인테그레이션과 컴퓨터 사용이 건설프로젝트에 미치는 영향 평가 (An Evaluation of the Impact of Integration and Computerization on Construction Projects)

  • 김찬규
    • 한국건설관리학회논문집
    • /
    • 제2권4호
    • /
    • pp.92-97
    • /
    • 2001
  • The level of awareness and actual implementation of integration and computerization in the construction industry is growing. However, it is not clear at this point how to assess the extent of their impact and to identify in which ways they better support the construction projects related to their success. The objectives of this research are the development of a model to evaluate the impact of integration and computerization on construction projects and the recommendation of guidelines for companies in identifying suitable ways for them to incorporate integration and computerization Into their operation. The developed conceptual model has been found robust enough to be used as a benchmarking tool in evaluating the performance of the construction process and to strategize its future operation.

  • PDF

BTL사업 운영리스크 분석 모형 개발에 관한 연구 (A Study on the Development of an Operation Risk Analysis Model in BTL Projects)

  • 이정순;이정훈;오세욱;유현석;김영석
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.475-480
    • /
    • 2008
  • BTL 사업은 시공비보다 운영비의 비중이 크고 장기간의 운영계획을 단시간에 수립하여 계약에 임하기 때문에 계약단계에서 운영 리스크를 예측하는 것은 사업의 성패를 좌우하는 매우 중요한 문제로서, 약정한 수준의 서비스를 제공하고 적정 수익률을 확보하기 위한 운영 리스크의 분석은 필수적이라 할 수 있다. 그러나 국내에 자금 출자와 시설 운영을 수행할 수 있는 전문 운영사의 숫자가 10여개에 불과하고 운영사 대부분의 규모가 영세하여, 운영사 내에 리스크 분석 시스템이 제대로 갖춰져 있지 않은 것이 문제점으로 대두되고 있다. BTL 사업에서 발생 가능한 리스크를 효율적으로 관리하기 위해서는 리스크 인자를 확인하고 경제적 위험도와 비경제적 위험도 그리고 발생빈도를 고려하여 리스크 인자의 우선순위를 도출하는 과정이 필수적이다. 그러므로 이 연구는 설문조사를 통해 운영사 관점에서 BTL 사업에서 발생 가능한 리스크 인자를 도출하고 우선순위를 분석함으로써 운영사의 대응전략 수립 및 리스크 관리업무의 효율성을 제고할 수 있도록 리스크 분석 모형을 제시한다. 이 연구에서 도출된 운영 리스크 분석 모형은 운영사로 하여금 BTL 사업에서 발생될 수 있는 리스크에 대한 대응전략을 수립할 수 있도록 하여 운영 리스크 관리 업무의 효율성을 제고할 수 있을 것으로 기대된다.

  • PDF

건설사업 관리 (CM)에서의 안전관리 모델에 관한 연구 (A Study on the Model of Safety Management in the Construction Management)

  • 김영수;강경식
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2003년도 추계학술대회
    • /
    • pp.47-57
    • /
    • 2003
  • Construction Management(CM) system, which was introduced some years ago to large national construction projects, such as the construction of Incheon New Airport, construction of high-speed railroad and World Cup stadiums, is considered to be still in its early stage and safety at each step of CM is very poorly controlled. In an attempt to improve such inferior safety management of domestic CM, this study made comparative analysis about operation system of safety management with CM system in domestic and abroad. Also suggested the model under consideration with CM, which is suitable for the situation of Korea.

  • PDF

건설공사(建設工事) 실무분석(實務分析)을 통한 조직관리(組織管理) 개선방안(改善方案) (The Improvement Plan of Organization Management Through the Survey of Actual Condition in Construction Work)

  • 최병주;최현;최석우;김옥규
    • 한국건축시공학회지
    • /
    • 제8권2호
    • /
    • pp.121-129
    • /
    • 2008
  • Domestic exoteric construction market by opening of world construction market with recent FTA of rapidly change. On these time, need quality increase of construction to possess government official and international competitiveness of customer satisfaction by offering consumer building of good quality. Therefore, must establish direction to inspects and must advance forward formation government official's present actual conditions for building company's QI. This study is as following if summarize studying result of formation government official to improve quality in construction spot. First, formation's CEO will for QI need side improvement the formation government official enemy by important thing. Second, at checking activity and systematic action that participate of responsible persons cooperation enterprise space-time by complete charge department organization should be achieved. Third, complete charge department for quality control operation large size construction firm substantially formation Organizational well operate, but heavy hydrogen building company was construed by greatly unprepared misgovernment. AHP analysis result complete charge department is serious necessity, and the CEO under direct control organizational structure was construed by thing which can bring excellent effect in operation management side of quality business side and formation. Therefore, heavy hydrogen building company should does to occupy competitive power high position with tissue at active quality complete charge deputy.

건설사업관리(CM)에서의 안전관리모델과 안전관리정보시스템 구축에 관한 연구 (A Study on the Set up of Safety Management Model and Safety Management Information System in the Construction Management)

  • 김영수;강경식
    • 대한안전경영과학회지
    • /
    • 제5권4호
    • /
    • pp.45-61
    • /
    • 2003
  • This study suggests a safety management model for construction management (CM) suitable to domestic conditions so that inefficiency resulted from the operation of construction projects by public and private institutes according to different systems can be eliminated for the securing of systematic and efficient safety management. Based on the suggested safety management model, this study also develops a safety management information system that can efficiently and consistently manage and maintain a large quantity of information, and give necessary supports in a speedy way in the managing of construction projects.

