We study on a Mohr-Mascheroni theorem, which is the followings: If a construction problem is solved by euclidean tools(compass and ruler), then it can be solved using only compass. Though it is known that Mohr-Mascheroni theorem was proved by Mascheroni, but we have not any materials concerned with Mascheroni's work. In order to investigate Mohr-Mascheroni theorem, we analyze Euclid's Elements, and we draw some construction problems, which are essential for proving Mohr-Mascheroni theorem. We solve these problems using only compass. Though we don't solve all construction problems of Euclid's Elements, we can regard that Mohr-Mascheroni theorem is proved.
Proceedings of the Korean Institute of Building Construction Conference
/
2023.05a
/
pp.361-362
/
2023
In construction work, there is often a difference between the estimated construction period and the actual construction period. Accordingly, the project may be delayed from the scheduled date, leading to huge losses due to problems such as increased costs during construction. In this way, it is important to calculate the appropriate construction period at the project planning stage in construction work. To solve this problem, we would like to study a model that will increase the accuracy of the scheduled construction period at the project planning stage. This study compared and analyzed linear regression, Lasso regression, Ridge regression among the types of regression analysis to select an appropriate construction period prediction model to secure an appropriate construction period at the project planning stage to reduce problems during construction.
Journal of the Architectural Institute of Korea Structure & Construction
/
v.35
no.1
/
pp.29-36
/
2019
In the past, social insurance premiums, such as national pension and national health insurance, is contained within the costs of construction projects, have been lowered due to price competition of companies participating in the bidding. The government is implementing the "Ex-post settlement system" to improve the problem. Therefore, the purpose of this study is to examine the concept of an Ex-post settlement system and background of its introduction and to identify problems in the management of the system. The problems of the Ex-post settlement system are: 1) avoiding the participation of construction workers, 2) the rigidity of the insurance premium settlement method in construction field, and 3) the cause of direct construction cost reduction. The ways to improve these problems are: 1) excluding social insurance premiums from construction project cost, 2) securing flexibility of the settlement method of insurance premiums in construction field, and 3) expanding the scope of persons eligible to participate in social insurance.
International Journal of Precision Engineering and Manufacturing
/
v.9
no.3
/
pp.85-91
/
2008
Robot technology is a remarkably interdisciplinary research area, one that can be employed in various industrial fields as well as higher value-added fields. The construction industry, on the other hand, has been known as one of the most difficult research fields to apply robotic schemes. Therefore, applying robot technologies in the construction industry is quite a challenging topic. This paper aims to introduce the progress of automated robotic systems in construction fields, namely with respect to construction robots. While construction robots have a very wide range of application depending on the huge market size of the construction industry, there still exist a lot of problems such as highly risky working environment and inefficiency due to the labor intensive characteristic. In order to solve these problems, a variety of construction robots have been developed and, in this paper, the current state of the robotic systems for construction works and the vision of future robot technology in the construction field are introduced.
Korean Journal of Construction Engineering and Management
/
v.4
no.2
s.14
/
pp.99-108
/
2003
Recently, the construction companies are forced to cut down the investment amount due to increasing financial problems caused by severe recession and restructuring in the financial market as well as the long-term depression of the construction industry. To overcome this type of problems, a great many efforts have been made. An alternative may be adopting the advanced financing methods. However, during the course of enforcing process of the financing methods, many problems are revealed without any proper solutions being proposed. Therefore, the fundamental problems need to be solved through comprehensive and systematic approach under the changing environment of construction financing. In this paper, as a result of reviewing some financing methods such as ABS, REITS, and Project Financing, multiple business strategies for construction companies to cope with the changing construction market are found in the sense of effectiveness in implementing construction projects. Further, this paper presents diversified financing methods for the effective practice of construction projects through combination of above mentioned methods, and also proposes improvement plans to strengthen the financing function for the construction industry.
Journal of the Korea Institute of Building Construction
/
v.7
no.3
/
pp.67-73
/
2007
Increasing wages and decreasing skilled labors are problems awaiting solution. The development of automatic technologies contributes to accelerating the one of construction automation. Thus, this study is to suggest the way to develop the automated building construction system base on one performed in Japan in order to solve urgent problems of construction industry in Korea. Therefore interviews and questionnaires were performed based on experts who work for the automated building construction system field and analyzed through analytic hierarchy process. In doing so, it was the most important factor to develop a branch of automatic, mechanical or machine technologies for the automated building construction system. Especially the study indicated the importance of the technologies to substitute skilled labors such as a robot. This research could contribute to developing the automated building construction which is very unique and suitable for construction industry in Korea.
