• Title/Summary/Keyword: construction problems

Search Result 4,601, Processing Time 0.035 seconds

Analysis of Exhaust Gas Measurement Data in Excavators for Environment-friendly Construction Operation Planning (친환경 공정계획 수립을 위한 굴착기의 배기가스 계측 데이터 분석)

  • Go, Jee-Eun;Lee, Jin-Woo;Chae, Yoon-Byung;Han, Seung-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.100-101
    • /
    • 2018
  • Environmental problems caused by air pollution have been considered as serious critical issues in global perspectives. Controlling greenhouse gases has become one of the major environmental problems in construction fields as well. However, similar studies were mainly focused on suggestion of various methodologies for measuring CO2 emissions of construction equipment and calculating emissions. This study aims to analyze the correlation between the CO2 emissions and RPMs of equipment by the construction process based on row data collected from construction equipment actually operated in job sites. This study allows site personnels to determine the amount of emitted CO2 under particular construction equipment under specific conditions during the targeted construction operations. The research findings expect to be used as fundamental informations for establishing environment-friendly construction operation planning.

  • PDF

A Study on the Application Method of Construction Site Direct Construction System - Centered on domestic construction case - (건설현장 직접시공제도의 활용방안에 대한 연구 - 국내 건설 사례 중심으로 -)

  • Baek, Jae-Chul;Ock, Jong-Ho
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.11
    • /
    • pp.171-180
    • /
    • 2019
  • This research proposed the Direct Construction System for construction corporations as a strategy intended to perform cause analysis of construction technician shortage matter and solve resulting problems, and in view of the outcomes from the application of this system to the projects and workshops, it was verified that unsteady employment, lack of career prospect, and conditions of work environment can be resolved. In addition, from corporations' perspective, it is considered that by clarifying the abovementioned three problems, fundamental complications of construction administration, quality control, safety supervision, and cost management were settled, concluding forthcoming advancement of domestic construction business quality fell far behind developed counties.

Efficient Elitist Genetic Algorithm for Resource-Constrained Project Scheduling

  • Kim, Jin-Lee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.235-245
    • /
    • 2007
  • This research study presents the development and application of an Elitist Genetic Algorithm (Elitist GA) for solving the resource-constrained project scheduling problem, which is one of the most challenging problems in construction engineering. Main features of the developed algorithm are that the elitist roulette selection operator is developed to preserve the best individual solution for the next generation so as to obtain the improved solution, and that parallel schedule generation scheme is used to generate a feasible solution to the problem. The experimental results on standard problem sets indicate that the proposed algorithm not only produces reasonably good solutions to the problems over the heuristic method and other GA, but also can find the optimal and/or near optimal solutions for the large-sized problems with multiple resources within a reasonable amount of time that will be applicable to the construction industry. This paper will help researchers and/or practitioners in the construction project scheduling software area with alternative means to find the optimal schedules by utilizing the advantages of the Elitist GA.

Procedural Problems in Academic Writing Faced by International Students (외국인 대학생이 작성 중인 학술 보고서에 나타난 제(諸) 문제)

  • Kim, Jiyoung
    • Journal of Korean language education
    • /
    • v.28 no.1
    • /
    • pp.23-47
    • /
    • 2017
  • This research analyzed procedural problems presented in academic writing faced by international students. The result of this research will serve as a basis for suggesting methods of developing a curriculum in Korean writing as a liberal arts education designed for international students. To analyze problems presented in academic writing by international students, the standard of assessment was divided into interaction, knowledge construction, and material quotation. Then, knowledge construction was divided into contents, structure, and expression, and the items were subdivided in each category. These categories of assessment correspond to the genre of academic writing and are different from the existing standard of assessment for academic writing. Applying these standards, this research analyzed 43 texts of academic writing in process for a final paper by international students in an class and presented problems in them. Furthermore, this paper aims to give detailed feedback that can help solve those problems.

Identifying Wastes in Construction Process and Implementing the Last Planner System in India

  • Bhatla, Ankit;Pradhan, Bulu;Choi, Jin Ouk
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.1
    • /
    • pp.11-19
    • /
    • 2016
  • Most of the Indian contractors are not well equipped to handle the growing demand of infrastructure development; hence construction projects frequently run in to time and cost overruns, disputes and quality issues. This study aims to improve the construction industry in India by implementing lean principles to eliminate non-value adding activities (wastes). The purpose of this study is to 1) identify the wastes and their sources affecting the construction process, and 2) to identify problems and document lessons by applying a Last Planner System (LPS) to a sample project. First, the researchers identified that Delays, Rework, and Interruptions were the most critical wastes affecting the construction process and Poor management control, Poor Planning and Shortage of Resources were the major sources of the above mentioned wastes. Second, the researchers report the Percent of Planned Complete (PPC) analysis results and experienced problems after implementation of LPS at the sample project. It was observed that much more improvement could have been achieved if there was consensus between the owners and the contractor on the implementation of the LPS in its entirety. Some of the problems experienced in the implementation of the LPS like lack of scheduling, resource and material shortage were found to be similar to those in developed countries.

