Development of an Approximate Cost Estimating Framework for River Facility Construction at Planning Stage (하천시설물 공사의 기획단계 개략공사비 산정체계 개발)

  • Shin, Jung Min;Woo, Sungkwon;Lee, Si Wook;Kim, Ok Ki
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.371-381
    • /
    • 2008
  • The systematic methodology for estimating construction cost approximately at planning and pre-design phase of a river facility construction project has not yet been established because of its unique characteristics including its relatively small project size in terms of cost. This research suggests a 4-level cost information structure and identifies critical factors affecting construction cost as a result of thorough analysis of accumulated historical cost data of river facility construction projects. Also, this research presents the framework of the approximate cost estimating methodology for river facility construction project a planning stage.

Applications of Agent-Based Modeling (ABM) in Planning and Design of Built Environments

  • Ali Khodabandelu;JeeWoong Park;Unmesa Ray
    • International conference on construction engineering and project management
    • /
    • 2024.07a
    • /
    • pp.606-612
    • /
    • 2024
  • The modeling and simulation of built environments are crucial preliminary steps for their design, planning, and management. Among various simulation methods, agent-based modeling (ABM) has recently gained traction for simulating built environments due to its ability to effectively model and capture complex interactions between simulated entities. The increasing applications of ABM for the simulation of built environments necessitate a comprehensive review of past scientific endeavors with positive accomplishments and those that remain unsolved. This study seeks to address this gap by reviewing ABM and its applications in the simulation of built environments, with a specific focus on the planning and design phases. First, the research introduces ABM and its unique features concerning the simulation of built environments. Second, it conducts a systematic review of past studies in the planning (e.g., feasibility analysis, risk management, and scheduling under constraints) and design (e.g., automated design, collaborative design, improving operations, and facilitating evacuation) aspects of built environments. Finally, following the in-depth review and subsequent analysis, the study identifies the strengths and weaknesses of using ABM for simulating the built environments. The study concludes with a remark on potential future research directions to overcome the limitations of the existing studies.

A Study on Optimal Lead Time Selection Measures of the Construction Materials (건설자재의 적정 리드타임 산정에 관한 연구)

  • Lee, Sang-Beom
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.1
    • /
    • pp.105-110
    • /
    • 2004
  • Resource procurement is an important management area because cost of resource covers 40% of total construction project cost and resource delivery has direct relationship with project performance. Integration of cost provides various potentials for effective and efficient project control. This study investigates the usefulness of time in resource procurement management focused on materials. These days, construction projects have characterized manufacture because of industrialization and component. Therefore, application of systematic resource planning has been requested in the construction. There are many companies conducting procurement of resource on the web by applying MRP, ERP etc. in the construction. However, in applying them in the construction yet, there is obstruction. MRP has the character doing its function under accurate cost prediction of resource. But prediction of resource is difficult in industry mechanism of the construction. If accurate cost prediction of resource is possible in the construction, it will be expected to reduce cost of procurement of resource substantially by applying successful resource planning model in the manufacture. On the basis of recent current, the purpose of study is to present procurement of resource system that period observance of construction and minimization of stock is possible by reflecting accurate lead-time to apply proactive thought to be able to cope with alteration of construction schedule efficiently in analyzing resource planning of the construction site.

Development of an Optimal Trajectory Planning Algorithm for an Automated Pavement Crack Sealer

  • Yoo, Hyun-Seok;Kim, Young-Suk
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.1
    • /
    • pp.35-44
    • /
    • 2012
  • In the last two decades, several tele-operated and machine-vision-assisted systems have been developed in the construction and maintenance area, such as pavement crack sealing, sewer pipe rehabilitation, and excavation. In developing such tele-operated and machine-vision-assisted systems, trajectory plans are very important tasks for the optimal motions of robots whether their environments are structured or unstructured. This paper presents an optimal trajectory planning algorithm used for a machine-vision-assisted automatic pavement crack sealing system. In this paper, the performance of the proposed optimal trajectory planning algorithm is compared with the greedy trajectory plans, which are used in the previously developed pavement crack sealing systems. The comparison is based on the computational cost vs. the overall gains in crack sealing efficiency. Finally, it is concluded that the proposed algorithm plays an important role in the productivity improvement of the developed automatic pavement crack sealing system.

Development of Home Indoor Air Quality evaluation program considering planning and construction stage (주거 건물의 설계 및 시공단계를 고려한 실내공기질 평가 프로그램 개발에 관한 연구)

  • Choi, Dong-Hee;Kang, Dong-Hwa;Kim, Sun-Sook;Yeo, Myoung-Seok;Kim, Kwang-Woo
    • Proceedings of the SAREK Conference
    • /
    • 2005.11a
    • /
    • pp.51-56
    • /
    • 2005
  • The objective of this study is to develop Home Indoor Air Quality evaluation prorgram considering planning and construction stage for architects, engineers and occupants to estimate and improve the IAQ of a home. In this study, the IAQ modeling technique was discussed to determine the appropriate modeling of housing unit in Korea. The program algorithm was developed based on the selected model reflecting planning and construction stage. This program can be applied to estimate the IAQ of a home and encourage appropriate action in advance.

