Difficulties in riding, driving and parking are a common issue which inevitably appears in city urbanization and city modernization development all over the world. However, those cities differ in controlling the traffic. According to the specific practice in Shanghai, this article presents the various factors which affect the traffic capacity and the operation quality. This article also outlines transportation system management technique of overall coordination and comprehensive control in the following seven aspects: controlling traffic motivation; improving traffic distribution; reasonably and scientifically selecting travel mode, travel route and travel time; reinforcing traffic management and road construction. The article finally suggests that above mentioned points are cost-effective ways of handling traffic plight for metropolitan transport.
City Train Technology that is large and complex system and consists of mechanical, electronic, electric, materials, computer, communication, civil/track etc. is very important area of railway industry, national fundamental industry. The standardization of city train system as a public transportation method and foundation of national economy is very important in order to do effective operation and to get fundamental technology, and the information system of the standards is required to operate the city train system effectively. By building data base of city train system design knowledge using computer-aided system engineering tool-Cradle, the system development issues and the design solutions are used by all engaged persons, and are managed by modeling and documentation. And this system will support architecture design consistently and effectively by applying this system to formalize early development process, to system requirements and configuration management, to system interface analysis and management and to system behavior analysis etc.. This study is for construction of data base of system design knowledge through making data base of many kinds of standards using CASE tool based on System Engineering Process, and introduces a model to support concurrent engineering for all engineers involved in system development allowing access to standard DB through Web from anywhere and at anytime.
This paper presents GDOCF(Government Document Enterprise Architecture Framework) based on the direction of EA(Enterprise Architecture) framework to build GDOCEA. The construction of EA for GDOC offered various types of information technology Platform which advanced the interoperability between Government Information Systems. In addition, it insured the interoperability between the e-Government Initiatives and helped a consistent management for information resource. As a result, MOGAHA could support a policy decision and capital investment plan for information. Also, all the information needed for the operation and management of GDOC has been being referenced, shared and utilized as EA repository. Eventually Pilot EA would be a corner stone to build EA master plan considering all the information systems in MOGAHA.
Purpose: This study is in order to secure high quality of military supplies, it is important to secure design quality in the development phase. I will review how to establish a quality assurance system in the development phase based on the author's seminar presentation contents and application example of Hanwha Systems Co., Ltd. Methods: To guarantee design quality in the development phase, in 2002, quality assurance system that is adequate for SQA(Software Quality Assurance)'s requirements of CMM(Capability Maturity Model) was conduct. In 2009, based on the CMMI(Capability Maturity Model Integration) Level 5, there has been continuous and reenforced quality assurance activities. Results: By suggesting the construction and a case study on application of R&D quality assurance, it would be helpful for companies aiming to construct or enhance quality assurance system. Conclusion: To secure high quality for military supplies, a development QA system should be established to secure quality in the development phase. In addition, Total life cycle QA system for development, mass production and operation phase should be reestablished.
This study performed the construction of test bed for the combination of the health monitoring system In Yongjong grand bridge with the safety management network system in order to explore the feasibility of combining the existing monitoring system with the safety management network system. For this purpose, connection program which consists of DAQ sender server program and DAQ receiver server program has been developed. DAQ sender server program installed in the connection server, which is located on the DMZ zone of the existing monitoring system, plays the role of communicating with the monitoring system. On the other hand, DAQ receiver server program installed in the connection server, which is located on the integrated operation center of the safety management network system, plays the part of gathering real time and tim history data of the existing monitoring system and storing them in the integrated operation server through the communication with the DAQ sender. Test bed demonstrated the feasibility of combining the existing monitoring system with the safety management network system.
Kim, ChiGon;Kwon, HeeChoul;Zun, Hyungdo;Yoon, KyungBae
The Journal of the Convergence on Culture Technology
/
v.3
no.3
/
pp.43-49
/
2017
The purpose of this study is to study the standardization of the core business process in the chemical manufacturing industry and to establish a production information management system for the purpose of establishing the production information management system that can achieve mid -To be applied. The development methodology for the standardization of the chemical manufacturing information system is applied to the production information management system development methodology (PSDM) that was developed and developed by the Agency for Technology and Information Promotion of Small and Medium Enterprises. The standardization target is the system structure, It is a core business process that becomes a skeleton during construction. In this study, the chemical manufacturing SMEs and related professional IT companies who want to build the production information management system can apply the standardized core business process more effectively to build the system more effectively, and provide ease of installation and reliability to the system, In order to maximize the utilization of processes, follow-up education training and maintenance measures are suggested. Applying the results of this study, it is possible to eliminate the unreasonable elements of the production process, improve the quality of production product, and reduce production cost.
