• 제목/요약/키워드: construction problems

검색결과 4,587건 처리시간 0.033초

멀리온을 레일로 활용한 커튼월의 시공에 따른 경제성 평가 (Economic Evaluation according to Construction and Curtain Wall Mullion as a Rail)

  • 정의인;홍상훈;공희민;김봉주;염상수;강희태
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.17-18
    • /
    • 2016
  • Today, many kind of buildings are higher than those of previous generations, and Curtain Wall is adapted broadly as an outer wall material. But weather and environmental condition could cause problems in curtain wall construction in most construction projects. High wind speed and unplanned lifting equipment's allocation could cause construction delay and cost increase. To solve these problems, we suggest using a curtain wall mullion as a rail to lift curtain wall which is less affected wind speed. And we would like to show a preliminary data of its economic advantage evaluation.

  • PDF

다 자유도 매니퓰레이터를 이용한 커튼월 시공 자동화에 관한 연구 (A Study of the Automation System using a Multi-DOF Manipulator for the Curtain Wall Installation in a Skyscraper)

  • 유승남;이승열;최현석;이계영;이상헌;한창수
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2004년도 춘계학술대회
    • /
    • pp.940-945
    • /
    • 2004
  • Recently, the trend in architectural forms has been toward taller and larger building. The building materials, therefore, are getting larger and heavier as wall. Most of the construction projects are, however, dependent on outdated equipment and human resources. Construction processes up to now face a number of problems, including dangerous work, high construction cost and heterogeneous construction quality. In various construction sites, automation in construction has been introduced to address these problems. This paper proposes a human-machine cooperative system in the construction site; the system utilizes construction of a curtain wall in tall buildings. The use of automation system at construction sites can reduce the need of human involvement. Construction time and cost can be reduced as well. The most important aspect of the use of automation system at construction sites is prevention of accidents.

  • PDF

Mobile Computing을 통한 Personal Digital Assistant(PDA) 기반의 건설정보관리 시스템 (Construction Information Management System of the Basis of Personal Digital Assistant(PDA) through Mobile Computing Methodologies)

  • 이태식;이성현
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.475-478
    • /
    • 2001
  • 현재까지 건설 산업에서의 정보화는 계속되는 노력에도 불구하고 타 산업에 비해 저효율의 활용 구조를 가지고 있다. 이와 같은 문제점은 이제까지 건설 산업의 정보화를 위한 노력이 대부분 건설 산업이 가지는 현장 중심적 특성이 고려되지 않은 가운데 타산업에서 사용되는 시스템 자체를 그대로 도입하여 운영되어졌다는 점에 있으며, 건설정보화 문제점 해결에 있어서도 사용 주체 위주의 편의성이 무시된 정보 시스템 구축이 이와 같은 문제점을 더욱 가중시키고 있다는 점을 지적할 수 있다. 따라서. 본 연구에서는 이러한 건설정보화 문제점을 해결하는 새로운 접근 방법으로서 향후 정보산업의 핵심으로 떠오르고 있는 Mobile Communication 개념의 Personal Digital Assistant(PDA)을 이용한 건설정보관리 시스템의 구축과 그에 대한 활용을 통하여 현 건설정보시스템이 가지고 있는 문제점들을 해결하는 데 그 목적을 두고 있다.

  • PDF

Legal Direction of Defect Warranty Liability in the Korean Construction Industry

  • Cho, Young-Jun
    • 한국건축시공학회지
    • /
    • 제18권2호
    • /
    • pp.195-202
    • /
    • 2018
  • The defects that are bound to arise in most construction projects cause disputes among the contracting parties regarding the defect warranty liability (DWL)guaranteed by the retention of the contractor's performance security at the end of the performance period of the contract. Most current projects involve a multiple-tier contractual relationship, causing the liability for some defects to overlap. In addition, many construction projects are made up of multiple detailed work types which an expert hired by the owner inspects the part completed by the contractor and pays an interim payment. However, after the completion of work, the contractor will still hold the defect warranty liability. In a scenario in which the work is delayed due to reasons for which the owner is responsible, the defect warranty liability period is also increased, imposing an additional burden on the contractor. In this study, basic research was carried out with the goal of reducing problems related to defect warranty liability Problems related to defect warranty liability cases and the nature of the defect warranty liability period were investigated. Possible solutions to the problems caused by the DWL that were suggested include the separation of the negligence liability period and the strict liability period, as well as the introduction of a retention money system.