A Study on Problems and Improvement of Disaster Prevention Technology Guidance(Focused on construction disaster) (재해예방 기술지도의 문제점과 개선방안에 관한 연구 (건설 재해를 중심으로))

  • Roh, Tae-Woo;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.18 no.4
    • /
    • pp.47-55
    • /
    • 2016
  • Recently, industrial accidents rate has been gradually decreasing due to the development of safety management methods, but until now, the accident rate in the construction sector is higher than other industries. Large-scale construction sites are operating systematic safety systems to reduce industrial accidents. However, small and medium sized construction sites do not have systematic safety system and lack safety management ability, so that disaster is not reduced compared with large scale construction site. As a result, disaster prevention technology instruction system has been implemented to reduce the disasters of small and medium scale construction sites. However, in the case of a small construction site less than 2 billion won, there is little decrease in the accident rate, and in some cases, the accident rate increases. After the technical guidance system has been implemented, it is necessary to identify the performance and problems of implementation and to improve its effectiveness. In this study, we suggest the improvement plan to improve the efficiency of the technical guidance system by analyzing the problems and actual conditions of technical guidance operation in small and medium sized construction work sites.

Analysis of worker's Ageing in Small-size Construction Sites in Busan (부산지역 소규모 건설현장 근로자의 고령화 실태조사 및 개선방안)

  • Lee, Sang-Ho;Huh, Young-Ki
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.12
    • /
    • pp.51-56
    • /
    • 2018
  • Due to the aging of economically active population in the world, the average age of workers in the domestic construction industry is also steadily increasing. This study analyzes the aging of construction workers in small-size construction sites in Busan, where the aging of the economically active population is the most severe in Korea. As a result of the study on the aging of construction workers in six construction sites with a construction cost of less than 500 million won in Busan, it was found that 65% of the workers were over 50 years of age. In addition, several experts interviews and survey revealed that 'securing welfare facilities for construction workers' and 'diminishing prejudice about the construction industry" were the most urgent and effective methods to overcome the aging problems. The results of this study can be served as basic data to solve the aging problems in the industry.

The Problems and Measures in Design and Construction of LPS based on KS (한국산업규격에 의한 피뢰설비 설계 및 시공의 문제점과 대책)

  • Lee, Ki-Hong;Lee, Taek-Soeb
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2005.05a
    • /
    • pp.346-348
    • /
    • 2005
  • This paper presented problems occurred in design and construction of LPS(Lightning Protection System) based on the new KS(Korea Standard), and proposed various solution for those. Imperfect KS, poor data on lightning characters in Korea lack of train for engineer, immature SPD engineering and absence of LPS design sample for various buildings are main problems. We suggested that comprehensive measures attending every persons and organizations relevant LPS are needed to solve the problems.

  • PDF

BIM Application Method for the Quality Management of Modular Houses (모듈러주택 품질관리를 위한 BIM 적용 방안)

  • Lee, Dong Gun;Kim, Jin Won;Sohn, Jeong Rak
    • Land and Housing Review
    • /
    • v.10 no.2
    • /
    • pp.59-67
    • /
    • 2019
  • The recent paradigm shift in the construction industry has led to a growing demand for industrial construction. In particular, interest in modular housing, one of the areas of industrialization architecture, is soaring. Modular housing is a construction method for completing a building by transporting factory-built modules to the site and assembling them. However, modular housing in Korea has various problems such as errors in design books, lack of factory drawings, and lack of on-site construction plans. BIM is a tool for accumulating, producing and managing various information through 3D models and is a solution to solve various problems of modular housing. In this study, problems of modular housing and BIM utilization of modular housing were presented as ways to ensure the quality of modular housing. Therefore, this study analyzed the problems that are occurring in the construction process of modular housing. And, to address the problem of modular housing, BIM utilization measures were proposed for each modular process step. However, the application of BIM in domestic modular project is currently being carried out in pilot research project. Because of this, the BIM utilize method for modular housing is limited based on the BIM use for general projects and the examples for some modular pilot projects.

Analysis and Countermeasures for the Problem Arise of the Spot Installation Pile Using SIP (SIP공법 시공시 문제점 발생 요인 분석 및 대응 방안)

  • Park, Jong-Hyuk;Park, Hong-Tae;Jeon, Yong-Bae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.7
    • /
    • pp.3287-3295
    • /
    • 2011
  • Currently in construction Soil-cement Injected Precast pile of buried pile method are in wide use. But deterioration in pile quality and faulty construction can be often found these days because of problems arise in the construction field. For this study, survey was carried out by targeting construction engineers working in the field in order to identify the types and the causes of problems arise based on SIP(Soil-cement Injected Precast) method. By analyzing the causes of problems arise, countermeasures could be presented. The data and the analysis presented in the study could be effectively used for minimizing problems arise in future during SIP method construction.