• Title/Summary/Keyword: construction period comparison

Search Result 143, Processing Time 0.028 seconds

The Study on the Strength Properties of High Volume Fly-Ash Concrete (플라이애시를 다량 사용한 콘크리트의 강도특성에 관한 연구)

  • Paik, Min-Su;Lee, Young-Do;Jung, Sang-Jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.4
    • /
    • pp.169-176
    • /
    • 2002
  • To study of binder and fine aggregate a lot of replacement fly-ash concrete, initial characteristics, standard environment of curing temperature $20^{\circ}C$, hot-weather environment, cold weather environment of curing temperature $5^{\circ}C$. Flash concrete tested slump, air contest, setting and Hardening concrete valuated setting period of form, day of age 3, 7, 28 compression strength in sealing curing. Underwater curing specimen compression strength of age 3. 7, 28day used strength change accordingly fly-ash concrete curing temperature. Purpose of study is consultation materials in field that variety of fly-ash replacement concrete mix proportion comparison and valuation. (1) Setting test result, fly-ash ratio of replacement higher delay totting time. Same volume of fly-ash ratio of replacement is lower fly-ash ratio of replacement fine aggregate delay setting time. Setting test in curing temperature $35^{\circ}C$ over twice fast setting in curing temperature $20^{\circ}C$ and all specimen setting delay in curing temperature $5^{\circ}C$. F40 specimen end of setting about 30 time. (2) Experiment result age 28day compression strength more fisher plan concrete then standard environment in curing temperature $20^{\circ}C$, cold weather environment in curing temperature $5^{\circ}C$, most strength F43 is hot-weather environment in curing temperature $35^{\circ}C$ replacement binder 25%, fine aggregate 15%. (3) Hot-weather environment replacement a mount of fly-ash is a same of plan concrete setting period of form. Age 28day compression strength replacement a mount of fly-ash more hot-weather concrete then plan concrete.

The Survey for Successful Operation of the BTL Projects (BTL사업의 성공적 수행을 위한 설문조사 연구)

  • Ahn, Yong-Sun;Shim, Un-Jun;Jang, Gang-Hun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.1
    • /
    • pp.19-27
    • /
    • 2011
  • The capital of investment of SOC projects is too large to be taken charge of a country. The government introduces the private investment like a BTL project because of the limited national resources. However, even the company which wants order constructions, do not consider the fundamentals such as accurate estimation, capability of construction company and construction period. The purpose of the research is to suggest the basic influential factors for obtaining a BTL project and offers the concludes for the successful operation after the contract. The result of the research is followed. 54 effect successful factors are compressed into 11 principle factors by analysis on those 54 factors, CSFs of BTL business are constructed. Regression analysis is induced by variable of primary success factors and success degree, and derives the influence degree of effect successful factors in business. Regression analysis that is mentioned above showed considerable issues from importance of primary factors, prime cost fluctuation factors and comparison of management-level. So this study could suggest the effective operate plan of BTL business.

Development and Performance Evaluation of the Fourth Generation H-section Beam-to-Column Weak Axis Connection for Improving Workability (시공성 향상을 위한 제4세대 H형강 기둥-보 약축접합부의 개발 및 성능평가)

  • Kim, Pil-Jung;Boo, Yoon-Seob;Yang, Jae-Guen;Lee, Eun-Taik;Kim, Sang-Seup
    • Journal of Korean Society of Steel Construction
    • /
    • v.23 no.3
    • /
    • pp.295-304
    • /
    • 2011
  • Bracket-type connection is often used for the weak-axis steel connection. In general, a beam-to-column connection for the bracket type is fabricated at the shop and abeam splice is additionally attached to the bracket in the site. Therefore, steel construction would not be competitive due to the increase of beam splice fabrication cost and overall construction period. This paper now proposes the new weak-axis connection types without a scallop, which has more definite strength flow, simple connection details, and better workability. From the series of experiments, the proposed connections showed better strength and ductility in comparison with standard details with scallop because the thickness of the welding plate for wide-flanged, beam-to-column connection can be easily adjusted.