프로젝트 초기 단계에서의 분쟁방지를 위한 분쟁요인 추출에 관한 연구 - 턴키공사 사례 중심으로 - (A Study of Abstracting Dispute Factor to Prevent Dispute in Early Stage for Construction Project - Focusing on Turn-Key Project -)

  • 윤준선;권기범;서춘택;백준홍
    • 한국중재학회지:중재연구
    • /
    • 제14권1호
    • /
    • pp.315-344
    • /
    • 2004
  • Although we try to increase the order of turn key construction for the international competitiveness strengthening, the construction quality advancement and the productivity enhancement of the public sectors, the problems of the domestic turn key systems are causing the hardships of all the participants and many possible disputes. The home turn key constructions have been activated since 1997. A lot of trial and error had been experienced in these days, and the turn key systems have been changed little by little. But the bases are continuously kept because of their reflecting all the participants' opinions. In the inner turn key constructions the problems of uniform types are repeatedly occurred, and, especially, many problems happen up to the stage of early stage owing to the specialties of the turn key construction. So the dispute factors of the Korean turn key constructions were abstracted through the literature searches, the site document examinations, the case studies and the interviews with the experts. When the technicians meeting the interior turn key construction for the first time and working here now are well acquainted with only these factors, many disputes will be prevented.

  • PDF

북한 PUST 디지털도서관 모델 개발 연구 (A Study on the Development of Digital Library Model for PUST in North Korea)

  • 이종문
    • 정보관리학회지
    • /
    • 제25권3호
    • /
    • pp.143-158
    • /
    • 2008
  • 본 연구는 남북합작으로 건립하는 PUST에 설치될 도서관과 디지털도서관 모델 제시를 위해 수행되었다. 우선 이론적 연구를 통해 디지털도서관의 문제와 PUST 디지털도서관의 이슈를 파악하였다. 그 결과, 저작권법하의 공정사용 미흡 등으로 현 단계에서 디지털도서관만 운영하는 것은 문제가 있는 것으로 파악되었다. 또 남북의 언어와 지적기반의 차이 등으로 홈페이지 접근 데이터베이스 구축 자료 의 검색 등에 문제가 있는 것으로 파악되었다. 이에 연구자는 디지털도서관과 하이브리드 도서관을 병행 운영할 것과, 디지털도서관 관련 하여 유니코드를 통한 홈페이지의 이중화 NCHAR 데이터타입 설정을 통한 다국어 저장, 전거 데이터베이스 구축 등을 제안하였다.

공동주택 실적공사비 산정시 공종별 변동요인에 관한 연구 (A Study on the Change Factors by Activities for Estimating Historical Cost on Apartment Housing Projects)

  • 유용환;이규현;김종원;최인성
    • 한국건축시공학회지
    • /
    • 제4권4호
    • /
    • pp.117-126
    • /
    • 2004
  • Construction industry is faced with the problems such as the quickly changeable circumstance and increasing construction companies due to regulation mollification of company registration. In order to overcome these problems, new estimation system based on historical estimation cost is ready to introduce by government step by step. But the time of transition for estimation system causes another problems such as chaos addition to simultaneity of a standard of estimation system and new estimation system, lack of related regulation, accumulation of historical extensive cost data, and adjustment methodology when historical estimation data is applied to next projects. The purpose of this study is to suggest the change factors by activities for estimating historical cost for apartment housing projects. New estimation system is based on historical construction data. For application of this system, the standard adjustment methodology system is necessary. and extensive cost data should be accumulated under an unified construction work classification system. Therefore in this study, according to the construction work classification system, every apartment housing project was classified to 16 work classifications, and 7 major composed items which occupy more than 85% of construction costs are analyzed by detailed activities and by average ratio and maximum ratio each of them. In the result of the study, furniture work, foundation work and masonry work are the works which have big gap of costs between average ration and maximum ratio. In addition to suggestion of change factor by work species, 5 qualified construction specialists are interviewed and change factors in 7 major works are analyzed.