  • PDF

An Analysis of Planning Practice for Reinforced Concrete Core-Wall Construction in High-Rise Building Construction (초고층건물 R/C조 코어월 선행공사의 시공계획 실무에 관한 분석)

  • Ahn Byung-Ju
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.194-201
    • /
    • 2004
  • Core-wall construction method is applied in many high-rise building constructions. This is caused by the advantages of the method such as the effect of saved construction cost and shortened period. However, the analysis study of planning practice for core-wall construction shows matters take place during core-wall construction, such as increasing in construction cost and period. These matters result from the limited work space leading to low productivity, the activity interference leading to increasing in period, additional temporary work cost and time, and delayed concrete pour activity. A large part of these can be prevented taking place by very detailed and most careful core-wall construction plan. Therefore, this study suggests improvement directions of core-wall construction planning process focused on the cooperation system of a contractor between a sub-contractor and the process.

THE RESEARCH ON CONCEPTUAL MODEL OF LNG PLANT PROJECT PLANNING EXPERT SYSTEM

  • Moon-Sun Park;Young-Ai Kim;Seung-Wook Lee;Sung-Ryul Bae;Hyun-Wook Kang;Byoung-Jun Min;Yong-Su Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1570-1575
    • /
    • 2009
  • The purpose of this research is to propose the conceptual model of Scenario-based Project Planning Expert System which has not been used in domestic LNG plant industry. This research examines data on the plant project planning expert system of domestic and oversea, analyzes the components of project planning expert systems and benchmark excellent cases. The conceptual model of LNG plant project planning expert system is established through the procedure as has been noted above. The results of this research are as follows: First, this research draws out such components of LNG plant project planning expert system as feasibility, cost control, contract management and risk management. Second, this research proposes the conceptual model of LNG plant project planning expert system which core module is consist of feasibility evaluation, life cycle cost evaluation and decision making. Finally, each module of LNG plant project planning expert system would be integrated into the Scenario-based Project Planning Expert System.

  • PDF

Systematic Literature Review of Sustainable Construction Projects for Carbon Neutrality

  • Roshan Bandiwadekar;Jong Han Yoon;Vivek Sharma
    • International conference on construction engineering and project management
    • /
    • 2024.07a
    • /
    • pp.94-101
    • /
    • 2024
  • Construction projects are responsible for significant carbon emissions, accounting for 23% of the world's total emissions. While efforts have been made to reduce these emissions, a comprehensive analysis of these efforts has yet to be conducted, making it difficult to identify research gaps and future directions. This study addresses this gap by conducting a systematic literature review of 208 papers in the Web of Science (WOS) database using Carbon, Emission, and Construction as keywords. The review was categorized into bibliometric and content analysis. The bibliometric analysis reveals that most papers focus on estimating and assessing carbon emissions through Life Cycle Assessment (LCA) (34%). The use of construction technologies, such as prefabrication and BIM, which can directly reduce carbon emissions, was limited to only 7% of the reviewed papers. Furthermore, the review revealed that 67% of the studies were conducted in China. Similarly, content analysis revealed the papers' essential findings and limitations in each selected category. Based on these findings, the study 1) suggests the technology applications in tacking, estimating and reducing carbon emissions in the construction supply chain (CSC) and 2) highlights the need for global attention to reducing carbon emissions in construction projects.

A Study on the Construction Process of u-City IT Infrastructure (u-City IT인프라 구축 절차에 관한 연구)

  • Kim, Jeong-Uk;Kim, Il-Jung
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.58 no.3
    • /
    • pp.291-296
    • /
    • 2009
  • "The Act on Ubiquitous City Construction and etc." stipulates the regulations on the planning, construction and management of the u-City. As its national-level law system is about to take its effects, future new city developments are expected to have its legal basis to be built to meet u-City requirements. Also, it is anticipated that such needs would require much more planning techniques and strategies. In reaction to those upcoming needs, this study is to search for new IT infrastructure construction process of the u-City in reality. It is also to supply with the each step framework to execute the u-City projects in more structuralize and systemize manner. Therefore, with the u-City IT infra construction guide line v1.0, purpose of the establishment of comprehensive IT infrastructure construction process.

Formwork Productivity Analysis Model for Cost-efficient Equipment Operations

  • Hyunsu Lim;Taehoon Kim;Hunhee Cho;Kyung-In Kang
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.226-230
    • /
    • 2013
  • In the tall building construction, the slab formwork largely impacts on construction cost. Because productivity of a slab formwork is influenced by a number of and the efficiency of equipment, using the equipment-based construction method, an appropriate equipment input planning is crucial for the productivity. Meanwhile, the general equipment input planning is conducted by intuition based on experience due to the lack of equipment productivity data. Thus, this study develop a simulation model to analyze table formwork productivity and to propose an optimum equipment input plan that reflects the construction process, based on the full consideration of the economic factors. This study developed a simulation model by using CYCLONE and the data for the model was collected by measuring the duration of each unit activity in the tall building where table forms were applied. It is expected that a simulation model helps users to make better decision on the equipment input planning of slab formwork.