A Parametric Study for the Construction of Durability Test Track of a Wheel Type Vehicle (휠 차량의 내구 시험장 조성을 위한 매개변수 연구)

  • 송세철;김형근;박태건;김동준
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.6 no.1
    • /
    • pp.73-79
    • /
    • 1998
  • For the design and development of the wheel type excavator, the dynamic effects of travelling on the performance of the equipment should be first analyzed and conside- red in the initial design stage. In order to test the durability of the equipment in a short period, th travelling test should be performed over accelerated durability test tracks. which is more severe than general field roads such as city road, paved road, unpaved road and rough road. In this paper, a parametric study is performed in order to determine important design parameters of durability test track of a wheel type excavator. A rigid body model is developed using DADS and dynamic analysis is performed for the equipment travelling over several test roads with different severity. A comparison of test and analysis results is also presented.

  • PDF

Structural Performance of RC Frame with SAFE Damper (SAFE댐퍼 보강골조의 구조성능 실험적 평가)

  • So, Byeong-Chan;Lee, Chang-Hwan;Ju, Young-Kyu
    • Journal of Korean Association for Spatial Structures
    • /
    • v.15 no.1
    • /
    • pp.85-94
    • /
    • 2015
  • SAFE damper is a hybrid damper which is comprised of a friction damper and a metallic damper. These two dampers combine to resist external energy in stages. Under minor earthquake loads, the friction damper operates alone. However, the friction damper and metallic damper dissipate the energy together when a severe earthquake occurs. In comparison with other methods for seismic retrofitting, the SAFE damper has many advantages. The SAFE damper doesn't cause damage to façade of the building, and the construction period can be reduced when retrofitting. This paper describes experiments evaluating the structural performance of the SAFE damper. From the results, it was found that the structural performance of a conventional RC bare frame can be significantly improved by the installation of the SAFE damper.

European Seismic Design Practices for Building Structures (유럽국가의 건축물 내진설계 기술현황)

  • 이한선
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 1999.10a
    • /
    • pp.289-296
    • /
    • 1999
  • In order to develop and enhance our methodology of seismic design in the next generation thee is a need to analyze the environment chronicles and concept of the seismic design in foreign countries. For this purpose we have researched the cases of U.S.A and Europe. In this paper the emphasis was put on the european seismicity and seismic design practices for building structures. In this study the comparison of seismic design codes in some european countries regarding fundamental period and design base shears leads to the conclusion that there exists remarkable difference in the approaches. Particularly the base shears used in european countries give larger values than the one proposed by UBC 97. Though each european country has established similar seismic design code there are also still large difference in the level of construction technology and societal implementation of seismic codes.

  • PDF

Improvement of the Calculation Standard for Prolongation cost of Long-term Continuing Contracts Construction Project (장기계속계약공사의 공기연장 추가간접비 산정 개선방안)

  • Jeong, Kichang;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.2
    • /
    • pp.30-37
    • /
    • 2017
  • In Korea, additional indirect costs generated from the time period extension of public construction projects have been studied. Practical claims against such costs are increasing. There are no clear criteria for calculating the delay cost caused by the extension, and thus calculation methods differ across entities. Logical valid calculation methods have also not been researched. Further, there are no Korean studies on the additional indirect cost caused by a suspension in a public construction project on a long-term continuing contract. The purpose of this research is to propose a method of calculating the indirect cost incurred by construction time extension that reflects the characteristics of Korean public construction projects. The cost patterns generated during construction periods were analyzed, and then the current criteria of calculating the indirect costs caused by the extension were examined. Following this, actual conditions and practices in the field were surveyed and the current calculation method was applied to a model case to compare the actual cost and that determined from the current calculation method. Issues with the current method were identified by this comparison. Based on this, this research proposes a method of calculating the total actual cost caused by a suspension in a public construction project that is appropriate for calculating the additional indirect cost generated by a suspension in a public construction project on a long-term continuing contract.

