• Title/Summary/Keyword: construction of landscape

Search Result 1,020, Processing Time 0.024 seconds

A Fundamental Study on the Causes of Defects in Landscape Construction Projects Based on the Ratio of In-House and Supplied Materials -Focused on Incheon Metropolitan City- (조경공사업에서 관급자재·사급자재 비율에 따른 하자 원인에 대한 기초연구 -인천광역시 사례를 중심으로-)

  • Sang-Won Hwang;Sung-Jin Yeom;Chung-In Park
    • Journal of Environmental Science International
    • /
    • v.32 no.11
    • /
    • pp.821-831
    • /
    • 2023
  • Recently, landscaping construction has played a significant role in enhancing the quality of life for citizens by creating and maintaining outdoor spaces. However, landscaping projects vary in material procurement depending on the contracting method, and they also present various challenges in defect occurrence and defect rectification due to their specialized nature. In this study, we classified different types of projects based on material procurement ratios and conducted on-site assessments of defect status by specific processes. We also analyzed the itemization of material ratios and defect rectification costs. The results revealed it was found that projects with a higher proportion of government-provided materials had the poorest defect status in terms of planting works and also incurred the highest defect rectification costs. Moreover, conflicts concerning the responsibility for defects arose. Currently, there are no specific guidelines for setting standards for the proportion of government-provided materials in landscaping construction contracts. Furthermore, there is ambiguity in the management of defect rectification. Therefore, it is necessary to establish a systematic landscaping construction contracting framework by providing institutional guidelines tailored to local governments or the circumstances of contracting entities and to conduct thorough reviews of construction processes.

A Study on the System and Process of the Construction and Management for the Royal Garden and Landscape in the Late Choson Dynasty (조선 후기 원유의 영선체제와 과정에 관한 연구)

  • 전영옥
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.26 no.2
    • /
    • pp.73-90
    • /
    • 1998
  • The construction and management of the royal garden and landscape were the most significant project in Choson Dynasty. The kind of the royal garden and landscape were the rear garden of the palace, the groves of the royal shrine and orchard, etc. As the important project of the country, these constructions were controlled by the administrative system without division into the fields of engineering, building and landscaping. The purpose of this study is to investigate the administrative system. In particular, this study is focused on the construction and management of the royal garden and landscape in Hanyang from the 18th century to the late 19th century. This study is based on the analysis of historic documents and a survey of the relics. The results were summarized as follows : 1) The administrative system of the construction and management of the royal garden and landscape was composed of the government offices under Industry Board as a permanent organization - Yongjosa, Santaeksa, Chunchonsa, Songonggam, Changwonso - and Togam as a temporary organization. In addition to these organizations, there were Revenue Board, Ceremony Board, Military Board, which served as supporting organizations. The control of the construction and management of the royal garden and landscape was held by decision makers, executors of works and management. 2) The general process of the construction and management of the royal garden and landscape included Sangji and Kyuho다 as the first step; In case of buildings and facilities, according to former examples and drawings, the most of the planning and design was already fixed. In the case of landscape, those things aimed at construction according to the existing lie of the land. The works in the 2nd step; This process was divided into the construction of facilities and planting. In case of construction of facilities, those works were done by Togam and Songonggam. The high cost works were carried out through Togam and normal repairing works were completed by Songonggam. In case of planting, those works were carried out through Chunchonsa and the military. The management in the 3rd step; This process was done by two parts like the process of works. In case of facilities, management was done 효 the officers of Pongshim. In case of groves of newly - planted trees, this management was done by Tongsanbyonlgam and Tongsanjik who served cultivation and harvest of fruit trees as an expert.

  • PDF

A Study on the Improvement Plan through Analyzing the Perception of Expert Group about Landscape Construction Defects (조경공사 하자에 관한 전문가 집단간 인식분석을 통한 개선방안 연구)

  • Lee, Sang-Suk;Yu, Joo-Eun
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.40 no.4
    • /
    • pp.104-113
    • /
    • 2012
  • This study aimed to find out the improvement plan through analyzing the perception of the expert group engaged in landscape architectural construction and to focus on analyzing the expert groups' experience on Landscape Construction Defects (LCD), defect liability, warranty period, and implementation of the defect liability. The results are as follows: 1. Regarding the experience on the LCD, landscape construction contractors were an awareness of the LCD issue at a serious level, while public-sector clients recognize moderately the LCD issue; and on the first priority in defect implementation, landscape construction contractors considered repair cost while public-sector clients value the identifying causes of defects. 2. In disagreement on the defect liability, landscape construction contractors attributed it to client's lack of responsibility for maintenance while public-sector clients ascribed it to the absence of dealing a criteria with LCD, and regarding the appropriate defect implementation, public-sector clients preferred the following objective by dealing the criteria with LCD while landscape construction contractors advocates by sharing the responsibilities for dealing with LCD based on the identified causes of construction defects. 3. Regarding the warranty period, the public-sector clients considered the 2-year warranty period as appropriate while landscape construction contractors considered it comparatively long, and concerning the commencement of defect warranty period, the public-sector clients viewed it as it should commence to cover the overall completion of the construction while landscape construction contractors perceived it to start on the completion of each work. 4. As for the improvement of the defect implementation system, public-sector clients considered it necessary to establish the objective dealing the criteria with LCD while landscape construction contractors viewed the legislation of maintenance duty. Also, with regard to the important value in establishing and dealing the criteria with LCD, public-sector clients pointed out the objective of the criteria for determining the defects per work type while landscape construction contractors suggested client (user)'s maintenance duty. Because of research, because the system in dealing with LCD is an absence of LCD management agency and dealing the criteria with LCD, it is needed to establish an LCD management agency and make the system in dealing with LCD.