Fire accidents in foreign countries, like the accident in a thermal power plant in Beijing, the accidents in domestic power plants, including Boryeong Power Plant in 2012 and Taean Power Plant in 2016, a disaster in a nuclear power plant in Fukushima in 2011 or the large-scale power failure in California in 2001 are safety accidents related to electric power, which caused losses in the people's stable lives and the countries. Electricity has an absolute impact on the people's life and the economy, so we can easily expect the serious situation affecting economic growth as well as direct damage to the protection of the people's lives and the losses of properties, if there are fire or explosion accidents or radioactive leak because of negligence in safety management, or problems because of natural disasters like an earthquake in power plants that generate electricity. In this study, it was drawn the improvement of the organizations exclusively in charge of firefighting, the operation of a program for the improvement of professional competency, the development of a customized firefighting management system for plants for systematic firefighting safety management and the improvement of the earthquake-proof correspondence system, which has recently become an issue, as measures for improvements through a survey of the actual conditions concerning the necessity of the construction of a firefighting safety management system for power plants with five power generation companies, including Korea Southern Power Co., Ltd., and the persons in charge of firefighting safety Korea Hydro & Nuclear Power Co., Ltd.
Almost all companies have paid much attention to the safety management ranging from maintenance to operation even at the stage of designing in order to prevent accidents, but fatal accidents continue to increase throughout the world. In particular, it is essential to systematically prevent such fatal accidents as fire, explosion or leakage of toxic gas at factories in order to not only protect the workers and neighbors but also prevent economic losses and environmental pollution. Though it is well known that accident probability is very low in NPP(Nuclear Power Plants), the reason why many researches are still being performed about the accidents is the results may be so severe. HRA is the main process to make preparation for possibility of human error in designing of the NPP. But those techniques have some problems and limitation as follows; the evaluation sensitivity of those techniques are out of date. And the evaluation of human error is not coupled with the design process. Additionally, the scope of the human error which has to be included in reliability assessment should be expanded. This work focuses on the coincidence of human error and mechanical failure for some important performance shaping factors to propose a method for improving safety effectively of the process industries. In order to apply in these purposes into the thesis, I found 63 critical Performance Shaping Factors of the eight dimensions throughout studies that I executed earlier. In this study, various analysis of opinion of specialists(Personal Factors, Training, Knowledge or Experience, Procedures and Documentation, Information, Communications, HMI, Workplace Design, Quality of Environment, Team Factors) and the guideline for construction of PSF were accomplished. The selected method was AHP which simplifies objective conclusions by maintaining consistency. This research focused on the implementation process of PSF to evaluate the process of PSF at each phase. As a result, we propose an evaluation model of PSF as a tool to find critical problem at each phase and improve on how to resolve the problems found at each phase. This evaluation model makes it possible to extraction of PSF succesfully by presenting the basis of assessment which will be used by enterprises to minimize the trial and error of construction process of PSF.
A variety of risks caused by natural, technological and biological hazards threaten a business continuity of an organization. Business continuity is very important issue for all organizations and its proper management may control success and failure of an organization. Business continuity plan (BCP) may be defined as a management process which provides a business continuity. BCP includes risk management, operational continuity plan, response/ recovery, exercise/study and crisis communication, etc. Risk management is a systematic method to identify, analyze, evaluate and treat emergency risks and risk assessment is composed of identifying, analyzing and evaluating emergency risks. Risk assesment is the first step for making BCP. In this study, risk assessment has been conducted for sewer laying project. Through assessing risks, 18 risks that may threaten the construction operation are identified and it is founded to be that high levels of risks which require treatment are 'collapse of excavation surface', 'breakage of ground infra-facilities', 'noise & dust dispersion' and 'rise of material costs'.
Proceedings of the Korean Institute of Information and Commucation Sciences Conference
/
2012.05a
/
pp.378-379
/
2012
Nowadays, great energy consumption in advanced electrical industry has called up the great y efficiency. Electric power IT industry such as intelligent electric power system is receiving great attention and being marked up as a new growth engine. Through Intelligent electric power system, the electric power supply can be balance optimized according to demand, giving huge cost savings advantage for energy imports, infrastructure construction and operation. Nevertheless, the intelligent system promotes better reliability in power supply. Manual electric power management using man power appears to be non-practical. Real time electric power management on all facilities and equipment can be done through an intelligent electric power system, any accident break out issue can be easily recorded and recognized. In this paper, a fully integrated intelligent switchgear electric management system is developed to monitor and remote control the electrical switch based on smart phone. The proposed system is superior than the existing switchgear management system's weakness and can sharply improve effectiveness and stability with low cost. In future, the proposed system is expected to be greatly contributed to the advancement of the IT industry in electric power management.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.