A Case Study on the Calculation of Delay Damages for Contractors according to the Extension of Contract Period (계약기간 연장에 따른 시공자의 손실비용 산정에 관한 사례 연구.)

  • Lee Gi-Han;Kim Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.305-310
    • /
    • 2001
  • The purpose of this study is to calculate delay damages for contractors. The study has been performed by investigation of delay cost occurrence status and the analysis of subway construction cases. The results of this study are as follows: 1. Delay cost( 1day) equivalent to $0.005\%$ of total construction cost by analysis case studies. 2. Including bank interest, dealy cost is analysed as the following; $1.1\~9.2\%$ of total construction cost in part extension period, $3.3\~11.0\%$ of total construction cost in total extension period. 3. In comparison between liquidated damages and delay cost, liquidated damages account for average 20.1 times of delay costs. 4. Acceleration cost will be calculate on the basis of delay cost calculation method. In the result of this method, acceleration cost is equal to delay cost at least or must be large than delay cost

  • PDF

Assessment of environmental effects in scour monitoring of a cable-stayed bridge simply based on pier vibration measurements

  • Wu, Wen-Hwa;Chen, Chien-Chou;Shi, Wei-Sheng;Huang, Chun-Ming
    • Smart Structures and Systems
    • /
    • v.20 no.2
    • /
    • pp.231-246
    • /
    • 2017
  • A recent work by the authors has demonstrated the feasibility of scour evaluation for Kao-Ping-Hsi Cable-Stayed Bridge simply based on ambient vibration measurements. To further attain the goal of scour monitoring, a key challenge comes from the interference of several environmental factors that may also significantly alter the pier frequencies without the change of scour depth. Consequently, this study attempts to investigate the variation in certain modal frequencies of this bridge induced by several environmental factors. Four sets of pier vibration measurements were taken either during the season of plum rains, under regular summer days without rain, or in a period of typhoon. These signals are analyzed with the stochastic subspace identification and empirical mode decomposition techniques. The variations of the identified modal frequencies are then compared with those of the corresponding traffic load, air temperature, and water level. Comparison of the analyzed results elucidates that both the traffic load and the environmental temperature are negatively correlated with the bridge frequencies. However, the traffic load is clearly a more dominant factor to alternate the identified bridge deck frequency than the environmental temperature. The pier modes are also influenced by the passing traffic on the bridge deck, even though with a weaker correlation. In addition, the variation of air temperature follows a similar tendency as that of the passing traffic, but its effect on changing the bridge frequencies is obviously not as significant. As for the effect from the alternation of water level, it is observed that the frequency baselines of the pier modes may positively correlate with the water level during the seasons of plum rains and typhoon.

A Study on the Healthcare Delivery System in China (I) - Focused on the Regulations in China (중국의 의료지원체계에 관한 연구 (I) - 관련 법제도를 중심으로)

  • Lyu, Cheng;Yun, Woo Yong;Chai, Choul Gyun
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.23 no.1
    • /
    • pp.37-46
    • /
    • 2017
  • Purpose: There is little information about China's medical service system and health care facilities in Korean medical architecture papers, which is inconvenient for scholars engaged in medical building research and comparison. Futhermore, the transformation of the notion of health and the ascension of the service needs show the lack of medical function, and then make functions of hospital construction are always in the state of dynamic renewal. Therefore, the purpose of this study is to analyze the Chinese medical service system and general hospital related laws and regulations for future research to provide effective analysis of data, and find shortcomings. Methods: This study was conducted by a research on law and regulation of China's medical service system and general Hospital. Results: At present hospital construction in China is in the period of rapid development and it exposes the layout of medical health facilities is not reasonable and the service does not reach the designated position and so on. Overall, it requires more detailed guidelines to enhance the quality of medical health services. Implications: It is expected that the research of this paper will provide effective reference for future research on Chinese medical architecture system and medical facilities, and can promote and perfect the construction of Chinese medical architecture theory system.