델링 사례조사를 통한 수익성 영향요인 분석)

  • Lee, Kwang-Seob;Kim, Ki-Hyun;Kim, Kyung-Rai;Shin, Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.127-135
    • /
    • 2007
  • Markets for the apartment remodeling projects will be a major portion of the construction industry in near future. However, only partial remodeling works in the apartment were done so far. This situation caused bad impact to expand the remodeling markets and less profits of the remodeling projects. In order to solve this problem, many other researches were done previously to Improve profits of the apartment remodeling projects. However, the results are too theoretical to implement them and Improve profits. In this research, profitability influence factors that are possible to improve effect of the remodeling works are selected and analyzed through several studies. Then, correlation analysis is performed between the improvement level in the remodeling projects and the numerical profitability based on actual cases. The result clearly shows that some improved remodeling items are strongly related to the profit. These results lead us to the strategy to follow for the purpose of increasing profits of the remodeling projects.

A Study on the Economic Feasibility Analysis of Cosmetics Beauty Industrialization Center

  • Kim, Ji-In;Park, Jeong-Min
    • Journal of the Korea Society of Computer and Information
    • /
    • v.25 no.2
    • /
    • pp.221-229
    • /
    • 2020
  • As the cosmetics beauty industry grows into a key next-generation industry, the establishment of an industrialization center is needed, but failure to verify the adequacy and feasibility of the investment could lead to financial burdens. In this study, the project costs and facilities of an industrial center are reviewed to analyze its economic feasibility based on the cost estimates, revenue estimates, estimated profit or loss calculations, and estimated operating cash flows. The profit estimation criteria were analyzed by applying 90 per cent of expected orders for research projects (24 billion won) and 12 per cent of rental rates for testing equipment (4.5 billion won for construction), and the benefit/cost ratio is higher than 1.02 per cent and the net present value is higher than '0' won, and the internal rate of return is also more than 5.06 per cent for all three analytical methods. Therefore, in order for the construction of a cosmetics beauty industrialization center to be economically feasible, it is necessary to maintain research project orders of more than 90 percent and return on equipment rent of more than 12 percent, and a strategic approach is needed to diversify business profits.

A methodology for Predicting Equity Input Timing/Amount for Decision Making of Financing Apartment Housing Projects - From the Perspective of Mid-sized Construction Companies - (공동주택 PF사업 참여 의사결정을 위한 자기자본 투입 시점/규모 예측방법론 - 중견 건설사의 관점에서-)

  • Yoo, Jinhyuk;Cha, Heesung;Shin, Dongwoo;Kim, Kyungrai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.21-30
    • /
    • 2016
  • The current PF project is entirely relying on construction company's credibility. As such, it has increased a negative and bad recognition in domestic real estate economy. In addition, PF experts has a perception that a project's safety of future cash flow profitability is more important than the construction company's credibility. So many PF experts make an effort in order to set aside safe project structure of PF and analyse systematically the risks of the project. In common feasibility study of the PF Project, financial specialists and real estate specialists are forecasting and evaluating the suitability of the project through reviewing the development profit from the project of sales. However, cash flow analysis and evaluation from the perspective of mid-sized construction companies are still in the primary level. Therefore, this study has analysed the current feasibility study and go/no go decision making procedures. Then the authors have a new cash flow analysis method from the perspective of mid-sized construction companies, by improving the feasibility study and go/no go decision making procedures.

Probability-based Cost Analysis for Recycling Secondary Products from Construction Waste (건설폐기물 재활용 2차 제품에 대한 확률모델 기반 비용분석)

  • Kwon, Kihyon;Kim, Do-Gyeum;Lee, Ho-Jae;Seo, Eun-Ah
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.8 no.2
    • /
    • pp.227-234
    • /
    • 2020
  • Under consideration of construction waste recycling, candidate secondary products applicable for the civil and construction areas can be reliably employed based on the recycling cost analysis. For the validation purpose, probability-based cost analyses were performed to estimate recycling cost profit considering uncertainties. When recycling construction wastes, the costs at each stage are fully dependent on target products to be adopted. To achieve commercialization of each product, its quality has to be improved with economic efficiency through accurate evaluation of input costs. Based on the probabilistic recycling cost analysis, the cost benefit for target products was estimated with waste classification cost, transportation cost to recycling treatment facilities and production cost. All necessary information on the cost analysis were collected from literature, disclosure, and existing recycling companies. In addition, a cost difference between recycled and non-recycled events was made. As a result, a probability-based recycling cost estimate for candidate secondary products was herein presented.

A Selection Model For Power Plant Project Delivery Method (화력발전소 발주방식 비교를 통한 적정 발주방식 선정 모형)

  • Kim, Sun-Kuk;Park, Jong-Kyoo;Park, Chan-Sik;Son, Ki-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.66-77
    • /
    • 2007
  • With the electricity industry structure reformation of the government in April, 2001, Korea Power Electric Corporation was divided in to Korea water power nuclear power and 5 thermal power plant. After, various delivery method is introduced and applied for active profit creation according to the competition between each development companies for the public company privatization. However, the current situation does not satisfy the project participant by selecting the delivery method without reflecting the business goal and project characteristics of power plant construction business. The objective of this study is to research the influencing factors that should be considered to select the delivery method in thermal power construction business and develop a standard of selection of appropriate delivery method through questionnaire and interviews to establish a model to select the delivery method that fits the business goal of the subject of delivery. In the future, if the delivery method selection model suggested in this study is applied, it is expected to select the appropriate delivery method of power plant construction business by effectively reflecting the business goal, characteristics and demand of the delivery subject, and characteristics of the construction business apart from the existing customary practices that decided the delivery method dependent on the subjective and experience based judgement.