초고층 복합시설물의 4D CAD 모델링 사례연구 (Case Study of 4D CAD Modeling in Hi-Rise Complex Buildings Project)

  • 권오성;박우열;조훈희;강경인
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.187-192
    • /
    • 2001
  • 국내 건설생산체계는 설계단계에 시공성의 반영이 어려워 시공단계에서 많은 시행착오와 잦은 선계변경이 요구되고 있다 특히 불확실성이 높은 도심지 건축될, 그 중에서도 초고층 복합 건물 프로젝트의 경우, 시공과정을 반영한 설계의 중요성은 더욱 중요한 요소가 된다. 본 연구에서는 국내 정보분류체계를 근간으로 기초조사를 통하여 현장의 시공계획에 필요한 데이터를 수집 이를 시스템화 할 수 있는 방안을 모색하였다. 또한, 이를 본 시스템에 적용하여 3D CAD와 공사 계획 및 시뮬레이션 시스템으로 공정 시뮬레이션 및 타워 크레인 시뮬레이션을 구현하여 초고층 공사 수행시 발생할 수 있는 문제점을 미리 검토 및 해결하여 초고층 프로젝트 공사의 합리화와 생산성 향상을 위한 공사관리시스템을 실제 프로젝트에 구현하였다.

  • PDF

건설교육기관의 기능교육 실태분석 및 개선방안 (A Status Analysis on the Technical Education of Construction Education Institutes and Its Improvement Measures)

  • 유성곤;손창백
    • 한국건설관리학회논문집
    • /
    • 제20권4호
    • /
    • pp.86-93
    • /
    • 2019
  • 건설업은 양질의 기능인력이 확보되고 양성되어야 하지만 현재 건설 기능인력은 대부분 건설현장에서 체계적인 교육 없이 도제식 교육을 통해 양성되고 있다. 국내에는 건설 기능인력 양성기관으로, 국비지원 교육 훈련과정을 시행하는 교육기관이 존재하지만 교육기관을 통해 배출되는 신규인력은 건설현장의 수요에 미치지 못하며, 건설근로자가 국비지원 교육 훈련을 수강하는 경우도 적은 실정이다. 이에 본 연구는 교육기관의 교육 훈련을 개선하기 위해 교육기관에서 이루어지고 있는 국비지원 교육 훈련실태 및 문제점을 분석하고, 교육체계의 중점개선사항을 도출하였다. 개선방안으로는 주요 문제점과 중점개선사항으로 분석된 비용측면의 어려움을 개선할 수 있는 개선방안을 제시하였으며, 본 연구의 결과는 교육기관의 교육 훈련 활성화에 도움이 될 것으로 판단된다.

2D 도면 및 3D 모델링 분석을 통한 실내 건축공사 품질향상 체크리스트 제안 (Quality Improvement Checklist for Interior Construction based on 2D Drawings and 3D Modeling Analyses)

  • 이준섭;방홍순;김옥규
    • 한국건축시공학회지
    • /
    • 제22권3호
    • /
    • pp.269-280
    • /
    • 2022
  • 건축물이 재산적 가치가 높아지면서, 국내외에서 실내 건축공사를 많이 하는 추세이다. 실내 건축공사는 물량 산출 및 적산까지 가능한 BIM 모델링의 기술까지 발전하였다. 실제 현장에서 반영하기에는 부담스러운 금액과 공정에 따라, 2D 도면과 3D 모델링을 통하여 진행하는 추세이다. 2D 도면과 3D 모델링은 서로 장단점이 존재하여 각 실내 건축공사에서는 시공 중 하자가 발생하고 있다. 실질적인 문제를 파악하기 위해 실내 건축공사의 현장 문제점, 2D 도면분석, 3D 모델링 분석, 사전 리스크 요인을 분석하였다. 문제점 분석 결과 1) 발주자와 의사소통 2) 노무자와 의사소통 3) 도면의 이해 등 여러 가지 문제점이 도출되었다. 본 연구에서는 이를 해결 할 수 있는 실내 건축공사 품질향상 체크리스트 제안을 하였다.