Identifying Wastes in Construction Process and Implementing the Last Planner System in India  

Bhatla, Ankit (Dept. of Civil Engineering, Indian Institute of Technology Guwahati)
Pradhan, Bulu (Dept. of Civil Engineering, Indian Institute of Technology Guwahati)
Choi, Jin Ouk (Dept. of Architecture and Civil Engineering, City University of Hong Kong)
Publication Information
Journal of Construction Engineering and Project Management / v.6, no.1, 2016 , pp. 11-19 More about this Journal
Abstract
Most of the Indian contractors are not well equipped to handle the growing demand of infrastructure development; hence construction projects frequently run in to time and cost overruns, disputes and quality issues. This study aims to improve the construction industry in India by implementing lean principles to eliminate non-value adding activities (wastes). The purpose of this study is to 1) identify the wastes and their sources affecting the construction process, and 2) to identify problems and document lessons by applying a Last Planner System (LPS) to a sample project. First, the researchers identified that Delays, Rework, and Interruptions were the most critical wastes affecting the construction process and Poor management control, Poor Planning and Shortage of Resources were the major sources of the above mentioned wastes. Second, the researchers report the Percent of Planned Complete (PPC) analysis results and experienced problems after implementation of LPS at the sample project. It was observed that much more improvement could have been achieved if there was consensus between the owners and the contractor on the implementation of the LPS in its entirety. Some of the problems experienced in the implementation of the LPS like lack of scheduling, resource and material shortage were found to be similar to those in developed countries.
Keywords
Lean; Construction Wastes; Sources of Wastes; Last Planner; India;
Citations & Related Records
Times Cited By KSCI : 3  (Citation Analysis)
연도 인용수 순위
1 A. Serpell, A. Venturi, and J. Contreras, "Characterization of waste in building construction projects", in Lean Construction, L. Alarcon, Editor, A.A.Balkema: Rotterdam, pp. 68-81, 1997.
2 G. Ballard, "The Last Planner System of production control", University of Birmingham, England, 2000.
3 C. Fiallo, and V. Revelo, "Applying LPS to a construction project: a case study in Quito, Ecuador", Proceedings of the 10th IGLC Conference, Gramado, 2002.
4 E. Johansen, and G. Porter, "An experience of introducing LPS into a UK construction project", Proceedings of the 11th IGLC Conference, Blacksburg, VA, 2003
5 S. Gao, and S. Low, The Last Planner System in China's construction industry - A SWOT analysis on implementation, International Journal of Project Management, Volume 32, Issue 7, October 2014.
6 G. Ballard, "Phase Scheduling", Lean Construction Institute, 2000
7 L.F. Alarcon, "Tools for the identification and reduction of wastes in construction projects", in Lean Construction, L. Alarcon, Editor A.A.Balkema: Rotterdam, pp. 374-388, 1997.
8 A. Bhatla, "Implementation of Lean Construction in IIT Guwahati." bachelor BTP REPORT, Indian Institute of Technology Guwahati, Guwahati, India, 2010.
9 K. Charmaz, "Constructing Grounded Theory: A Practical Guide through Qualitative Analysis". Sage, Thousand Oaks, CA., 2006
10 J. Green, and N. Thorogood, "Qualitative Methods for Health Research." Sage, Thousand Oaks, CA., 2004
11 A. O. AlSehaimi, P. T. Fazenda, and L. Koskela, "Improving construction management practice with the Last Planner System: a case study." Engineering, Construction and Architectural Management, 21(1), 51 - 64, 201   DOI
12 A. Laskar, C.V.R. Murty, "Challenges before Construction Industry in India", Proceedings of the 7th National Conference on Construction, New Delhi, India, 2004.
13 K. Ramaswamy, S.N. Kalidindi, "Waste in Indian Building Construction Projects" 17th Annual Conference of the International Group for Lean Construction. Taipei, Taiwan, 15-17 Jul 2009.
14 World Bank, "India: Indian Road Construction Industry Capacity Issues, Constraints & Recommendations", 2008.
15 H.D. Khanh, S.Y. Kim, "Barriers of Last Planner System: A Survey in Vietnam Construction Industry", KICEM Journal of Construction Engineering and Project Management, vol. 3, no. 4, pp. 5-11, 2013.   DOI
16 H.D. Khanh, S.Y. Kim, "Practitioners" Perception on Relationship between Production Planning and Waste Occurrence in Construction Projects", KICEM Journal of Construction Engineering and Project Management, vol. 4, no. 3, pp. 1-12, 2014.
17 A.A. Banawi, M. Bilec, "Applying Lean, Green, and Six-Sigma Framework to Improve Exterior Construction Process in Saudi Arabia", KICEM Journal of Construction Engineering and Project Management, vol. 4, no. 2, pp. 12-22, 2014.   DOI
18 A. AlSehaimi, L. Koskela, and P. Tzortzopoulos, "The need for alternative research approaches in construction management: the case of delay studies", Journal of Management in Engineering, Vol. 29 No. 4, pp. 407-413, 2013   DOI
19 L. Koskela, "Lean production in construction", in Lean Construction, L. Alarcon, Editor, A.A.Balkema: Rotterdam, pp. 1-10, 1997.
20 G. Ballard, and G. Howell, "Implementing Lean Construction: Stabilizing work flow", in Lean Construction, L. Alarcon, Editor A.A.Balkema: Rotterdam. pp. 105-114, 1997.