Proceedings of the Korean Institute of Building Construction Conference
/
2010.05b
/
pp.95-97
/
2010
Current trends in the Korean construction industry, including the aging of the workforce, a lack of new Korean construction workers, and an inflow of unskilled foreign labor, have caused a range of problems, including quality deterioration, reduced productivity, insufficient understanding of the function and difficulties in communication, to name a few. Yet while countermeasures to these problems should be based on accurate and diverse fundamental data, including the current status of demand and supply of domestic and foreign construction workers, the perception of construction workers, studies on these questions have, thus far, been scarce. For these reasons, this study was conducted using a questionnaire for managers and workers on construction sites, to secure fundamental data relating to construction workers. The findings of the survey showed that it is urgent to prepare measures to educate, train and foster human resources, considering the aging of the construction workforce and the lack of an inflow of new construction workers.
Noise and vibration occurs during construction intermittently, but with the most arise complaints. There is a need to efficiently manage the construction noise and vibration problems because in case a residential facility that requires calmness around the construction site adversely affects the living conditions of nearby residents. The ministry of environment has mandating the installation of soundproofing facilities for the management of construction noise. In order to enforce a particular construction, the mandatory install with soundproofing facilities before the start of construction, and after construction. However, Installation guide of soundproofing facilities for construction sites were not considered affected areas by noise and there is no provision of performance evaluation for soundproofing facilities. In this study, investigated the status and problems of the installation guide for soundproofing facilities in construction sites, we propose an efficient installation guide of soundproofing facilities for the reduction construction noise.
PURPOSES : This study aims to survey and analyze the status of the design and completion documents output delivery system in public construction projects in order to assess the problems of the Ministry of Land, Infrastructure and Transport (MOLIT)'s electronic delivery system, with a focus on roads and rivers, and to offer improvement measures. METHODS : This study first surveys and analyzes laws and existing study trends with regard to the design and completion documents output delivery system in public construction projects. It further analyzes the status of the output delivery system in public construction projects, including roads, rivers, expressways, water resources, and railroads. In addition, a comparative analysis of the current electronic delivery system of MOLIT and Korea Expressway Corporation in the road field is conducted, and the problems and improvement measures for MOLIT's electronic output delivery system are presented. This study seeks to analyze problems and prepare improvement measures with regard to road and river public construction projects, as ordered by MOLIT's five regional offices. RESULTS : This study sought to prepare the electronic output delivery system with regard to public construction projects and present the analysis of its major problems and improvement measures in four categories: "the preparation of electronic design documents output delivery system improvement measures including inspection and delivery," "preparation of guidelines, systems, etc., concerning electronic design documents," "preparation of improvement measures for the construction project management system and electronic design document support tools", and "linking of MOLIT's electronic output delivery system with relevant agencies and the expansion thereof to local governments." CONCLUSIONS : This study analyzed the current status and problems of the MOLIT's electronic output delivery system in the field of road and river construction projects, and presented corresponding improvement measures. This study is expected to address the problems of the MOLIT's electronic output delivery system, and to provide the foundation for the preparation of an efficient electronic output delivery system for design and completion documents. In addition, this study is expected to boost the quality and utilization of the electronic design documents output, and to exchange, share, and link construction information among relevant agencies so as to prepare the foundation for sharing construction information.
Journal of Korean Society of Occupational and Environmental Hygiene
/
v.22
no.4
/
pp.329-336
/
2012
Objectives: The aim of this study is to analyze main problems on occupational safety and hygiene in construction sites and to suggest some improvement methods. In order to decrease industrial accidents, I emphasize the approach paradigm shifts according to characteristics of construction workers. Methods: Pointing out the irrationality of current institutions by comparing bad outcomes of occupational safety and hygiene in construction industry and characteristics of construction workers. Results: In order to decrease industrial accidents, we need some approach paradigm shifts; the supply method of industrial safety and health fundamentals on the construction industry level, the accident rate calculation by using the actual construction workforce instead of an estimation, institutionalizing the prevention efforts themselves for industrial accidents, securing enough production costs for the precondition of occupational safety and hygiene in construction sites. Conclusions: I ascertain the need of the approach paradigm shifts for decreasing industrial accidents in the construction industry.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.