건설사업관리의 BIM(Building Information Modeling) 적용 가능성에 관한 연구 (A Study on The Possibility of BIM(Building Information Modeling) Application of Construction Management)

  • 심진규;이혜인;김재준
    • 한국디지털건축인테리어학회논문집
    • /
    • 제10권2호
    • /
    • pp.49-60
    • /
    • 2010
  • The production process of construction industry is different from thing of the general manufacturing, likewise various participants make temporary teamwork for success of the project through sharing of information. But the each role of participants is individually changed to step in construction process stage and moreover it has complicated, entangled interests. The Construction Management was inducted for the effective management and operation of construction project. The Key of the Construction Management success depends on the cooperative relationship relation to major participants. The domestic construction system is difficult with many trial and errors for the frequent plan change. As the building are more bigger and complicated, Building Information Modeling is demanded design and maintenance. This evaluation was done by the trust on the system as well as Construction Management. And then it applies the BIM it analyzes the example of construcrion project.

Optimal Implementation Strategies of Building Information Modeling for Construction Projects of LH

  • Lee, Ji-Eun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.60-62
    • /
    • 2015
  • The BIM-based architectural design can be the optimal method to improve all sectors of construction industry and reduce environmental impact through digital technologies. The goals and effects of BIM needs in LH to be newly planned based on the experience of public sectors, which will ultimately contribute to maximization of effectiveness. Referring the excellent case in the UK, the current BIM standards according to maturity level 2 handle the contents related to modeling, collaborative data production, data management and assure BIM data have to be used from building construction to operation and maintenance of buildings. Therefore the strategy for the utilization of BIM for construction projects in LH consisted of three steps; first, the minimization of defects via BIM: second, strengthening the competitiveness of construction and asset management: third, upgrading the system of building production and maintenance control. After this trial, LH can accumulate know-how for building construction to be more costeffective and competitive.

  • PDF

적시생산 관리시스템에 관한 연구 - 철근공사를 중심으로 - (A Study on Prototype of Just In Time Production Management System)

  • 이규현;최인성
    • 한국건축시공학회지
    • /
    • 제5권4호
    • /
    • pp.153-164
    • /
    • 2005
  • This study aims at establishing JIT production management system to enable manage the resources input into from procurement through construction based on correct identification of the process, an analysis on the amount of input materials and information sharing. This study has focused on the process control and working process of rebar work in domestic apartment house construction where the overall scope of Process from the planning phase to the construction phase has been analyzed in this study. Also construction phase was selected for the application of a sample case. A basic model for JIT production was generated with these processes. Furthermore A questionnaire and the on-site survey with process, checklist and control data were prepared and performed for the application of JIT production management model into rebar work. The governing scopes of JIT production management system include process management, material management, yard loading and moving management and inventory control, and the operation of each control item

건설사업관리(CM) 안전관리 정보시스템 개발에 관한 조사연구 (A Field Survey on the Development of Safety Management Information System in the Construction Management)

  • 김영수;박종근
    • 한국안전학회지
    • /
    • 제19권2호
    • /
    • pp.75-87
    • /
    • 2004
  • This study suggests a safety management model for construction management (CM) suitable to domestic conditions so that inefficiency resulted from the operation of construction projects by public and private indtitutes according to different systems can be eliminated for the securing of systematic and efficient safety managment. Based on the suggested safety management model, this study also develops a safety management information system that can efficiently and consistently manage and maintain a large quantity of information, and give necessary supports in a speedy way in the managing of construction projects.

국내 건설폐기물 관리 지침 고찰 (A Review of the Domestic Construction Waste Management Guidelines)

  • 김지혜;차희성;신동우
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.425-430
    • /
    • 2007
  • 건설산업에서 폐기물 관리는 환경적${\cdot}$경제적 측면에서 중대한 영향을 미침에도 불구하고, 건설폐기물 관련 통계자료에 의하면 국내 건설폐기물 관리 수준이 상대적으로 낮음을 알 수 있다. 이에 따라 본 연구는 건설폐기물 관리의 요체인 건설폐기물 관리 지침을 고찰하여 문제점을 분석하고, 효과적인 폐기물 관리를 유도하는데 적합한 건설폐기물 관리 지침 개선 방향을 제시하고자 한다. 국내 기존 건설폐기물 관리 지침을 분석한 결과, 폐기물 관리의 목적이 총체적으로 법적인 기준을 벗어나지 않도록 관리하는 데 초점이 맞추어져 있음으로 인해 분석 기준인 "계획, 실행 및 운영, 점검 및 시정조치" 측면에서 효과적인 폐기물 관리 지침으로서의 역할을 다하고 있지 않음을 파악하였다. 또한, 문제점 분석 결과를 기반으로 "계획, 실행 및 운영, 점검 및 시정조치" 측면에서 국내 건설폐기물 관리 지침의 개선 방향을 제시하였다.

  • PDF