VRIO Model Based Enterprise Capability Assessment Framework for Plant Project (VRIO 모델 기반의 기업역량평가 프레임워크 제시에 관한 연구 - 플랜트 사업을 중심으로 -)

  • Min, Byeong Su;Min, Jang Hee;Jang, Woosik;Han, Seung-Heon;Kang, Sin Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.61-70
    • /
    • 2016
  • Construction enterprises have performed various projects such as buildings, infrastructure and plant projects in the international market. Among these, the plant project's amount of orders accounted for about 68.9% of all. However, because of the enterprises won a contract with a low-budget for plant project in the last 10 years, the profit has dropped dramatically. And it is forecasted that there are extreme competition for bid award of plant projects because of the current falling oil prices and raising interest rates. In this circumstance, the comprehending of enterprises strength and weakness must be a priority to get a sustainable competitive advantage. Therefore this research suggests the enterprises's capability assessment framework and it is in order to diagnose the korean construction enterprises capabilities. The framework is based on the VRIO model that is on the basis of resource based theory. First, the capability assessment indices and their importance and priority that based on the life-cycle of plant project is deducted by literature review and survey. Second, the 5 point likert score applied VRIO survey is conducted to diagnose the enterprises and quantified the survey result using the fuzzy theory. Lastly, the competitvie implication and capability assessment are deducted.

Competency Assessment of Korean Construction Firms on International Plant Projects (국내 기업의 경쟁력 및 업무역량 분석 - 해외 플랜트 사업을 중심으로 -)

  • Jang, Hyoun-Seung;Lee, Bok-Nam;Choi, Seok-In;Koo, Bon-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.173-181
    • /
    • 2008
  • Last decade, Korea's export scale has resulted in remarkably increasing tendency, and the Korean construction firms(KCFs)' activities on the global markets also have been revitalized. Therefore, this paper analyze a correlation between changes in the oversee market conditions and firms' competitiveness focused on plant business. The aim of this paper is to analyze the internal competency change of the KCFs on the global markets in the past 5 years and to find gap of internal competencies between KCFs and outstanding foreign firms. From a survey analysis this paper found that the external impacts on the global markets(changes of exchange rates, raw materials prices, supply-demand conditions, etc.) have highly influenced the sales amount of the KCFs. But the impacts to change the operating profit have been analyzed as not important. So it is necessary to reinforce the KCF's internal competencies rater than expecting an improvement of the external conditions. Also, the KCFs should strengthen the design engineering as a core competency.

Prospect Theory and Risk Preferences of Real Estate Development Companies (부동산 개발 및 공급 기업의 손익과 경영진의 위험 선호도)

  • Kim, Byungil;Kim, Won Tae;Chung, Do-Bum
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.1
    • /
    • pp.83-88
    • /
    • 2022
  • Companies make decisions with risks such as choosing an investment plan in order to pursue profits. This study explained the decision making of the management of construction companies in South Korea using the tendency to avoid losses in the Prospect Theory. To this end, 20-year financial data of 2,881 companies engaged in real estate development, which have to bear the greatest risk among the construction industry, were collected. The collected companies were roughly classified based on the reference point, and the causal relationship between average return on equity and risk preference by group was empirically analyzed through regression analysis. As a result, it was confirmed that if the average return on equity of a company decreases for the group above the reference point, it tends to select an investment plan with low uncertainty in order not to lose additional money. In addition, it was confirmed that if the average return on equity of a company decreases for the group below the reference point, it tends to select an investment plan with high uncertainty to move to the profit area. This result is exactly consistent with the loss aversion tendency of the Prospect Theory.

Predicting Project Performance by Analyzing Key Success Factors on Project Fiancing(PF) Development (건설 프로젝트 파이낸스(PF) 사업의 성공영향요인(KSF) 분석을 통한 사업성과 예측 모델)

  • Lee, Dong-Gun;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.5
    • /
    • pp.127-137
    • /
    • 2014
  • Project Financing (PF) development project is the type which influences national economy and building industry largely because it is exerted by using borrowed money from many kinds of investors and huge amount of financial raising. Many domestic PF projects are focused mainly on the profit maximization lacking in a sufficient feasibility study. Nowadays many projects are suspending due to the global finance debacle and stagnation of real estate industry. Therefore, in this paper, risk factors of PF project are deducted and Key Success Factors (KSFs) are derived through Factor-Analysis and qualified using Fuzzy-AHP method. And through the evaluation of the derived success factors in real projects, a strong correlationship has been identified between the score of each PF success factor and the level of success and/or expected rate of return (ROR). So, the result of this paper can help decision makers of the PF projects make a better decision and give a meaningful guidance in achieving successful PF projects.

Review of Real Options Analysis for Renewable Energy Projects (실물옵션 기법을 활용한 신재생에너지사업 경제성분석에 관한 연구)

  • Kim, Kyeongseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.2
    • /
    • pp.91-98
    • /
    • 2017
  • Due to climate change, countries around the world are actively investing in renewable energy, reducing fossil fuel use. 23.7% of world electricity is supplied by renewable energy. As the technology continues to develop, it is in a level to compete in terms of power generation cost, and investment conditions are improving. However, investment in renewable energy projects is not easy. This study analyzed trends of domestic and international researches on economics assessment applying real options analysis to investment decisions of hydro, solar, and wind power projects, which account for a large portion of renewable energy. This study provides (1) the difference between the traditional economic method and the real options analysis, (2) the application process, and (3) the uncertainty elements and option type of the renewable energy project presented by many studies. The real options analysis is suitable for the detailed investment strategy by considering the uncertainties of the renewable energy project and applying the option to improve the profit or to avoid the risk.