The Visual Impact Assessment in Dam Construction Using Visual Impact Assessment Method (경관영향평가 기법을 통한 댐건설에 대한 경관영향평가)

  • 김대현;구본학
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.27 no.4
    • /
    • pp.80-86
    • /
    • 1999
  • The purpose of this study was to suggest a case study and anlaysis of the visual impact in dam construction through visual impact assessment method in Dong-sang river. The results can be summarized as follows; 1) For the evaluation of the visual impact of dam construction, five steps such as field analysis of visual status, finding visual sensitivity area and visual control point, making visual simulation material and evaluation, and visual impact analysis and assessment were suggested as desirable. 2) In the case study, the visual impact of dam construction was evaluated to be simple, unique, modern, static, cool and unfamiliar. 3) There was a few difference between the pre-construction and post-construction in statistical test. Especially, The dam in Man-Jee area was evaluated to be artificial, unique and destroyed in statistical difference, and then we design dam structure with visual friendliness. 4) In conclusion, there was high correlation between pre-construction landscape and post-construction landscape through semantic differential scale method using eleven adjectives. Therefore, we state that there is no visual impact for the dam construction for the moment.

  • PDF

Discussion on Pending Tasks of the Journal of the Korean Institute of Landscape Architecture (한국조경학회지의 당면 과제에 대한 고찰)

  • 김민수
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.31 no.5
    • /
    • pp.121-129
    • /
    • 2003
  • The purpose of this research was to discuss pending taste of the Journal of the Korean Institute of Landscape Architecture(KILA). Two subjects were discussed; one was the role of KILA as a supporter of landscape research, and the other was the role of KILA as a safeguard for its members. The results of this research were as follows. To support landscape research, several proposals were suggested. It is necessary for the development of landscape architecture for us to share some pages of our journal for essays which deal with current landscape issues, in order to introduce advanced overseas landscape trends or landscape techniques. For the field of landscape construction and landscape management, it is necessary to prepare a column of technical notes which introduce new techniques of landscape construction and management. For the field of landscape design, a larger seperate volume must be prepared with color printing. It is an efficient way to cooperate with other institutions that have the same member as KILA. To safeguard KILA members, it is important to maintain our status as a registered journal of Korea Research Foundation and to publish an international journal. For prospective young researchers, publication of an english journal is under consultation with the Japanese Institution of Landscape Architecture and the Chinese Institution of Landscape Architecture. The publication of an international land-scape journal to be recorded in the ISI journal in the near future will promote the research abilities of KILA members.

Comparative Study of Cost Estimate System in Landscape Architectural Construction - Comparison of Unit Price between Actual Construction Cost and Standard Quantity per Unit - (조경공사 적산방식의 비교연구 - 실적공사비와 표준품셈의 단가비교 -)

  • Jung, Un-Soo;Choi, Key-Soo
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.40 no.2
    • /
    • pp.97-111
    • /
    • 2012
  • This study aims to find a proper construction cost calculation method by comparing unit prices of cost estimate in landscape construction among other public ordering construction projects. There were 7 out of 12 items from the actual work cost in the first half of 2011 were compared. The 12 items were classified as landscape Architectural construction and the 7 items were the approximate standard. As applied construction types, the comparable 35 items out of the 80 actual work cost items applied to 5 sites were compared to the unit price of the standard quantity per unit in March 2011, which was the approximate standard. Actual construction rate of the 7 items in the category of landscape sector was 104.86% for each item and 92.09% as a total construction cost. The high actual construction rate was caused by the high rate of seed spray depending on the status of applying rocks. However, there were more fundamental reasons for the cost generated from aslope treatment for grass and seed spray. So, it requires more detailed regulations on the modification factors for each soil type, the standard and needs to improve theillogical standard quantity per unit system. Actual construction rate of the 35 items in the applied sectors of civil engineering and architecture was 78.65% for each item and 71.31% (70.17%) as a total construction cost. This shows that actual unit cost cannot reflect actual cost structurally and standard quantity per unit system lacks practicality in terms of construction due to thelabor force. 85.1~91.2 % actual construction rate announced by the Ministry of Land and Maritime Affairs referred to the newly switched items. So the result was estimated as actual construction rate. This requires supplementation after verification in order to make the actual work cost produce at a proper rate. Also, standard quantity per unit system needs complementation with these actual data and so on.

Characteristics of Periodical Changes on Standard of Estimated Unit Manpower and Material of Landscape Architectural Construction Korea (우리나라 조경공사 표준품셈의 시대적 변천 특성)

  • Lee, Kwan-Hee;Yun, Ju-Cheul
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.37 no.1
    • /
    • pp.131-138
    • /
    • 2009
  • This research was carried out to keep a sharp look-out on changes of estimated unit power and material in landscape architectural construction in Korea from 1962 to 2007 and to suggest basic information for its desirable direction in the near future. The research results are as follows. At first, work classification of estimated unit power and material landscape architectural construction was included under the earth work and in 1974 it had the name which was called landscape architectural process with earth works, and in 1984 the estimated unit power and material of landscape architectural construction was separated from the earth work but it was still under name of estimated unit manpower and material of the engineering construction. In 1972 the estimated unit power and material began with a 'planting' and a 'pruning' and still consists of 7 work classification total: 'sodding and herbaceous sowing', 'digging out', 'planting', 'digging round the root', 'keeping and management', 'rubble masonry' and 'planting for protection of rocks split section'. The processes consist of 29 sub-processes in total. The lawn construction was mainly established in the 1960s, the planting construction in the 1970s, the keeping and management in the 1980s, split section protection in the 1990s along with new technology with keeping management in the 2000s. On the basis of these research results, the process to be added in the near future could be related to new material and new technology and the process might be much more subdivided.

Research on a Modification of Rural Amenity Landscape Survey Table - Centered on 2008 Rural Amenity Selection 100 - (농촌경관자원 조사의 문제점 및 개선방안 연구 - 2008 농촌어메니티 100선을 중심으로 -)

  • Jeong, Ho-Hyun;Jung, Nam-Su
    • Journal of Korean Society of Rural Planning
    • /
    • v.16 no.4
    • /
    • pp.171-178
    • /
    • 2010
  • As rural landscape is considered important elements of rurality, there are many concerns about management and conservation. Rural development administration have performed rural amenity resources survey project in South Korea from 2005 for verifying states and efficient management of rural amenity. There are some problems about ambiguous definition of rural landscape range and data overlap. In this research, we reviewed rural amenity resources survey focusing rural landscape and analysized elements of 50 complex landscape resources in 2008 rural amenity selection 100. Finally, we suggested landscape viewpoint resource table in place of rural landscape because it can minimize data overlap in survey project.

A Study on the Quantifying of Rural Landscape Picture by Fractal Index (프랙탈 지수를 이용한 농촌 경관사진의 정량화 방안 연구)

  • Jeong, Ho-Hyun;Jung, Nam-Su
    • Journal of Korean Society of Rural Planning
    • /
    • v.16 no.3
    • /
    • pp.11-17
    • /
    • 2010
  • With international attention to the rural landscape, there have been landscape management and conservation efforts. Because it contains characteristics of rural area, rural landscape has been recognized as an important component of rurality. With rural amenity resources survey projects launched since 2005, rural landscape categorization and evaluation such as resource value, use value, beauty, originality, traditionality, maintenance are performed by expert questionnaire survey and 100 rural amenity resources are selected. In this study, we performed fractal analysis for developing evaluation system of the rural landscape photographs. In evaluating processes, main and surrounding landscape are separated and fractal indexes are calculated and analyzed with beauty value scoured by experts. Results show that beauty value is not significantly related with fractal index but differences of main and surrounding landscape fractal index.

A Study of Landscape Management Techniques based on Viewing Characteristics of Mountain Landscape - Focused on the Surrounding Areas of Bukhansan Mountain -

  • Park, Moon-Ho
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.38 no.5_2
    • /
    • pp.163-175
    • /
    • 2010
  • This study is based on the viewing characteristics of mountain landscapes. It investigates whether the current landscape management-related regulations are efficient in terms of the viewing characteristics of the mountain landscape against Bukhansan Mountain in which the conventional landscape management techniques were used. In addition, some viewing characteristics of mountain landscapes, such as distance from the view point to the target mountain, angle of elevation, altitude, gradient, have been analyzed and 3 cases of viewing condition have been simulated. The following results were obtained: i) Mountain landscapes can be managed up to 7~8 times of the mountain height with a $5{\sim}9^{\circ}$ of elevation angle. ii) In the Natural Landscape District which is situated on the hillside, it is reasonable to include altitude, gradient as criteria for regulation. iii) According to a simulation of the construction permit height by viewing distance, it was confirmed that buildings can be constructed up to 111.55m when viewing the 20% ridge, 150.75m when viewing the 50% ridge and 189.05m when viewing the 70% ridge. iv) The construction permit height varies depending on the landscape analysis method that is used and the application conditions. It is therefore unfair to apply height limit regulations to all buildings without considering the geographical features or viewing characteristics. v) It is unreasonable to apply 2~3 management techniques to the same area for landscape management. Therefore, we recommend the Focused Landscape Management Area based on the landscape master plan as a integrating mountain landscape management techniques.